Renato Engrossa
 D&A KPI's Operator

Marie-Line Ardito
General Description
Items included: material item (material code <> #) created 
Item excluded: material item (material code = #) created
Vendors details results can be analyzed by:
  • items included
  • items excluded
 Date Reference:
        Contract creation date
 Refresh Frequency:
        3 times per month (1st, 5th and 26th) 
        *Loading M-1 Results

 

KPI Name
Calculation
Items Include
sum of material item (material code <> #) created 
Items excluded
sum of material item (material code = #) created 
Source Information: BW (WP1 & PF1)
Core Query:
BW_QRY_MV_MATAN1_0002
QV Query:
QVSBS_BW_QRY_MV_MATAN1_002