The Site (C_SITE) is an attribute of the Plant (C_PLANT) and is loaded in WBP directly by the PSL Data team. |
1. There is a plant but no site => The PSL Data team needs to assign a site to the corresponding plant => Create a ticket to contact them. 2. There is neither a plant nor a site => The plant needs to be updated in the master data of the responsible cost center. The procedure to do it depends on the Origin flow :
|
The Site is an attribute of the plant maintained in the profit center of the cost center.
There are 2 cases where a cost center can not be assigned to a plant:
For other cases:
The Site is an attribute of the plant maintained in the profit center of the Responsible cost center of the order/WBS.
The Site is an attribute of the plant maintained in the profit center of the Responsible cost center of the IFRS16 contract
The Site is an attribute of the plant inputted manually in BW with Non ERP procedure
The site is an attribute of the plant of the Responsible cost center that is inputted manually in a determination table.