The IMEP (Integrated Manufacturing & Energy Performance) application is under the finance domain using data from SAP CO (Controlling) to provides to business the possibility to analyze the production's target cost, actual cost, the variance for each cost item in process order, the cost collector, and to determine energy consumption and CO2 emission during production process. |
For this Application the access is provided based on the BW menu "IMEP - Integrated Manufacturing & Energy Performance" and it's done via Service one. Fill the form In SAP system select the "WBP - BW Business Warehouse" In WBP - BW Business Warehouse : Select the Business Role select the "IMEP - Integrated Manufacturing & Energy Performance" |
Target Users: GBU Controllers, Site Controllers, Plant Management and Industrial & Strategy RD&T. |
VERSION | DATE | MODIFIED BY | DESCRIPTION |
0.01 | 09.10.2023 | Inês Vilares | Initial draft |
|
To understand better the main goal for the IMEP application it's necessary to know some concepts from the SAP CO module for the product costs.
Product Costing
The flow of the product costing is composed of a series of standard transactions which are interconnected. This requires the processing in a certain sequence. The procedure starts in the cost center accounting referring to so-called production cost centers. Defined activity types are assigned to these cost centers. For the daily movements the activity prices are valuated at standard cost. In the closing of the product costing they will be revaluated at actual prices. The differences are credited on the production cost centers and debited on the production cost collectors, managed in the cost object hierarchy.
The procedure continues with the distribution of postings of actual costs on the cost object level to the assigned cost collectors.
All categories of variances between target costs and actual costs, like price and quantity variances in raw and packaging materials, same for consumed activities are calculated within the cost object hierarchy and posted on cost collectors. As the cost collectors are a certain kind of order, they must be settled at the end of the period.
Intermediate checks take place in order to look at the ‘zero’ balance of the cost accounting objects involved.
Material Ledger
To execute the Material LEdger it's necessary that the Prodcut Costing was successfully completed.
After that it is necessary to run Material Ledger, in order to correct the standard price, calculating an actual price for each material, based on all the actual costs for that specific period. This actual price is called “periodic price unit” and can be used to revaluate the material stock for the mentioned period.
Actual Costing - determines what portion of the variance is to be debited to the next highest level using material consumption. With the actual BOM, variances can be rolled-up over multiple production levels all the way to the finished products.
Material Ledger is activated at company level but its use can be limited by plant or by article. So, if one plant is customized with ML, all the articles in this plant will have material ledger postings but with a different importance depending if the article is included in the end of the month procedure or not.
After the run of Material Ledger, all the inventory stocks are revaluated at actual prices and actual production cost of the period.
To see more detil information about the process please check in the wiki page for "Costing - Knowledge Base".
Below you can see that for each system we have main differences coming from Costing Methodology:

