The purpose of this document is to define the conversion approach to create Work Order in S/4 HANA.
Legacy Plant Maintenance Work order is using a diverse range of formats across the different systems. There are instances where the same Work order is duplicated within and/or across sources, with informal words. This results in data inconsistency. As per SyWay design, EAM Maintenance Work order will be standardized.
The scope of this document covers the approach for converting active Work Order from Legacy Source Systems into S/4HANA following the Work Order Master Data Design Standard.
The data from legacy system includes:
The data from legacy system excludes:
Exception:
Orders with Technically Completed (TECO) status that have external services assigned – to be manually reviewed by the Business
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2, WP2 | An initial extract will be provided to business to evaluate. Additional data/records may be required and these will be constructed via DCT. Enrichment of in-scope data may be required and will be added via transformation rules (business/technical). | 131137 | S/4HANA | 131137 |
Notification and Work Order do not have multi language support. Work Order and Notification text will be migrated using EN logon.
Long text and DIR are not covered in this document as they are defined as another data object.
Not Applicable
Specify any special requirements or considerations that may impact the data conversion process based on specific locations, regulatory compliance or system limitations. Clearly outline any regional or localization requirements such as country-specific data formats, legal reporting obligations or industry standards that must be adhered to (e.g., localization rules for countries like China).
If the data conversion involves third-party systems or external data sources, such as Icertis, describe any additional requirements related to data mapping, transformation logic, validation rules or security measures that must be followed.
EAM Maintenance Work Order Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Class information follows the Master Data Standard document that is located here <include hyperlink>
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
9005-001 | C1 | Invalid or Inactive Equipment or Functional Location linked to Work Order | Work Order as per Relevancy Criteria assigned with an Equipment / Functional which does not belong below: The criteria for this report includes all Work Orders with system status not CRTD and not TECO | Equipment, Functional Location | PF1, WP1 |
9005-002 | C1 | Invalid or Inactive Activity Type linked to Work Order | Work Order as per Relevancy Criteria assigned with an Activity Type which does not belong below: | Activity Type | PF1, WP1 |
9005-003 | C1 | Invalid or Inactive Business Partner (Employee Personnel) linked to Work Order | Work Order as per Relevancy Criteria assigned with a Business Partner (Employee Personnel) which does not belong below: | Business Partner (Employee) | PF1, WP1 |
9005-004 | C1 | Invalid or Inactive Cost Centre linked to Work Order | Work Order as per Relevancy Criteria assigned with a Cost Centre which does not belong below: | Cost Centre | PF1, WP1 |
9005-005 | C1 | Invalid or Inactive Maintenance Item linked to Work Order | Work Order as per Relevancy Criteria assigned with a Maintenance Plan and Item which does not belong below: | Maintenance Item | PF1, WP1 |
9005-006 | C1 | Invalid or Inactive Material linked to Work Order | Work Order as per Relevancy Criteria assigned with a Material which does not belong below: | Material | PF1, WP1 |
9005-007 | C1 | Invalid or Inactive Notification linked to Work Order | Work Order as per Relevancy Criteria assigned with a Notification which does not belong below: | Notification | PF1, WP1 |
9005-008 | C1 | Invalid or Inactive Production Resources & Tool linked to Work Order | Work Order as per Relevancy Criteria assigned with a Production Resources & Tool which does not belong below: | Production Resources & Tool | PF1, WP1 |
9005-009 | C1 | Invalid or Inactive Profit Centre linked to Work Order | Work Order as per Relevancy Criteria assigned with a Profit Centre which does not belong below: | Profit Centre | PF1, WP1 |
9005-010 | C1 | Invalid or Inactive Revision linked to Work Order | Work Order as per Relevancy Criteria assigned with a Revision which does not belong below: | Revision | PF1, WP1 |
9005-011 | C1 | Invalid or Inactive Standard Text linked to Work Order | Work Order as per Relevancy Criteria assigned with a Standard Text which does not belong below: | Standard Text | PF1, WP1 |
9005-012 | C1 | Invalid or Inactive Task List linked to Work Order | Work Order as per Relevancy Criteria assigned with a Task List which does not belong below: | Task List | PF1, WP1 |
9005-013 | C1 | Invalid or Inactive WBS linked to Work Order | Work Order as per Relevancy Criteria assigned with a WBS which does not belong below: | Work Breakdown Structure | PF1, WP1 |
9005-014 | C1 | Invalid or Inactive Work Centre linked to Work Order | Work Order as per Relevancy Criteria assigned with a Work Centre which does not belong below: | Work Centre | PF1, WP1 |
9005-015 | C1 | Invalid, Inactive or no Fixed Asset linked to Work Order | Work Order as per Relevancy Criteria assigned with a Fixed Asset which does not belong below: | Fixed Asset | PF1, WP1 |
9005-016 | C1 | Work Orders technically completed but with Open Commitments (POs not closed, Open reservations, Open PR) | TBD | Work Order, Status | PF1, WP1 |
9005-017 | C2 | Open Work Orders older than 12 months | Open Work Orders older than 12 months | Creation Date, Status | PF1, WP1 |
9005-018 | C2 | Open Priority Work Orders older than 3 months | Open Work Orders older than 3 months with Priority as follows: | Creation Date, Status, Priority | PF1, WP1 |
9005-019 | C1 | Notification Storage Location incorrect. | Notificationas per Relevancy Criteria with Invalid Storage Location (T001L) | Storage Location | PF1, WP1 |
9005-020 | C1 | Work Order UOM Missing / incorrect. | Work Order as per Relevancy Criteria with no UoM Assigned or Invalid UoM (T006) | Unit of Measure | PF1, WP1 |
9005-021 | C1 | Work Order Purchasing Groups incorrect. | Work Order as per Relevancy Criteria with Invalid Purchasing Group (T024) | Purchasing Group | PF1, WP1 |
9005-022 | C1 | Work Order Purchasing Organization incorrect. | Work Order as per Relevancy Criteria with Invalid Purchasing Organization (T024E) | Purchasing Organization | PF1, WP1 |
9005-023 | C2 | Work Order Planning Plant and Maintenance Plant are not the same. | Work Order as per Relevancy Criteria with Planning Plant <> Maintenance Plant | Maintenance Plant, Planning Plant | PF1, WP1 |
Informal Words **
Group 1 | Group 2 | Group 3 | Group 4 | Group 5 |
|---|---|---|---|---|
*DNU | Delete | donot | Formerly | Old # |
.. | Deletion | DONT USE | From | Old[ ] |
/ | DELISTED | DON'T USE | Incorrect | PLEASE USE |
? | Discontinued | Dup Use | Invalid | Pls Use |
@ | Disposable | DUPLICATE | New | Previously |
^ | DNU | -DUPLICATE | NOT ACTIVE | Replace |
+ | Do Not | DUPLICATION | not in use | Replaced |
++ | Do Not Re | Duplicidad | Not Used | RESERVED |
£ | Do Not Sell | Duplikat | NOT VALID | Retired |
Defective | Do Not Use | Former | Obsolete | ZZDEL |
The high-level process is represented by the diagram below:
Summarize High-Level Process. Include diagrams, where applicable. Include information supporting details of Extract, Transform and Load specific to the Data Object
Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| Mapping Table Name | Mapping Table Description |
|---|---|
| Item # | Step Description | Team Responsible |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.