1 PURPOSE


This work instruction describes the process for maintaining (creation, changes) in SAP for the following material types including samples:

Process Flow

Finished Goods/Intermediates creation (Material Type: ZPRO)


Finished Goods/Intermediates change (Material type: ZPRO)


Factory Goods creation (Procured Materials) (Material type: ZROH, ZHBE, ZUNW, ZLAG, ZHRS)



Factory Goods change (Procured Materials) (Material type: ZROH, ZHBE, ZUNW, ZLAG, ZHRS)


2 PROCESS DESCRIPTION


Requestor (can be from various functions, for example R&D, planning, etc.) initiates business request and submits it to the Plant Data Steward depending on:


Process step by step:

  1. Plant Data Steward and/or product steward submits a request to PSRA for MSDS (if required), HTS and ECCN codes.
  2. Plant Data Steward submits a request to Data Management (providing a filled out Request Form) to set up a global view (at this time the material is also temporarily blocked until all local views have been created). We make sure that there are no duplicates already existing in the system, and if all required data has been provided, set up the Global view as requested. Then the DM ticket is closed and the Plant Data Steward receives a notification that the Global view is completed.
  3. Plant Data Steward gathers all information required for the local views (using the Collection form).
  4. Plant Data Steward populates all the collected data for the local views.
  5. Plant Data Steward advises Manufacturing, QM, Procurement and Logistics that a new item has been created so they can set up additional data (BOMs, routings, inspection plans, QIR's, Source List, etc.)
  6. Once all additional data is created, the Plant Data Steward advises Finance that a new item was created.
  7. Finance runs Costing.
  8. Plant Data Steward then releases the block.


Data Governance is responsible for material maintenance process and its changes.

3 PROCESS DESCRIPTION FOR DMO


3.1 New Material Code (no code presently in SAP)

3.1.1 Preliminary checks and request validation



3.1.2 Check for potential duplicates - MM03


Transaction: MM03 - view material master 

By pressing multiple choice button, user receives pop-up window with search options for material master 



Insert the search value in * * and replace any spaces or special characters with * to get the exact value or wording in any description or numbering in the System, whether that is a part of a larger description or wording or the exact same.

Press Enter.

If you find an existing material but its description, double click on the material and compare information with information provided in the request form. If material data match the data in the form or there is a few differences, go back to the requester. But if you didn't find matching records, proceed with new material creation. 

3.1.3 Create material - MM01


⚠ Request for new material should mainly be received from Plant Data Stewards, in case if it comes from another person, an approval should be granted prior processing the request (please refer to the Plant Data Steward reference table in Appendix  – List of Plant Data Stewards for both Structural and Process Materials).

Transaction: MM01 - create new material 

Industry Sector - always Z CYTEC Industries


Material type (Cytec material types start with Z***) - check the form. 

Select the appropriate views and press "Continue"


 Data Operations should only populate GLOBAL views – Basic data 1, Basic data 2 and Classification.
⚠ In case there is a need to populate LOCAL views, please refer to the PLANT view instructions.


In order to create material GLOBAL DATA view, select Basic data 1, Basic data 2 and Classification: 

If only GLOBAL views are selected, the System does not give a pop up window for indicating organization levels (PLANT/SALES ORG/WAREHOUSE etc.)


GLOBAL DATA: Basic Data 1 View 


FieldDescriptionValue
Internal descriptionUsed for Cytec. Maximum amount of symbols - 40 (has to be maintained for different languages, see below). Must be populated for all materials entered in the systemCheck the form
Base UoM

Mandatory for all materials. Unit of measure in which stocks of the material are kept and managed. SAP converts all quantities in other (alternative) UoM to the base unit of measure.

Cytec uses 5 BUoM - EA, KG, L, M, M2. 

Check the form
Division

Used to group materials and products. System uses divisions to determine the sales and the business areas. Cytec will have 4 divisions: Aerospace, Industrial, In Process Separation (IPS), Additive Technologies (AT). 

Currently not used
X-plant matl statusRestricts the usability of a material for all plants. Ensure that for new materials status is always BLOCKED (status 20 or 30, as requested).20 / 30 / as requested
Material groupUsed to group materials with similar attributesCheck the form
Prod. HierarchyString used for grouping together materials by combining different characteristics.Check the form
Authorization groupThis field dictates rules for handling of material and information in downstream development and operations.Check the form
Gross weight

Only for exporting purposes that include transportation costs, Purchasing and Sales views.  

Not mandatory for Service (ZDEN), Non Stock Material (ZLAG) or Manufacturer Part Numbers Material (ZHRS).

