You want to create a new material in Picaso. The first steps are actually done in SAP. Once the SAP setup is complete, you need to take additional steps in Picaso. This document walks you through the Picaso setup.
Add the steps involved:
Have the old material number field of the SAP Material code updated:
Prd_name & Package code (in SAP, transaction MM02, basic view 1) |
|
The overnight will create the material code in ADM. Therefore, 24 h later, update the Search code (default is 999). The number of fields populated from the overnight program is very limited . So once you find your new material master , compare to similar product and update the fields in the new material master . Change the search code field from 999 to 1 (ARO), or 2 ( FP ) or 4 ( PVDC ) or 7 ( FP Intermediates ) Some of the critical fields to update are Material type, UM, Product family ( PRD Field 2 ) and H4 |
|
The overnight also inserts a new record in the SKU Code mapping:
e.g. SAP Material code = 205534 => Picaso SKU Code = 0205534 NOTE: Sometimes the material master is set up but a new package code was set up in SAP later. Most likely you will need to manually add new SAP code to SKU code table |
|
Alternatively: insert a new record in the material table in Picaso. Probably better/easier to copy from a similar product.
|
if the QC time is location dependent, add the locations where the QC time differs from the default one you set in the materials. Do this in the Quality Test Lag table
|
| You may also want to use visual panels to communicate related information, tips or things users need to be aware of. |
Related articles appear here based on the labels you select. Click to edit the macro and add or change labels.
|