Syensqo has different types of plants including virtual plants created to support different activities ex: Intercompany, Subcontracting etc.. Due to a large number of virtual plants, the supply chain transactions become very cumbersome, and the automation opportunities are limited. As a part of the ERP Rebuild program there is an opportunity to standardise and simplify the plant structure.
Based on the analysis, Option B: Simplify and standardise the Plant Structure is proposed. This option will simplify the and standardise the number of plants and the supply chain network of Syensqo. All the plants will have to evaluated based on the plant decision tree during the detailed design
Plant represents a physical location where materials are produced, procured, stored, maintained or distributed. Following is some of the key functionalities at plant level
The current plant structure has a lot of duplicate plants and virtual plants which increases the complexity of supply chain transactions as the stock movements have to be carried out on the virtual plants even though physically the stock is not moving, increasing operational overhead as these virtual plants needs to be kept in sync wrt inventory, purchasing transactions and intercompany / intracompany transactions.
Any change in the current understanding of tax treatments / regulatory requirements will change the plant design
Following are the impacts
Data Conversion and migration: Data from the As-Is systems need to be mapped based on the proposed Plant Structure
Cutover: Inventory migration approach should consider the plant design
Downstream System: There will be an impact on all the downstream systems that use Plant codes and there should be a one-time remediation or mapping exercise that should be undertaken
A location will be defined as a plant if atleast one the following conditions are met:
Following are the options proposed
Option A: Continue with the As-Is Plant Structure
No changes in the existing plant structure and we copy all the valid plants from the As-Is system
As a part of this option, the plants are proposed to be simplified based on a decision tree. Each and every plant needs to be evaluated against the decision tree during detailed design to identify which of the As-Is plants are valid and needs to be created as plants in the To-Be structure
Option A: Continue with the As-Is Plant Structure | Option B: Simplify and standardise the Plant Structure | |
|---|---|---|
| Operational Complexity |
Stock take is cumbersome Stock Valuation is complicated |
|
System Complexity |
Multiple virtual plants introduce complexity / performance issues in reporting | |
| Automation Complexity | ||
| Data migration Complexity |
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.