Status

Owner
Stakeholders


Issue

SAP MII (Manufacturing Integration and Intelligence) will stop being supported by SAP after 2027 (or 2030). There are currently two MII instances used by Syensqo:

  • Composite ITAR MII (US), is already 100% managed by Syensqo
  • Global MII (based in EU) is currently shared with Solvay, will be cloned

We need to identify a strategy to address this situation. This KDD document presents the possible options and identifies the best proposal, analyzing the implications and impacts under different points of view: Future Proof Solution, Scalability, Best Practice adherence, 

Three options are available: 

  • A) continue running on MII after end of official support, managing internally or via a 3rd party provider the product maintenance and adaptations
  • B) substitute MII with SAP BTP connectors, and connect all MES Systems to S4 via BTP connectors
  • C) remove MII and directly connect MES systems to SAP S4 via the current StarTek platform. 


Recommendation

Option B is the recommended solution: substitute MII with SAP BTP connectors, and connect all MES Systems to S4 via BTP connectors


Background & Context

MII acts as a middle-ware to connect the MES systems with the following data flows (not all of them are relevant for all plants/MES systems):

  • process orders from SAP ECC to MES
  • production confirmations from MES to SAP ECC
  • production goods movements from MES to SAP (consumption and goods receipt)

These process are in place for both WP1 (WPX in case of ITAR relevant sites) and PF1.

There are no cases of direct user interactions with MII: it is used only as a middle-ware between ECC systems and MES systems.

Data Analytics and Reporting Features (KPI, OEE, Data Intelligence, etc) are not used. This is valid for both MII instances.

Assumptions

  • MES systems in the affected plants won't change and MES functionalities and implementations in the affected plants will remain stable during the ERP Rebuild project
  • Other functionalities potentially covered by SAP Digital Manufacturing are not part of this KDD; they are addressed here: https://wiki.syensqo.com/x/-YGMNQ


Constraints

  • The MII substitution will synchronize with ERP Rebuild go-lives. The new solution will be available for plants running on the new S4 Platform. These Go-Lives may happen in different waves, therefore MII can continue running between waves on a subset of the current plants.


Impacts

  • Conveying the current MII flows via the SAP BTP connectors must be synchronized with the ERP Rebuild go-lives timeline, to optimize the effort and avoid temporary solutions that would be wasted in the long run.
  • The affected plants and MES systems must be prepared to adhere to the unified communication protocol defined by the SAP BTP connectors.


Business Rules

This is a pure techincal KDD, no business impact.


Options considered

Option A: Keep MII   

In this option we ignore the expiry date of MII maintenance and we keep it running for the current plants and MES systems after it.

The Risk related to this option is the need to build up an internal or 3rd party maintenance team to take care of the system after the SAP maintenance expiry. It is also a non-Future Proof and low-scalable solution. 

This Option implies very little effort both on S4/HANA side and zero effort on current MES systems, as it keeps all current connectors in place as they are.

Pro’s

Con’s


Future Proof: this solution is not future-proof, as any new functionality, extension, improvement will require bespoke implementation.

 

Scalability: the solution will be hardly scalable, as connecting new MES systems and new plants to the current MII instances will require MII skills will become scarce and expensive after the system end of maintenance and dismissal by most of the companies using it.


 Best Practice: The solution is not on SAP Road Map and does not fit in Best Practices

Functionalities: current functions are guaranteed


Simplicity: minimal changes required, only to make sure current MII connectors with ECC will work with SAP S4/HANA

 


Maintainability: after the expiry date of MII for SAP Maintenance, an internal or 3rd party team must be engaged to keep the product running and maintained.

Effort:  minimal project effort, we just need to guarantee that the custom connectors currently used in the MII-ECC landscape will be adapted to S4.

 

Option B: substitute MII with SAP BTP

Digital Manufacturing does not have all functionalities and connectors we had in the MII system. Despite it is the designated substitute of MII, it requires BTP components to fully substitute MII capabilities as MES-SAP middle-ware. Considering this, we think it is a much easier and manageable solution to use directly and only SAP BTP connectors for the interfaces between MES systems and S4.

There is also a potential risk related to current bespoke implementations in MII to be replicated in the BTP, for this reason the Project Effort is considered to be medium for this option.

This is the option with the best compliance with the SAP standard and Road Map. 

It would make sense only if the MES systems was substituted by SAP DM. But, as defined in https://wiki.syensqo.com/x/-YGMNQ, all the current MES systems will remain. 

Pro’s

Con’s

Future Proof: this solution is future-proof, as once defined, the BTP connectors maintenance, upgrade and extensions are guaranteed in the long term.


Scalability: the solution is scalable, as connecting new MES systems and new plants to the new SAP BTP layer will be feasible using standard SAP connectors and APIs


Best Practice: The solution fits in SAP Best Practices


Functionalities: we can guarantee  all current MII functions, via SAP BTP connectors.



 Simplicity: this is a full new implementation and requires a detailed analysis of current connectors, how to replicate them to avoid any impact on the local MES systems.

Maintainability: the std functionalities SAP BTP will require minimal maintenance effort.



 Effort:  maximum project effort for a full new implementation.

Option C: Remove MII and directly interface MES systems to the current Star Tek Layer

In this option, we remove MII and we use the Star Tek layer as a middle-ware, to send process/production orders from SAP S4/HANA to MES systems and to collect actual confirmations and production goods movements from MES systems to S4/HANA.

It is the option with the minimal impact, as it leverage the current Star Tek solution implementation effort. It is based on bespoke interfaces, however the scalability and future-proof of the solution are guaranteed by the Star Tek design, that defined a single standard communication protocol for all different MES systems used in Syensqo. 

This option requires that the timeline of the current Star Tek roll out program assures that all plants currently served by MII will move to the Star Tek platform before the MII end of maintenance period. 

Pro’s

Con’s

Future Proof: this solution is considered decent from a future-proof, as any new functionality, extension, improvement will be guaranteed by the standardization introduced by the Star Tek Layer. However, is slightly less valuable than option B.



 Scalability: as the Star Tek layer is not a proper Middle-ware software, even though the functional scalability looks good, we technically consider the scalability of this solution very poor.


Best Practice: The solution is not on SAP Road Map and does not fit SAP Best Practices

Functionalities: Star Tek is already in place and connecting several MES systems in different plants, all its functionalities are guaranteed by this approach.


Simplicity: no changes required, simply the current Star Tek Roll Out program goes on while the ERP Rebuild project must guarantee the compatibility of the current ECC-Star Tek connections with the new S4/HANA - Star Tek landscape.



Maintainability: Dedicated maintenance for the bespoke interfaces between the different MES systems, the Star Tek layer and SAP would be required

 Effort:  small project effort as Star Tek roll outs are already foreseen and adaptation of current Star Tek - ECC interfaces to S4 HANA would be relatively simple


Evaluation

The following Matrix illustrates the evaluation of each option under the considered criteria:


Criteria

Weight 

Option A

Keep MII

Option B

substitute MII with SAP BTP 

connectors

Option C

Remove MII and use Star Tek layer as a middle-ware

Future ProofVHVery LowVery HighMedium
ScalabilityH Low Very High Very Low
Best PracticeMVery LowVery HighVery Low
Functionalities VHVery HighVery HighHigh
SimplicityHVery HighLowVery High
MaintainabilityVHVery LowVery HighLow
Reduce Project EffortVHVery HighLowHigh

Total 


Medium

High

High