| Step | What to check ? | Where to check ? | How to check ? | |
|---|---|---|---|---|
| #1 | Check status of all the monthly jobs | Dscp DiPx batch execution report |
| |
| Workspace SBS - Technical view |
| |||
| #2 | Run jobs if necessary | Administrator / Macros / Shared macros (normally must be executed by interface team) | In case of an error, must be executed by interface team (no action on our side)
| |
| #3 | Execute Monthly Task sequence | Configuration / Task sequences/ Shared sequences | In case there was an error during the automatic execute monthly task sequence only: In DIP1
In DIP4 /!\ SILICA : For Silica, the update U00 → U02 is done every Sunday. When the first day of the month is on a Saturday or a Sunday, BW files are created and updated in DIP only the following Monday (because of issues in the file generation). So in this case, the update U00 → U02 needs to be manually launched, and then a full loop has to be run. Last Dynamic Impact has to be Sunday's date => in case of issue, run task sequence U00>U02 : 001 Execute : SILICA : Import dynamic datas U00 >>U02 Last Full loop has to be Sunday's date => in case of issue, run Full DiP-PP Loop : 011 Execute : SILICA : Full DiP-PP - WW DSCP DiP4 Prod → Home → Workspace: SBS-CONTROL VIEW → Sheet: U02 - SI | |
| #4 | Verify the Horizon rotation | GBUs workspace | *Checked by interface team DSCP1 - workspace P3M || EU SAD SODA => current month has to be in blank color
| |
| #5 | Check Imported datas | Structure / User models / U00 - IN Import / Data tables |
Check data consistency of the most important data : I500 - Imported stock datas (day) > I500 Initial Inventory (MD04 +MB5B for movements) =>For SILICA => Homologated inventory
I402 End of month unrestricted Inventory (MB5B with last day of the previous month in date) I402 - Actual Shipped at GI - site dim (MB51 from beginning to end of last month movement 601) For examples on 0278, 7525 I400 - Intransit inventory in receipt date (MB5T) : Attention, not to check the shipto for this datafield; only for intersites. I400 Firm Shipment in shipping (MD04 customer order + Deliveries) : check the "MRP element"
I002 Final Forecast in ETD (DP side: User models/U99/Data tables/Export| BW/DIP-PP - Material:Shipto@DC/ Final Forecast ETD). I500 Blocked stock (MMBE : Blocked Stock + Blocked Stock Returns) You need to compare with SAP or DP data to be sure that everything is ok. | |
| #6 | Check general S&OP data | S&OP workspace |
Arithmetical inventory (should not be 0 if there are inputs) Shipping plan vs Shipping requirements, (if any requirement is there, there should be also shipping plan) Global Balance reports | |
| #7 | Specific Silica - Transit inventory | U00 - Actuals Month | Check the Transit inventory SILICA => We must have data for the previous month Compare results between the 2 parameters as well as the total quantity on M-1 of the parameter I402 - End of month transit inventory SILICA, must be equal to the Sum of all quantities in transit of the paramter I400 Intransit inventory in receipt date
If there is some gap: -Check in SAP (mb5t) if it match with Intransit inventory in receipt date -For Silica, we take In transit inventory in receipt date that we archive on the last day of the month to plug it into the actuals. We do not take the U00 Actuals to display it in the Silica screens. | |
| #8 | Check SAP Independent requirements | MD63 in SAP | Check between SAP and Dynasys the Forecast exported => Take 3 SKUs PW as examples by BU > Novecare : in DIP, Final Demand after netting (last validated) in CS model !!! Please take examples from Sites where forecast export is activated!!! !!! Please take examples when forecast is different from 1 month to another !!!
You can use this specific Grid view to help the monitoring.
In MD63, please fill the Plant/Material and the month to check. > Special Chem: (in progress) : to be completed > TS:
Compare DIP Final demand ETD after netting and SAP MD63
| |
| #9 | Check the BOM level | Monitoring workspace | BOM level Alert Novecare/ TS (in the monitoring workspace) | |
| #10 | Check constrained demand sent to SAP (Perox & SA&D) | in SAP, SE16 transaction, table Z1V_FORECAST_DS | Compare U99 Perox : with SAP :
We export to SAP the current month + 3 months |
For DIP3:
| #1 | Check status of all the monthly jobs | SBS - Technical views |
If not → wait until it end |
|---|---|---|---|
#2 | |||
| #3 | NOVECARE - Consistency of data | OBSOLETE Simulate Felix account (FLESSARD) and be open A2. SOP Planning simulate MGBA6210 | Find a SKUs as example and check the following data:
Check the projected inventory calculated by the DRP is correct Check that the final demand after netting seems ok. Check that export to BW batch has run without error (SBS technical view) |
| #4 | Check SAP Independent requirements | MD63 in SAP | Check between SAP and Dynasys the Forecast exported => Take 3 SKUs PW as examples by BU > Novecare : in DIP, Final Demand after netting (last validated) in CS model !!! Please take examples from Sites where forecast export is activated!!! !!! Please take examples when forecast is different from 1 month to another !!!
You can use this specific Grid view to help the monitoring.
In MD63, please fill the Plant/Material and the month to check. |
| #5 | Communication | Send an email to the DIP3 users | to: "$DynaSysUsersDiP3 (Novecare)" <DynasysUsersDiP3@solvay.com> Dear All, The monthly update is done. You can now connect into DIP. SAP data will not be updated until the end of the netting process on the 6th of the current month. → Verify the date each month ! Next SAP data update takes place after S&OP validation on the 11th of the current month. → Verify the date each month ! The remaining SAP data updates will take place every Saturday until the end of the current month. Regards.
|
| Checks to do after the validation of S&OP | |||
| Check the archive of S&OP Validation archive +1 day after the S&OP Validation |
Z800 should be equal to S&OP Validation of Month M for M+1
|