Check the form
Net weight

Weight of one unit of measure and is used for legal purposes in European countries as it shows up on the INTRASTAT.

Not mandatory for Service (ZDEN), Non Stock Material (ZLAG) or Manufacturer Part Numbers Material (ZHRS).

Check the form
Weight unitAlways KGAlways KG
Basic Data Texts = External Description 

The field is populated in English for all materials across all Cytec locations. Mandatory field, up to 60 uppercase characters.

  • For MATERIAL TYPE = PRODUCED finished good items, enter External Description
  • For MATERIAL TYPE = PROCURED items with Trade Names other than the CEM internal description, enter Trade Name as External Description
  • For other material types, enter N/A
Check the form

 

It is enough to add English description only, the rest languages will be added automatically when the material is Saved.


After the description is entered press „Main Data" to return to the Basic Data 1 view

FieldDescriptionValueExample
Descriptions = Internal descriptions

This view is where language specific descriptions can be added.


Material Description field serves as the "internal Cytec" description and must be populated for all materials entered into the system for languages ->


Languages:

EN

DE

FR

IT

PT

ES

Additional Units of Measure

This tab is where Conversion factors for Alternate UoM are maintained.


⚠ For all sold materials AUoM PER is mandatory:  1 PER = 1 BUoM



Check the form

+

If the Sales Indicator in Classification view is marked as SOLD, please add 1 PER = 1 BUoM


To Exit 'Units Of Measure tab' press „Main Data" and go to Classification tab. 


GLOBAL DATA: Basic Data 2

Leave blank.


GLOBAL DATA: Classification

Classification is a cross application component in SAP that allows addition of attributes to master data objects and to hold that information to be used for reporting, searching, applying prices, print this information, etc.














FieldDescriptionValueExample

Choose „Material Class" (001) and press "Enter": 

It is possible to change Class Types by selecting the „Other Class Types" button

It is possible to add Classes by pressing the „Multiple choice button"

Material Class (001)


It is optional to add class that does not have any Characteristics under it. 

SAP Class codes are highlighted in light grey color:


Copy from the form 


  • Engineering: ZCYMC_ENGR_MAT
  • ECCN: ZCYMC_ECCN_HTS
  • Manufacturing: ZCYMC_MANF_MAT
  • Procurement: ZCYMC_PROC_MAT
  • Product management: ZCYMC_PRDM_MAT
    Shipping: ZCYMC_SHIP_MAT
  • Process Materials: ZCYMC_PROCESS_MAT

For example: 

1. Add class ZCYMC_ENGR_MAT and press enter. 

1.1. Add Characteristics as per the form for the given class.

2. Add the next Class. 

2.1. Add Characteristics as per the form for the given class.

etc. 



Characteristic codes are highlighted in light grey color next to the Characteristic descriptions.

Copy from the form 



Manufacturing: ZCYMC_MANF_MAT - field Sub Batch Config End Date. If populated, add the date when material has been created in format 29.09.2021. (day/month/year)

Choose „Batch" (023) and press "Enter"

It is possible to change Class Types by selecting the „Other Class Types" button

It is possible to add Classes by pressing the „Multiple choice button"

Batch class is mandatory for ZROH materials (except packaging) and ZPRO materials (including packaging).

Batch (023)



Save the material by pressing „Save" button


4 CREATING PLANT VIEWS / EXTENDING TO ANOTHER PLANT


The process of creating plant views and extending material to another plant.

Transaction: MM01 and the user has to select the .



Following chapters will cover each plant view separately and provide defaulted values as a reference.

4.1 Sales View

4.1.1. Sales: sales org. 1

Sales unit  Check the form 

Delivering Plant  Check the form 

Please use defaulted tax codes:





BR

Brazil

IBRX

0

FR

France

MWST

1

FR

France

LCFR

A

GB

United Kingdom

MWST

1

IT

Italy

MWST

1

IT

Italy

LCIT

0

MX

Mexico

MWST

0

TW

Taiwan

MWST

0

US

USA

UTXJ

1

DE

Germany

MWST

1


7.1.2. Sales: sales org. 2

Account Assignment Group


  • The Default value for this field is – Z2 (FOR ALL ZPRO Materials)
  • The Default value for this field is – Z1 (FOR ALL ZROH Materials)
  • The Default value for this field is – Z1 (FOR ALL ZHBE Materials)
  • The Default value for this field is – Z1 (FOR ALL ZUNW Materials)
  • The Default value for this field is – Z3 (FOR ALL ZDEN Materials)