The valuation in solvay it's done once a month.
For WP1 each month we revaluate the standard price of the products and independent of the actual costs of the month, the valuation in stock for the products will be done with the standard price so it will exist a variance and this difference will be posted in a dedicated line in P&L.
For PF1 we use the Material Ledger to calculate the actual costs, that means each entry in stock of a produced material it will be done at the actual costs. In the end of the month they will reassign the difference between the standard cost and the actual cost and to have the stock with the actual cost. In this case the difference is allocated to the product and not in P&L as in WP1.
SAP Transaction Material master data: MM03 in Accounting1 and Costing 2 page.
For this application find below all the workbooks available (the most used workboks are identified by the symbol ):
| Reports | Definition | Prompts | BW Workbook Query | Query Technical Name |
|---|---|---|---|---|
| It gives a transversal and consolidated view of manufacturing costs (from sites to GBU level) for all plants managed in WP1. | Mandatory:
Optional:
| BW_WBK_CO_0019 | BW_QRY_MVCOPP01_0009 | |
| It gives a transversal and consolidated view of manufacturing costs (from sites to GBU level) for all plants managed in PF1. | Mandatory:
Optional:
| BW_WBK_CO_0021 | BW_QRY_MVCOPP01_0011 | |
| BW - IMEP - PF1 Check of data consistency (Core Workbook) | The workbook is used to validate the quality of the data reported in imep for the sites in PF1. | Mandatory:
Optional:
| BW_WBK_CO_0024 | BW_QRY_MVCOPP01_0013 |
| BW - IMEP - PF1 ML synthesis (Core Workbook) | This report answers a specific need of GBUs operating in PF1 who wants to better understand the impact of the stock effects in their P&L. It can be used as the report Z1K_CONS_ESTO in PF1 but for a wider scope. | Mandatory:
Optional:
| BW_WBK_CO_0026 | BW_QRY_MVCOPP01_0018 |
| BW - IMEP - PF1 Prod. Cost Center Actual Postings (Core Workbook) | It is cost center report that can be used to detail the Index 1 = 9. It is mainly used to provide the detailed utilities costs that are posted in dedicated cost centers with dedicated Statistical Key figure. | Mandatory:
Optional:
| BW_WBK_CO_0025 | BW_QRY_MVCOPP01_0016 |
| BW - IMEP - PF1 Prod. Costs by Cost Objects (Core Workbook) | This workbook is the same as the workbook BW_WBK_CO_0021 IMEP - PF1 Manuf. Local database (Core Workbook) with a different lay-out. | Mandatory:
Optional:
| BW_WBK_CO_0029 | BW_QRY_MVCOPP01_0011 |
| BW - IMEP - PF1 Uploaded budget data check (Core Workbook) | This report used to control the budget that was uploaded using the transaction ZIMEP_FILE. | Mandatory:
Optional:
| BW_WBK_CO_0023 | BW_QRY_MVCOPP01_0012 |
For these reports, it’s important to understand some general concepts which are transversal to all the reports which allows the users to work with the reports.
| Standard Cost | Refers to a predetermined, fixed cost that a company assigns to its products, materials, or services for the purpose of internal cost accounting and cost control. It serves as a benchmark or baseline cost against which actual costs are compared. The key elements of a standard cost include labor, material, and overhead costs. |
|---|---|
| Costing Lote size | For a material we have in the master data the definition for the costing lote size and we can have 1 unit or 100 units and for the value of the stock this will be used with the price defined. |
| Cost Object | in PF1 it's a grouping of material which doesn't exist in WP1. |
| Index | Is a key element to understand to set-up an accurate report to follow production quantities and costs. More detail information in the Process Detail section. |
| Domain | Finance |
|---|---|
| Application | BW reports under IMEP - Integrated Manufacturing & energy Performance folder |
| Provider | MVCOPP01 |
iMEP is a transversal and consolidated view of manufacturing costs from sites to GBU level. We have data from PF1, WP1 and some information from SodaAsh for the budget data (this is a specific case). In this section we will approach: |
List of Characteristics & Measures available in the BW application iMEP with the link to more detailed documentation when it exists. |
You can find below the list of all characteristics and some measures available in iMEP workbooks. Type in your keywords in the field "Text search" |
<iframe referrerpolicy="no-referrer-when-downgrade" height="600px" width="100%" style="border:none;" src="https://view-awesome-table.com/-Mtw0jjm5J1s6y917Sz8/view"></iframe> |
In the application iMEP, the caracteristic Index 1 is a key element to understand to set-up an accurate report to follow production quantities and costs. |
For historical reasons, the data structure is not the same in our two source systems (WP1 & PF1). It explains why some indexes only exist in one of the two ERPs.
| Code | Description | Definition | WP1 | PF1 |
|---|---|---|---|---|
| 1 | Produced material | Costs and quantities at finished product level | ||
| 2 | Co-product | Co-product | ||
| 3 | BOM component | Costs and quantities issued from component consumption | ||
| 4 | Subcontracting | Subcontracting costs | ||
| 5 | Activity type | Costs and quantities issued from activity consumption at standard costs | ||
| 6 | Settlement | Process Orders variances | ||
| 7 | Cost Collector Varia | Allocation of activity variances done by Material Ledger | ||
| 9 | SKF/direct Posting | Detailed origin of costs consumed on production cost centers by Activities |
Example PF1
The aim is to have the detailed quantities and costs of production of the material 157142 in iMEP
There are 4 columns in the report:

The detail of costs & quantities is:
| Index 1 | ||
|---|---|---|
| a | 1 - Produced material | 70 000 KG of the finished product 157142 SD are produced and the total production cost is 6 840 € |
| b | 3 - BOM conponent | 206 000 KG of Raw Materials are used for the production of the finished product with a total cost of 2 650 € |
| c | 5 - Activity type | The cost of activities used for the production is 4 440 €. It is based on the estimated costs of activities |
| d | 7 - Cost Collector Varia | It is the difference between the standard cost of activities and actual costs (=4 190 € - 4 440 €) |
| e | 9 - SKF/direct Posting | It is the detail of activity costs |
The workbook BW_WBK_CO_0024 is used to perform some consistency checks. |
Example WP1
The aim is to have the detailed quantities and costs of production of the material 157142 in iMEP
There are 4 columns in the report:

The detail of costs & quantities is:
| Index 1 | ||
|---|---|---|
| a | 1 - Produced material | 35 000 TO of the finished product 81016 SOD are produced and the total production cost is 2 700 k€ |
| b | 3 - BOM component | 10 500 TO of Raw Materials are used for the production of the finished product with a total cost of 2 300 k€ |
| c | 5 - Activity type | The cost of activities used for the production is 350 k€. |
| d | 6 - Settlement | It is the production variance. The amount is settled to the P&L to the value field D05/E05/F05 |
The loads for this application it's once per daya as we can see below at 6 a.m: