Problem
The mirror is activated for the shipping plant / receiving plant / material combination. However, it does not generate any PReq.
Solution
- Verify the material configuration (activate the Mirror). Make sure that the various MRP fields are updated in the right plants.
- If that does not fix the problem, create a PReq with ME51N. If you cannot, this might explain. And the error message you will receive along the way is your diagnosis.
- If you can create a PReq with ME51, but the Mirror does not create any, run transaction ZDP_1C_PUSH (you may have to ask security to run it).
- in the selection screen (right-hand pannel), enter
- material, shipping plant, receiving plant
- Test mode activated
- with filter (without safety stock)

- page down to find the P_DEBUG flag, and activate it.

- all other fields can remain as is
- hit:
. The program will (should) fail at creating a PReq, since this is why you are reading this documentation. It will tell you why.
You may want to use a panel to highlight important steps.- Use numbered lists to provide step-by-step help.
- Copy and paste or drag and drop images to add them to this page.
|
Related articles
Related articles appear here based on the labels you select. Click to edit the macro and add or change labels.
