Access ADM and WebDP with this link: http://alphdb05.eua.solvay.com/ADMPrd/
Open the Materials table, then hit: Add

You'll have to populate several
The material shows a global Quality test lag:

The Location dependant Quality test lag let you

Impact on Material availability in Picaso and on Planned order end date in SAP.
In order to avoid duplicating QC times when one is maintained in SAP, you want to use the Schedule Upload Lag Adjustment Table.
Keep in mind that the Picaso → SAP interface always uses these two factors. This is hardcoded in the interface.
A formula is a list of ingredients. It is our SAP Bill of Materials.
Most formulas are created in Picaso by uploading SAP BOM's.
(automatic refresh if BOM modified? TBC)
Picaso formulas are named after the SAP Production version they are selected from. Therefore, a BOM not associated to a Production Version will not load in Picaso.
Formulas numbers are generated automatically in Picaso. These numbers will be used in Production Standards Effectivity..







The schedule upload lag adjustment no effect in Picaso (neither on the grid, no anywhere else). Only affect the interface to SAP for planned orders.
Used when the GRPT / QM Module with Average Inspection Duration are used in SAP.
The Planned order end date = Run End Date + QC Lag + Schedule Upload Lag Adjustment