|
When the unit integrated costing calculated by the system is wrong. For instance when the standard costing is wrong in WP1 and it is too late to rerun it, it is possible to use the table C - Manual Update of IM Cost Unit to replace the integrated costing calculated by the system by a new one.
Prepare the data to be uploaded in WBP using the dedicated template:
C. Manual Update of IM Cost UNIT.xlsx

| Costing Date | Costing variant | Plant | Material | Lot Size | Unit | Amount CP | Amount CP RAW | Amount CP PACK | Amount CP TOLLING | Amount CP UTILITIES | Amount CNP | Amount AMO | Amount Freight | Amount Duty | Currency key | Incident request | Descript° | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MANDATORY YES/NO | YES | YES | YES | YES | YES | YES | NO | NO | NO | NO | NO | NO | NO | NO | NO | YES | NO | NO |
| AUTHORIZATION CHECK | N/A | N/A | YES | YES | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Once everthing is ready, open WBP and enter the transaction ZBW_INT_MARGIN - Integrated margin process in the search bar and enter ![]()
Click on the button C - Manual Update of IM Cost Unit



When the excel file was chosen, the button preview and check file are available.
“Preview” show the file uploaded:



When the loading is finished a message appears

Note You need to request BW team to perform a reload of COPA documents required |