List of application role + menu role and explanation if we have several applications role with specials rules.
|
List of authorization objects mandatory for the application.
See also file maintained by Authorization team : BW Catalog of Roles / link: |
Actually it is not an application. They are three queries and they provide the following info
Tool Leader + IT leader of the application: Reporting coordinator: Charlotte Rollier / Ludovic Depoix.
Queries are in role menu: COPA - Netback, iCare, Exchange rate

These three queries have been create in WBP in the context of PQ1 Decommissioning project.
No special info needs... it has been created under the DSO DAFICE01and it is fed daily, from the table TCURR of WBP.

Transformation DTS_TCURR WBP_400 -> ODSO DAFICE01 is used to load the exchanges rates and the second transformation ODSO DAFICE01 -> ODSO DAFICE01 to delete the exchange rates loaded before the current day.
Process chain: PC_FICE_00 - Daily - 1am.
It has been created under SpS project (P&L multiprovider => MVCOPA01)
In oreder to have more details of the multicube flow, rules and so on, please refer to the P&L documetation => Technical Documentation - RTR - Profit and Loss (P&L) + Integrated Margin (IM) (WBP)
Process chain where info provider CRCOPA22 is loaded: PC_COPA_PL_32 - Daily - 1:10 am.
It has been created under SpS project (P&L multiprovider => MVCOPA01)
In oreder to have more details of the multicube flow, rules and so on, please refer to the P&L documetation => Technical Documentation - RTR - Profit and Loss (P&L) + Integrated Margin (IM) (WBP)
iCare Query uses severals providers in MVCOPA01:
CICC & Adjustment companies - P&L - Data → CRCOPA08
IM - RCS - CDSA w/ Program → CRCOPA32
IM - Solvay PF1 - GM Data → CRCOPA23
IM - Solvay PF1 - GM Data - allocation of transport costs → CRCOPA26
IM - Solvay PF1 - GM Data Annulation → CRCOPA30
NON-ERP - Below Gross Margin (BFC) → CRCOPA07
NON-ERP - Data → CRCOPA09
PAX: Profitability Analysis: COPA - IECRA Determination WP1 → CRCOPA29
PQ1 P&L - GM Data → CRCOPA10 (not longer loaded)
PQ1 P&L - PCA Data → CRCOPA11 (not longer loaded)
Profit. Analysis: COPA - CDSA Program → CRCOPA31
Profitability Analysis: COPA - CDSA Determination → CRCOPA02
Profitability Analysis: COPA - IECRA Determination → CRCOPA01
Profitability Analysis: COPA - Solvay legacy → CRCOPA22
UPIS - Data → CRCOPA21
These providers are loaded in several process chains, (you can find the list of all providers loaded in P&L in this documentation):
| Process chain | Provider loaded | Frequency | Time Start | Duration |
| PC_COPA_PL_03 | CRCOPA29 CRCOPA31 CRCOPA02 CRCOPA01 | Daily | Arround 1:20am | Arround 5 mins |
| PC_COPA_PL_12 | CRCOPA07 CRCOPA08 | Daily | Arround 2am | Arround 8 mins |
| PC_COPA_PL_20 | CRCOPA21 | Daily | Every hour | Arround 2 mins |
| PC_COPA_PL_21 | CRCOPA32 | Daily | Arround 2:15am | Arround 6 mins |
| PC_COPA_PL_32 | CRCOPA22 | Daily | Arround 1:10am | Arround 3 mins |
| PC_COPA_PL_33 | CRCOPA23 | Third and Fourth working day | Several execution between 2am and 4pm | Arround 5 mins |
| PC_COPA_PL_42 | CRCOPA26 | Third and Fourth working day | Several execution between 2am and 4pm | Arround 5 mins |
| PC_COPA_PL_45 | CRCOPA30 | Third and Fourth working day | Several execution between 2am and 4pm | Arround 8 mins |
| PC_GBR_14 | CRCOPA09 | Daily | Arround 3:40am | Arround 20 mins |
Data come from SAP system. To compare data between BW and sources systems, check propagation layers.
<Describe the recurring procedures needed to operate the application (eg. start/pause/terminate/restart the app processes, data preparation, data ingestion, ETL, data visualization, data export, other manual activities)>
<Describe the scheduling in place for the application (eg. existing jobs, trigger time/event based, dependencies)>
<Describe the monitoring checks to confirm the application is performing well (eg. check the overall status, check performance metrics like runtime/data volume/memory/disk/CPU, maintain and react to alerts/notifications)>
<Describe how to handle errors (eg. error codes, description and respective resolution, alert users)>
<List the existing bugs, its criticity, workarounds and resolution plan.>
<List past & future evolutions for the application (including links to MED/FSD/TSD)>