The purpose of this document is to define the conversion approach of GL Open Items into S/4 HANA.
GL Open Items are extracted from source as of cut-over date which then is used to prepared open items for migration
Only the accounts which are open item managed both in source and target will be part of migration of GL Open items.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | Cost Centre | S4HANA | ||
| WP2 | Cost Centre | S4HANA | ||
| PI2 | Cost Centre | S4HANA |
Summarize Multi-language Requirement/s, if any
Summarize Document Management requirement, if any
Summarize Legal Requirement/s, if any
Specify any special requirements or considerations that may impact the data conversion process based on specific locations, regulatory compliance or system limitations. Clearly outline any regional or localization requirements such as country-specific data formats, legal reporting obligations or industry standards that must be adhered to (e.g., localization rules for countries like China).
If the data conversion involves third-party systems or external data sources, such as Icertis, describe any additional requirements related to data mapping, transformation logic, validation rules or security measures that must be followed.
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach.
Table | Field | Data Element | Field Description | Data Type | Length (Decimals) | Requirement |
CSKS | KOSTL | Cost Centre | CHAR | 4 |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
1. | Can load, but business process will fail | Open Item is overdue and aged | TBD | Report | PF2 / PI2 / WP2 |
The high-level process is represented by the diagram below:
Summarize High-Level Process. Include diagrams, where applicable. Include information supporting details of Extract, Transform and Load specific to the Data Object

Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Req # | Requirement description | Team responsible |
1. | Ensure source tables BKPF, BSIS are extracted in tool according to the agreed cut-off date in the project plan | Data team |
2. | Perform preliminary completeness check documented in section 5.2.8.1.1 | Data team |
3. | Raise issues as defects if Req # 1 to 2 are not met | Data team |
4. | Repeat Req # 1 to 3 if required | Data team |
5. | Report extraction result to person in charge of APOI conversion | Data team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
Field Name | Field description | Rule |
BSEG-LZBKZ | SCB Indicator | Business to enter content as per data type and length permitted |
BKPF- XREF1_HD | Reference field 1 (header) | Business to enter content as per data type and length permitted |
BKPF- XREF2_HD | Reference field 2 (header) | Business to enter content as per data type and length permitted |
BSIK – KIDNO | Payment reference | Business to enter content as per data type and length permitted |
Suggestion to add:
Decimal validation - Check table TCURX for the document currency key and if Decimals (TCURX-CURRDEC) is ‘0’, validate that no decimal value is populated.
List the steps that need to occur before extraction can commence
Item # | Step description | Team responsible |
1. | Any period / year end close activities have been fully completed | Business |
2. | Reconciliation for intercompany payables have been completed, and adjustment made in legacy SAP system | Business |
3. | Reconciliation of migrated Purchase Order is completed before the extraction of Accounts Payable Open Items | Business and Data |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
Item # | Step description | Team responsible |
1. | Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into toolMigrate. | Data team |
2. | In tool, select the Trial Balance object PY. | Data team |
3. | Go to Process Area Launch and Process the Object - Trial Balance object - R4 Trial Balance PY. | Data team |
4. | Launch the Objects to execute transformation. | Data team |
5. | Monitor the transformation progress and ensure performance and completion is within allowed timeframe | Data team |
6. | Generate Pre-Load reports . | Data team |
7. | Generate data load count. | Data team |
8. | Log errors as defects, if any and address resolutions. Close defects. | Data team |
9. | Re-transform and re-validate the Pre-load reports if necessary. | Data team |
10. | Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off. | Business |
11. | Analyse and resolve any pre-load defects logged by business. | Data team |
12. | Repeat steps 6 to 11 if necessary | Data team |
13. | Proceed to pre-load validations | Data team |
Transformation Rules
Rule # | Source system | Source Table | Source Field | Source description | Target system | Target Table | Target Field | Target description | Transformation logic |
1. | N/A | N/A | N/A | N/A | S/4HANA | BKPF | BELNR | Document Number | Automatic determination of the Document number in target system. Document Date from source system is migrated into field SGTXT – see transformation rule for Line Item text field below. |
2. | Legacy | BKPF | BUKRS | Company Code | S/4HANA | BKPF | BUKRS | Company Code | Map from source to target using company code mapping table |
4. | Legacy | BSIK | HKONT | GL Account | S/4HANA | ACDOCA | HKONT | GL Account | Map from source to target using G/L Account mapping table |
Mapping Table Name | Mapping Table Description |
Company Code | Mapping of legacy company codes to target system value |
GL Account | Mapping of legacy GL accounts to target system value |
Profit Centre | Mapping of legacy Profit Center to target system value |
Business Partner | Mapping of legacy vendor accounts to target system value |
Trading Partner | Mapping of legacy trading partners to target system value |
Currency Key | Mapping of legacy currency keys to target system value |
Payment Block Key | Mapping of legacy payment block key to target system value |
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool. | Data team |
