This document's objective is to provide a guide to ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZUNB material master data management for GBU Technology Solutions.
Material Master Data management process includes creation and modification of the material, its inactivation and flagging for deletion, and reactivation if needed, as well as mass modification.
Creation of Basic Data, Classification, Sales, Foreign Trade, Purchasing, General Plant Storage, Warehouse Management and Label Data Views will be presented in this procedure. Management of MRP, Work Scheduling, Quality Management, Accounting and Costing Views is being performed by Process Teams. Accounting and Costing views are created by Riga Data Operations when extending materials to Trading Plants. For Sample codes Riga Data Operations is creating all necessary views.
Requests of Composite Materials Material Master creation or maintenance should be submitted via Sharepoint platform which will send out an automatic FreshDesk ticket to Data Team within which the material maintenance should be done.
The referral lists mentioned in this procedure, such as Material Groups, Purchasing Groups and Profit Center List are embedded in Sharepoint platform already.
Under Riga Data Operations scope is the management of ZPRC, ZMAT (raw and manufactured), ZVER, ZERS, ZBOM, ZUNB and PIR Material master data management for GBU Composite Materials (Legacy Cytec organization). Riga Data Operations can create and extend ZDIE materials if requested so by Finance.
Material Type | Description | Division |
|---|---|---|
ZPRC | Commercial Products | N/A |
ZMAT | Finished Goods | Multiple |
ZVER | Packaging | WD |
ZUNB | Stocked and non-valuated materials | WD (for packaging) |
ZDIE | Services | Multiple |
PIR | Purchase Info Record | |
| ZERS | Industrial supplies | |
| ZBOM | Phantom assemblies |
Abbr. | Description | Abbr. | Description |
|---|---|---|---|
RCS | Rhodia Core System | SBS | Solvay Business Services |
ZDIE | Service | UoM | Unit of Measure |
ZMAT | Finished product, semi-finished product, raw material | HSE | Health, Safety and Environment |
ZPRC | Commercial Product | MSDS | Material Safety Data Sheet |
ZUNB | Stocked and not valuated material | MRP | Material Resource Planning |
ZVER | Packaging | DG | Dangerous goods |
| DGL | Data Governance Lead |
ZMAT setup can be performed only once both ZPRC code and MSDS are available.
Prior to submitting a new ZMAT request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the TS SAP Material request form or Composite Materials Sharepoint must be filled and submitted to Data Operations for material master setup in SAP. A second search in the system is performed by the Data Management team to ensure no duplicates are created.
Prior to material creation in the system search is performed by the Data Operations team to ensure no duplicates are created.
Use MM01 transaction to create material
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<style>
#backToTopButton {
position: fixed;
right: 20px;
bottom: 20px;
Z-index: 1;
}
#ReqForTaxNr {
overflow: auto !important;
}
</style> |
|