Responsible : Physical inventory manager Frequency : Annual with a quarterly up-date Control : IAC.02.03 / control owner: FRA | For an example and a blank template of annual planning ==> 7. Example of documents to be used / a. Annual planning |
|
The annual planning includes : 1. A list of the inventory storage location - On site
- Off site: inventory on consignment, held in third parties facilities or by toll manufacturers
2. Frequency of cycle counts, if applicable - All storage locations divided by count date;
- Inventory planning has to be prepared targeting 100% of Inventory counted at the end of reference period;
3. A planning taking into account the following objectives
A count of items representing 90% of end inventory should be done as of 30th September(in value), each year ( including external Storage) A count of items representing 100% of end inventory should be done as of 30th November(in value), each year ( including external Storage)
Specific for Industrial Suplies - By November 30th, references counted must represent at least 80% of the total value of industrial supplies inventory.
- The rest 20% of references of the total value must be counted by either sampling counting method every year or cycle counting method every 3 years
That planning must be communicated to FRA, who could organize/support the supervision by a third party without prior notification to PIM. 4. Cycle Counts rules - Cycle counts have to start before July 1st of each year, otherwise Full Inventory count will have to be executed at the plant;
- ABC Classification method has to be implemented for a complete cycle count model implementation for spare parts;
Planning is proposed by PIM and validated by FRA before end of September with consideration for 2 periods : - October 1st to November 30 November of current year : revision of on going calendar :
- Starting with actual inventory coverage rate as of October 1st (in theory 90%)
- Showing completion of 100% target as of November 30TH
- Dec 1st of current year to November 30th of following year :
- That planning is detailed by material code and SAP plant where applicable
- Where SAP isn’t available, that planning is also used to follow progress of coverage inventory count
- FRA is responsible for recording that planning in the dedicated group repository and external auditor have access to that repository
|
|