The P&L (Profit and Loss) application it’s part of the Finance domain using data from SAP systems, non-ERP system and BFC (Business Financial Consolidation) information based on data from COPA (Controlling - Profitability Analysis) a component from SAP CO (Controlling) module. The aim of this application is to give a P&L reporting adapted to Soda Ash GBU requirements. It is based on the corporated P&L query and offered special axis and calculation for Soda Ash. |
For this Application the access is provided based on the BW menu "PL - Profit and Loss" and it's done via Service one. Fill the form In SAP system select the "WBP - BW Business Warehouse" In WBP - BW Business Warehouse : Select the Business Role select the "PL - Profit and Loss" |
Target Users: Soda Ash controllers. |
VERSION | DATE | MODIFIED BY | DESCRIPTION |
0.01 | 14.12.2023 | Inês Vilares | Initial draft |
|
The base is the same for the Profit and Loss application in the functional documentation. We can see in that documentation the logic for the P&L.
For this application this was built in 2018 and the need was to provide a dedicated report only for GBU SD .This report is a separate report from the P&L reports.
This new report:
On a monthly basis the business needs to analyzed the logistic costs and to verify the origin information to be able to see in more detail the flows associated to Soda Ash and the impact of the values in the P&L.
The Origin/Sourcing field will provide details on where the Soda Ash is produced (for example, it can be in Europe or North America), distinguishing whether the material is synthetic or natural.
The Scope field categorizes whether it is internal or external and further checks are conducted for these flows (for example, if it is Europe to Europe or Europe intra BICAR).
For this scope we only have one query:
| Reports | Definition | Prompts | BW Workbook Query | Query Technical Name |
|---|---|---|---|---|
| BW P&L by BU - Monthly Query (Soda Ash) (Core Query) | This report shows the values with the P&L structure with the additional information for some fields required for Soda Ash to see the amounts and quantities in detail for the flows/operations with Soda Ash (external and internal). | Mandatory:
Optional:
| N.A | BW_QRY_MVCOPA07_0001 |
The base is the same for the Profit and Loss application in the functional documentation. We can see in that documentation the logic for the P&L.
| Domain | Finance |
|---|---|
| Application | NA since it's only a query |
| Provider | MVCOPA07 |
To see the data from the source systems see below how the information is organized in the BW perspective:

Assuming that BW is the selected tool it is recommended creating a separate model/cube in BW although fed by the existing BW P&L one.
Reasons:
Macro process

as per standard.
as per standard.
as per standard.
as per standard.
as per standard.
as per standard.
as per standard.
as per standard.
The load for this report it's for working days around 3 a.m.