This KDD document identifies the main material inspection processes that will be in scope of the QM stream of ERP Rebuld project.
These are the processes currently running in Syensqo WP1 and PF1 systems, as identified in the AS-IS analysis:
All these inspection types are used in combination with inspection plans.
We identify the opportunities to introduce:
Option A is the recommended one: introduce in scope of the project inspection types 14 and 15 and allow the usage of Material Specification.
The two systems PF1 and WP1 have a very similar QM model, based on custom inspection types which are copies of the original standard types.
Material inspection is largely used in SAP ECC, in some cases in combination with Labware and WEBLIMS, in other cases with a full E2E process in SAP.
The QM Material Inspection is a crucial part of the traceability and Quality Assurance process in Syensqo and involves all steps of the process: Inbound, Production, Outbound, Stock Management.
A decision tree will be designed in Detail Design to identify the inspection types to be activated for each material.
A decision tree will be designed in Detail Design to define whether a material specifiation or an insection plan should be created to host the tests required for a new material.
Option A: Add Inspection Types 14 and 15 to the scope and allow material specification
Describe the option in sufficient detail for a reader familiar with the subject matter to understand it properly
Describe the option in sufficient detail for a reader familiar with the subject matter to understand it properly
Outline why you selected a position. The best format could be a pro/con table (sample below), but is up to you as the author. You must consider complexity, feasibility, cost/effort to implement, but also ongoing operational impact and cost. You must consider the program principles and explain any deviations in detail. This is probably as important as the decision itself.
Option A | Option B | |
|---|---|---|
| Criterion 1 |
|
|
| Criterion 2 |
| |
| Criterion 3 |
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.