3. ZCBS L2 respects the reporting guide BFC and cycles accordingly
General rule
ZCBS level 2 under scope are allocated to only 1 BFC heading.
The COPA Cycles must ensure the consistency between the cost center and the target BFC heading (corresponding to the NASA hierarchy Level 2/ZCBS level 2 of the CC). Mapping L2-BFC
Illustration
Exceptions
Depreciation
EPRD for Mixed CostCenters: Indirect allocate also variable. Workshop allocate to R25460/R25470
RDD Node: Impact in R36100 & R36200
4. ZCBS level 3 and 4 are flexible for GBUs Adm & Com, R&I
General rule
Cost center Groups ZCBS for levels 3 and 4 canbecreatedto cover the needs of the GBU/ shouldbeadjusted to GBU organization. OnlyUnder the Levels 2: R&D and SGA.
Illustration
Exceptions
No exception
5. Employees working for different BSAs can’t be on the same cost center
General rule
Employees working for different BSAscan’t be on the same cost center
Illustration
...
Exceptions
None, even if it means to have cost center with only one employee
6. Each ZCBS node at level 4 is attached to one single BSA
General rule
Each CC is linked to one single ZCBS node (at level 4)
Each ZCBS node level 4 is attached to one singleBSA (seedefinitions)
Illustration
...
Exceptions
If no BSA is identified for the ZCBS node level 4, it should be assigned to the technical BSA BSA_NA (BSA not assigned)
7. Determination of NASA nodes (Description)
General rule
Determination rules from ZCBS Hierarchy to NASA depend on:
GBU ≠ Function
If Function: Corporate Function ≠ SBS
If GBU: Fixed Cost Plant, Fixed cost Others ≠ SGA/R&I/Interco
Illustration
...
Exceptions
...
8. Budget Owner Determination: L5 of NASA Hierarchy
General rule
Each NASA node at Level 5 is linked to a Budget Owner, who is accountable for the budget.
There is no maintenance in the systems of the correspondence: position/BO name vs L5 Node.
Controlling of each function/GBU should know who is the budget owner of each L5 Node.
Illustration
...
Exceptions
The concepts of budget owner (associated to level 5) and SRM7 position (approver of POs) are different.
We might have a level 5 with 1 Budget owner (always) and many SRM7 approvers (associated to the CCs).