Task | Action |
Generation of | Mandatory field check. Posting key mapped Currency types mapped Profit Centres mapped Check Business Partners are extended to required company code Check if the GL Accounts extended to the company codes for the records by looking up SKB1. Check signage of amount. Check whether source data (including DCT) has debit and credit entries in the same line. If sign is the same in all the three currency fields, then no action needed. If the sign in the document currency and company code currency field are different, then the document needs to be corrected in the source system or DCT. Ensure all transactions have values in Document Currency and Local Currency |
Reconciliation of total | Record Count Summary at GL Account and Company Code level. Check Amount in Document Currency and Local Currency Check the sum of the amount in Document Currency and Local Currency in load file is the same as source. If any of the sum is different, flag the record as error. |
Task | Action |
Mandatory field mapping and transformation | Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. |
| Task | Action |
|---|---|
| Verify record count in Pre-load reports by region | In legacy system, execute report AP Line Item Display (t/code: FS10N ) with selection parameters stated in section 7.2. Group the output of the report by Company Code, GL Account and Profit Centre using subtotal function and compare the count in this report against the TB Balance ( PY ) count in the pre-load file. The record count for TB Balance ( PY ) may also be done on the more granular level. The recommended granular level or the subtotal fields can consist of: Company Code, Vendor, Profit Centre, Document Currency Key, Company ID for Trading Partner. If any of the count is different, raise defect and flag the relevant record as error. |
| Task | Action |
|---|---|
| Conversion accuracy | Verify GL Open Lines are transformed accurately as per endorsed transformation/mapping rules. Review error reports in tool for any mismatch or missing transformed values. In legacy system, execute report FBL3N If any of the sum is different, raise defect and flag the relevant record as error. |
| Business partner balance on Company code and profit center level | Check the total open item amount on Business partner at Company Code and Profit center level, against the total in legacy by Document, Local and Group currency. Apply currency rules where applicable |
The load process includes:
Item | Step description | Team responsible |
1 | Ensure the load tools are transported into the correct tool instance. | Data team |
2 | Ensure DCTs and all required mappings are submitted and complete | Data team |
3 | Ensure Pre-load sign-offs are obtained. | Data team |
4 | Execute tool Trial Balance Upload | Data team |
5 | Generate the post load reports in tool. | Data team |
6 | Log errors as defects, if any and address resolutions. Close defects. | Data team |
7 | Resolve defects by reupload and re-generate post load reports if necessary. | Data team |
8 | Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off. | Business |
9 | Repeat steps 5 to 7 if necessary. | Data team |
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
Item # | Configuration item |
1. | Company code-related configuration (posting period variant). |
2. | Finance posting (document types, document number ranges, special gl indicator) |
3. | Currencies (currency keys, decimal places in currencies) |
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1067 | GL Account Operational CoA (incl. secondary CE) |
| 1073 | Profit center |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
Error type | Error description | Action taken |
Posting Period Error | Posting period is blocked for posting | Review project / cutover plan and ensure posting periods can be opened for postings |
Profit Centre does not exist | Profit centre does not exist in company code | Ensure the profit centre mapping is correct and or create the profit centre if it is valid |
| Task | Action |
|---|---|
| Reconciliation of Record Count | Total number of records loaded for TB Balance ( PY ) will be generated in the Post-load reports in tool based on the target table and fields mentioned in section 3. The reconciliation needs to be executed on the total number of ‘valid’ records and currency amount per company code in the source compared to total number of records and currency amount in S/4HANA Record Count Check the sum of record count of the open items in the load file is the same as S/4HANA. The record count for TB Balance ( PY ) will be done on the group basis. The fields in the group are consist of: Company Code, Vendor Account Check Amount in Document Currency and Local Currency Check on line item level that the sum of the amount in Document Currency and Local Currency in the load file is the same as posted in S/4HANA. If any of the sum is different, flag the record as error. |
| Task | Action |
|---|---|
| Check values in key fields for accuracy | Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation. Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the legacy values side-by-side to allow for 100% check of all these fields in the shortest possible time. Any mismatch will be reported under the Post Load - Error report. |
| Task | Action |
|---|---|
| Record Count Check | Review the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations |
| Task | Action |
|---|---|
| Open items totals | Check business partner open item totals by Business partner, Company code, profit centre. Totals should be checked in Document, Local and Group currency. |
| Spot check | Business should choose some business partners and perform comprehensive check of open items, payment terms etc Such partners should have huge number of open items or be critical for payment runs in S4 or have certain complexity in conversion. |
Any additional key assumptions.