Tasks to be completed when documenting an operation (from creation to publication)1. Enter the Title of the operation / page2. Add the following Labels :
3. Fill in all fields as described above4. Name the title of each section using OPD methodology naming convention - Infinitive verb without the “to”, mainly action verb...something) - " I do something..."5. Once the description of the operation is completed, ensure it is approved and published by launching the Finance approval workflow |
| Domain: 1. Enter the Domain identified in OPD matrix (for Country specific operations, Domain = Country Accounting) |
Responsibility area: 2. Enter the responsibility area described in OPD matrix ("N/A" for Country Accounting Operations) |
The Origin group aggregates the materials by product family.
The Origin Group is a very critical field for the Integrated Manufacturing & Energy Performance report and it should be updated in order to give a better and more consistent split of the product family in the production costs analysis.
All PF2 and WP2 entities.
2. Definitions
See Finance Glossary:
Material Origin Group will be a mandatory field to update in the Material Master Data.
In order to do that, the Site controller should fulfill the FICO Template (Link here) with the respective origin group whenever Accounting and Costing views are needed.
Please be aware that the FICO views are under SU MAC- Data Management team responsibility. The Creation of a new Origin group is under IS Team scope.
Below are the flow of the activities to be performed by the Site controllers.
3.1. I verify the origin group code to assign to the material
Check the material description, by accessing transaction MM03.

Check the existing origin groups , by accessing transaction MM03.
In case it is a new material without costing views, just access any existing material.

or use transaction Z1K_CHECKMAT (PF2 only):

By searching for "key words", the system will show the already existing Origin groups:

Request New Origin Group through Service One (as shown below) with the Information of the new Origin Group code + Description required.
> Financial Services > IT - Controlling (CO) / IT- Asset/ IFRS16 / IT- Intercompany

Then, DT Team will handle your request. Please provide to IS Team the new 4 digit code and respective description, considering the existing codification. For WP2, it is also need to inform which controlling areas should be considered (Z001, Z006, Z013, Z025, Z026 and Z028).
Request to insert Origin Group must be done through Service One, using the category below, with the information required filled
> Financial Services > Finance Data > Material Management - Accounting and costing views > Request information about Material Accounting and Costing (FICO) Views

Type of Request: Modification
Add the Source System + Material code + Plant + Origin Group (Column AE)
Type of Request: Creation
Then, SUMAC - Data Management Team will handle your request.
In some cases, the material already exists for a long time, but it is not possible to assign a grouping if the material does not have a costing view set up. The Controller needs to determine if it is a critical material and request the creation of FICO views. |