Item category groupChoose from the list (see template). Value must be aligned with Gen. item cat. grp.
Material Group 1
  • Default = BLANK, used for shared materials in Heanor, Manchester and Tulsa (see template)
Material Group 4
  • ECCN Code, mandatory when material is:
    • Structural
    • Process + Exported
Material Group 5
  • HTS Code, mandatory when material is:
    • Process +Exported

4.1.3. Sales: General/Plant

Availability Check

  • The Default value for this field for types ZPRO, ZLEH and ZROH is - Z2
  • Else = KP

Batch Management
  • Check the form 
  • This field is repeating also in Purchasing, Plant Data and Warehouse Mgmt 1 views
Transportation Group

Check the form

Profit Center

Check the form 

4.2 Purchasing View

4.2.1. Purchasing

Purchasing GroupCheck the form

Order UnitCheck the form
Variable Purchase Order Unit ActiveDefault value is 1
Automatic PO IndicatorDefault value for this field is √
Purchasing Value Key
  • For ZPRO and ZROH the Default value is Z001
  • Else Default value is Z002

GR processing time

Default value is 1
Quota Arrangement UsageDefault value is 4
Post to Inspection

Default value is BLANK

Check the form

Source ListDefault value is √
Int. Material master (visible for ZHRS only)

For ZHRS populate with Raw Material

Manufacturer Part Number
  • For ZHRS material type populate with catalog number of the manufacturer
  • Else Default = BLANK
Manufacturer Part Profile ( for ZROH only)

Check the form

ZMP1 - Cytec: Restricted MPN Profile

ZMP2 - Cytec: Unrestricted MPN Profile

Manufacturer (for ZHRS only)  

populate with the Manufacturer number

Buyer Groupchoose from the list (see template)

Check the form


4.3 Purchase Order Text view

4.3.1. Purchase Order Text 

Enrich if available for Capitalized Spares (ZUNW), Spares (ZHBE) or Returnable Packaging (ZLEH) Material

4.4 MRP views

4.4.1. MRP1 





7.5 Work Scheduling view (not visible for ZROH)


Production Supervisor – choose from table ONLY if the Procurement Type = E:

Plant

Prod Superv.

Prod Scheduler


Plant

Prod Superv.

Prod Scheduler

2010

103

MTS- TC1


2040

104

MTS- TC2

2010

104

MTS- TC2


2040

YB2

MTS PI valuated

2010

YB2

MTS PI valuated


2045

104

MTS- TC2

2015

101

MTS-ITAR


2045

YB2

MTS PI valuated

2015

103

MTS- TC1


2050

104

MTS- TC2

2015

104

MTS- TC2


2050

YB2

MTS PI valuated

2015

106

MTO-ITAR


2055

YB2

MTS PI valuated

2015

108

MTO-TC1


2065

YB2

MTS PI valuated

2015

109

MTO-TC2


2070

YB2

MTS PI valuated

2015

YB2

MTS PI valuated


2075

YB2

MTS PI valuated

2020

102

MTS-EUML


2085

YB2

MTS PI valuated

2020

103

MTS- TC1


2090

YB2

MTS PI valuated

2020

104

MTS- TC2


2095

102

MTS-EUML

2020

YB2

MTS PI valuated


2095

103

MTS- TC1

2025

104

MTS- TC2


2095

104

MTS- TC2

2025

YB2

MTS PI valuated


2095

105

MTS-TAA

2030

YB2

MTS PI valuated


2095

YB2

MTS PI valuated

2035

104

MTS- TC2


2100

104

MTS- TC2

2035

109

MTO-TC2


2100

YB2

MTS PI valuated

2035

YB2

MTS PI valuated






Production Scheduling Profile – choose from table below, ONLY if the Procurement Type = E or Procurement Type = X:

