Status

Owner
StakeholdersThe business stakeholders involved in making, reviewing, and endorsing this decision. Type @ to mention people by name

Purpose

The purpose of this document is to define the conversion approach to create Materials - Purchasing View in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active Materials - Purchasing View from Legacy Source Systems into S/4HANA following the Materials Master Data Design Standard.

From the current system landscape, Material data exists separately in the legacy systems (PF2 and WP2), with potential discrepancies in both organizations. Harmonization and validation are required to ensure accurate and consolidated data in S/4HANA. While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design.

The data from legacy system may include:

  1. Uncleansed data or duplicated records

The data from legacy system excludes:

  1. All materials flagged for deletion
  2. Any blocked or obsolete materials
  3. Any inactive materials that are out of scope


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2,WP2

The Material Master Records will be extracted/collected via DCT. An initial extract of the relevant data will be provided in Google Sheet format to assist business in decision making on including any relevant data from Source Systems.

Any additional data that need to be created to support the new design may be added in the DCT.

A data review and standardization will be done across all Info Records in the DCT. 

500,000S4H500,000















Additional Information

Multi-language Requirement

Not Applicable

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Specify any special requirements or considerations that may impact the data conversion process based on specific locations, regulatory compliance or system limitations. Clearly outline any regional or localization requirements such as country-specific data formats, legal reporting obligations or industry standards that must be adhered to (e.g., localization rules for countries like China).

If the data conversion involves third-party systems or external data sources, such as Icertis, describe any additional requirements related to data mapping, transformation logic, validation rules or security measures that must be followed.




Target Design

With Functional input, document the technical design of the target fields that are in the scope of this document.

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
S_MARAMATNR
Material NumberAutomatic   Mandatory
S_MARCWERKS
PlantConfigured
Mandatory
S_MARAMEINS
Base Unit of Measure (ISO Format)Configured
Mandatory
S_MARABSTME
Order Unit of Measure (ISO Format)Configured
Mandatory
S_MARAVABME
State of Variable Purchase Order UnitConfigured
Optional
S_MARCEKGRP
Purchasing GroupConfigured
Mandatory
S_MARAMATKL
Material GroupConfigured
Mandatory
S_MARCMMSTA
Plant-Specific Material StatusConfigured
Optional
S_MARCMMSTD
Valid From Date for StatusDate
Optional
S_MARCTAXIM
Tax IndicatorConfigured
Optional
S_MARANRFHG
Material Disc In KdConfigured
Optional
S_MARCMFRGR
Material Freight GrpConfigured
Optional
S_MARCKAUTB
Automatic Purchase Oder AllowedText1Optional
S_MARCXCHPF
Batch Management Req. IndicatorText1Optional
S_MARAEKWSL
Purchasing Value KeyConfigured
Mandatory
S_MARCWEBAZ
GR Processing TimeText2Mandatory


Data Cleansing

All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.

If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.

IDCriticalityError Message/Report DescriptionRuleOutputSource System
2020-001C1Purchasing GroupAll materials have been mapped to a Purchasing Group

2020-002C1Purchasing Value KeyAll material requirements to be confirmed

2020-003C1GR processing timeAll material requirements to be confirmed









Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity

Summarize Data Privacy and Sensitivity Requirements, if any


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

1

Extract data from source system based on relevancy rule

SyWay Data Team

2

Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. 

SyWay Data Team








Selection Screen

If applicable, this section will give the details on any selection screen parameters, including the parameter type, that are required to be entered to ensure consistent data extracts.
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Materials - Purchasing View data with exception of some fields which require transformation as mentioned in the transformation rule.

Materials - Purchasing View DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

List the steps that need to occur before extraction can commence

Item #Step DescriptionTeam Responsible

1

Data cleansing of legacy Material data must be completed.
If standardization within the DCT begins using relevant data from PF2 and WP2 before the cleansing is finalized, it is understood that the business will take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT.

Business











Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

SyWay S2P Data Team

2

<Add steps from Syniti Migrate here>

SyWay S2P Data Team

3

Review and Validate Error and Preload Reports

SyWay S2P Data Team

4

Generate Load Files

SyWay S2P Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1PF2/WG2S_MARAMATNRMaterial NumberS/4HANAS_MARAMATNRMaterial NumberGenerate new Material number in Target System and maintain mapping in reference table
2PF2/WG2S_MARAMTARTMaterial TypeS/4HANAS_MARAMTARTMaterial TypeMap from source to target using Material Type mapping table
3PF2/WG2S_MARAMATKLMaterial GroupS/4HANAS_MARAMATKLMaterial GroupMap from source to target using Material Group mapping table
4PF2/WG2S_MARAMBRSHIndustry SectorS/4HANAS_MARAMBRSHIndustry SectorCopy from source to target system
5PF2/WG2S_MARAMAKTXDescriptionS/4HANAS_MARAMAKTXDescriptionCopy from source to target system
6PF2/WG2S_MARASPRASLanguage KeyS/4HANAS_MARASPRASLanguage KeyCopy from source to target system
7PF2/WG2S_MARAMEINSBase Unit of Measure (ISO Format)S/4HANAS_MARAMEINSBase Unit of Measure (ISO Format)Map from source to target in adherence to Data Standard
8PF2/WG2S_MARASPARTDivisionS/4HANAS_MARASPARTDivisionCopy from source to target system
9PF2/WG2S_MARABISMTOld Product NumberS/4HANAS_MARABISMTOld Product NumberCopy in Material number from source system
10PF2/WG2S_MARABSTMEOrder Unit of Measure (ISO Format)S/4HANAS_MARABSTMEOrder Unit of Measure (ISO Format)Map from source to target in adherence to Data Standard
11PF2/WG2S_MARAEKWSLPurchasing Value KeyS/4HANAS_MARAEKWSLPurchasing Value KeyMap from source to target using Purchasing Value mapping table
12PF2/WG2S_MARAWBKLAValuation ClassS/4HANAS_MARAWBKLAValuation ClassMap from source to target using Valuation Class mapping table
13PF2/WG2S_MARAEKGRPPurchasing GroupS/4HANAS_MARAEKGRPPurchasing GroupMap from source to target using Purchasing Group mapping table
14PF2/WG2S_MARATAKLVTax ClassificationS/4HANAS_MARATAKLVTax ClassificationCopy from source to target system


Transformation Mapping

Use the exact name and reference this section in the “Transformation rules” above
Mapping Table NameMapping Table Description

Material Type

Mapping of legacy Material Types to target system value

Material Group

Mapping of legacy Material Groups to target system value





Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure DCT tables completeness

SyWay S2P Data Team

2

Value Mappings are according to the latest design - <List of Value Mappings>

SyWay S2P Data Team








Pre-Load Validation

Project Team

The following pre-load validations will be performed by the Project Team.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Business

The following pre-load validations will be performed by the business.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence

Configuration

List the Configurations required before loading can commence

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

The following post-load validations will be performed by the Project Team.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Business

The following post-load validations will be performed by the business.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Data Object is in scope based on data design and any exception requested by business.

Any additional key assumptions.


See also

Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.

Change log