General Description |
|---|
Cost Centers are those exist in both RCS and PF1 controlling areas not flagged locked from actual primary cost, actual secondary cost and actual revenues.Active Cost Centers : Cost Centers with movements during the period
|
| Calculation | |
|---|---|
On Time or Early | Status if the closing step was performed within 15 minutes of the target time in the global calendar |
Late | Status if the closing step was performed more than 15 minutes after the target time in the global calendar |
Not Avalaible | In most cases, not available means that the closing step is not following the standard process and performed inside Schedule Manager. In some instances, this status means we are waiting some development before it will be available. In these cases, there will be comments provided |
Sources |
|
|---|---|
QV source | Manual File (from Primary Schedule Manager - SAP with the exception of BOIC Freeze which is from a BOIC report and BFC Package Balanced from a Salesforce Report) |
Refresh frequency | Monthly (16th of each month) |
Specific Dimensions |
|---|
|
Scope |
|---|
|