Plant

Prod Profile

Description


Plant

Prod Profile

Description

2010

YB0002

MTS Process Manufacturing


2045

YB0002

MTS Process Manufacturing

2010

ZSTC1

MTS- TC1


2045

ZSTC2

MTS- TC2

2010

ZSTC2

MTS- TC2


2050

YB0002

MTS Process Manufacturing

2015

YB0002

MTS Process Manufacturing


2050

ZSTC2

MTS- TC2

2015

ZOITAR

MTO-ITAR


2055

YB0002

MTS Process Manufacturing

2015

ZOTC1

MTO-TC1


2065

YB0002

MTS Process Manufacturing

2015

ZOTC2

MTO-TC2


2070

YB0002

MTS Process Manufacturing

2015

ZSITAR

MTS-ITAR


2075

YB0002

MTS Process Manufacturing

2015

ZSTC1

MTS- TC1


2085

YB0002

MTS Process Manufacturing

2015

ZSTC2

MTS- TC2


2090

YB0002

MTS Process Manufacturing

2020

YB0002

MTS Process Manufacturing


2095

YB0002

MTS Process Manufacturing

2020

ZSEUML

MTS-EUML


2095

ZSEUML

MTS-EUML

2020

ZSTC1

MTS- TC1


2095

ZSTAA

MTS-TAA

2020

ZSTC2

MTS- TC2


2095

ZSTC1

MTS- TC1

2025

YB0002

MTS Process Manufacturing


2095

ZSTC2

MTS- TC2

2025

ZSTC2

MTS- TC2


2100

YB0002

MTS Process Manufacturing

2030

YB0002

MTS Process Manufacturing


2100

ZSTC2

MTS- TC2

2035

YB0002

MTS Process Manufacturing


4055

YB0002

MTS Process Manufacturing

2035

ZOTC2

MTO-TC2


2035

ZOTC2

MTO-TC2

2035

ZSTC2

MTS- TC2


2035

ZSTC2

MTS- TC2

2040

YB0002

MTS Process Manufacturing


2100

ZSTC2

MTS- TC2

2040

ZSTC2

MTS- TC2


2045

ZSTC2

MTS- TC2


7.6 Plant Data View




7.7 Warehouse mgmt. views



Please note Storage Strategies section is visible only if Warehouse Number is filled in selection screen of Organizational Levels.

7.8 Quality management view




Inspection Type

Description

Criteria for Selection

01

If the Material will have a Goods Receipt

If the ZPRO Material can be sub-contracted

03

If the Material just got Manufactured and needs to be inspected

If ZPRO Material

04

If the Materials is currently getting Manufactured and needs to be inspected

IF ZPRO Material

09

If it will be in stock over a period of time and may need re-inspection

If ZPRO Material


For Inspection types 01, 04 & 09 average inspection duration needs to be entered by the user. The other settings are Default and will be populated automatically.
Maintain 01 and 09 for Raw materials.

Inspection Type

Description

Criteria for Selection

01

If the Material will have a Goods Receipt

For all ZROH Materials

09

If it will be in stock over a period of time and may need re-inspection

If ZROH Material


For Inspection types 01 & 09 average inspection duration needs to be entered by the user. The other settings are Default and will be populated automatically.
ZHBE/ZLEH – for Structural Materials Quality Management Data view should not be created

7.9 Accounting views


PLEASE NOTE FOR ZROH: Please change Price Determination to 2 for all materials except Re-sale Items. If saved by mistake, please notify the FI team to change via CKMM. Once entered, this will be un-editable via material master.

PLEASE NOTE FOR ZROH: Please change Price Control Indicator to V for all materials except Re-sale Items. If saved by mistake, please notify the FI team to change via CKMM. Once entered, this will be un-editable via material master.


*re-sale ZROH – value RESALE MATERIAL - Purchased Finished Good in Material Planning Subtype field in Classification

7.10 Costing Views



5 DEACTIVATE/ACTIVATE



For global deactivation change the following values of the Material:

For local deactivation change the following values of the Material:


Deactivation in MM06:


P.S. It is possible to deactivate/activate materials for specific Plant/ Stor.location/ Sales org./ Distr. Channel/ Warehouse Nr, that is usually performed by the Plant Data Steward


8 CREATING MATERIAL WITH REFERENCE


Materials can be created using reference material (already existing one). The system will copy all the information from the old to the new one except:



6 LIST OF MULTIPLE STORAGE LOCATIONS - MMSC




4 MASS UPDATE 


9 VALIDATE /REPORT/SEARCH

9.1 MM03 – view material master






In order to Search material by any value in the Classification view, please use "Materials for Class" search option.
First of all the user has to know which Classification class contains the necessary value, e.g., "Old Material number" is in Engineering Class – ZCYMC_ENGR_MAT


9.2 MM04 – Material based changes


 


9.3 ZCYMAT_QUERIES – view based report





List of program names:

ZDM_MAT_QUER10Texts


Exporting the report


9.4 MM60 – field report



9.5 ZCYMAT_CD – display changes



Appendix 1 – List of Plant Data Stewards for both Structural and Process Materials


Appendix 2 – Material Request form


Appendix 3 – Material Types



Appendix 4 – Material number ranges



Appendix 5 – Material type definition


Appendix 6 – Required Documentation for Material Maintenance Requests Based on the Type of Change