SAP MII (Manufacturing Integration and Intelligence) will stop being supported by SAP after 2027 (or 2030). There are currently two MII instances used by Syensqo
We need to identify a strategy to address this situation. This KDD document presents the possible options and identifies the best proposal, analyzing the implications and impacts under different points of view: business functionalities, IT perspective, change management, scalability and future proof solution.
Three options are available:
Option C is the recommended solution: remove MII and directly connect MES systems to SAP S4 via the current StarTek platform.
MII acts as a middle-ware to connect the MES systems with the following data flows (not all of them are relevant for all plants/MES systems):
These process are in place for both WP1 (WPX in case of ITAR relevant sites) and PF1.
There are no cases of direct user interactions with MII: it is used only as a middle-ware between ECC systems and MES systems.
Data Analytics and Reporting Features (KPI, OEE, Data Intelligence, etc) are not used. This is valid for both MII instances.
This is a pure techincal KDD, no business impact.
In this option we disregard the expiry date of MII maintennce and we keep it running for the current plants and MES system using it as a connector.
The Risk related to this option is the need to build up an internal or 3rd party maintenance team to take care of the system after the SAP maintenance won't be guaranteed anymore. It is also a non-Future Proof and not-scalable solution.
The advantage is that it implies zero effort both on MES and S4/HANA sides and it keeps all current connectors in place as they are.
Pro’s | Con’s |
Effort: minimal to zero effort required both on SAP S4 and MES side. | Maintenability: after the expiry date of MII for SAP Maintenance, an internal or 3rd party team must be engaged to keep the product running and maintained. |
Future Proof: this solution is not future-proof, as any new functionality, extension, improvement will require bespoke implementation. | |
Scalability: the solution will be hardly scalable, as connecting new MES systems and new plants to the current MII instances will require MII skills will become scarce and expensive after the system end of maintenance and dismissal by most of the companies using it. | |
|
Digital Manufacturing does not have all functionalities and connectors we had in the MII system. Despite it is the designated substitute of MII, it requires BTP components to fully substitute MII capabilities as MES-SAP middle-ware.
There is also a potential risk related to current bespoke implementations in MII to be replicated in DM+BTP, for this reason the Project Effort is considered to be medium for this option.
This is the option with the best compliance with the SAP standard and Road Map, however it would add further objects to maintain on top of the current Star Tek Layer.
It would make sense only if the MES systems was substituted by SAP DM. But, as defined in https://wiki.syensqo.com/x/-YGMNQ, all the current MES systems will remain.
In this option, we remove MII and we the Star Tek layer as a middle-ware, to send process/production orders from SAP S4/HANA to MES systems and to collect actual confirmations and production goods movements from MES systems to S4/HANA.
It is the option with the minimal impact, as it leverage the current Star Tek solution implementation effort. It is based on bespoke interfaces, however the scalability and future-proof of the solution are guaranteed by the Star Tek design, that defined a single communication protocol for all different MES systems used in Syensqo.
This option may require a review of the current Star Tek roll out program, to assure that all plants currently served by MII will work on Star Tek platform before the MII end of maintenance period.
The following Matrix illustrates the evaluation of each option under the considered criteria:
Criteria | Weight | Option A Keep MII | Option B substitute MII with Digital Manufacturing + BTP | Option C Remove MII and use Star Tek layer |
| Future Proof | VH | Very Low | High | High |
| Scalability | ||||
| Best Practice | H | Very Low | Very High | Low |
| Functionalities | H | High | High | High |
| Simplicity | H | Very High | High | Medium |
| Maintainability | VH | Very Low | Very High | Low |
| Reduce Project Effort | H | Very High | Medium | Very Low |
Total | Medium | High | Medium |