| Status | |
|---|---|
| Owner | The person responsible for driving this decision and documenting it. Type @ to mention people by name |
| Stakeholders | The business stakeholders involved in making, reviewing, and endorsing this decision. Type @ to mention people by name |
The purpose of this document is to define the conversion approach to create Measurement Document in S/4 HANA.
Summarise how the data is currently utilized and set up in the legacy system/s and how object is intended to be represented in S/4, and any other relevant information
The scope of this document covers the approach for converting active Measurement Document from Legacy Source Systems into S/4HANA following the <Data Object> Master Data Design Standard.
The approach is to migrate the last Measurement Document for each active Measuring Point which is driving the active Maintenance Plans and Items in order to start the Maintenance Plan in S/4 HANA with the objective to continue with the cycle.
The data from legacy system includes:
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2, WP2 | Last Reading of Measurement Documents will be extracted from PF1 and WP1 | 6000 | S/4HANA | 6000 |
| PF2, WP2 | Historical Measurement Documents will be extracted from PF1 and WP1 | nnn | S/4HANA | nnn |
| DCT | Measurement Documents for plants which do not have data existing from PF2 and PF2 | nnn | S/4HANA | nnn |
| DCT | Historical Measurement Documents for plants which do not have data existing from PF2 and PF2 | nnn | S/4HANA | nnn |
Measurement document does not have multi language support. Measurement document text will be migrated using EN logon.
N/A
N/A
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| MARA | MATNR | MATNR | Material Number | CHAR | 18 | Mandatory |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 9002-001 | C3 | Missing Measurement Document for Measuring Points assigned to Maintenance Plan | If the Measuring Point is assigned to an ACTIVE Maintenance Plan, it must have valid and relevant Measurement Documents. This is the pre-requisite for Start PM Plan. | All key fields | PF2, WP2 |
The high-level process is represented by the diagrams below.
The following represents the high-level process for Source System Extraction:

The following represents the high-level process for DCT:

Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | Data Team |
| 2 | Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | Data Team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| N/A | ||||
<Object> DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| N/A | ||
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Measuring points need to be extracted first with their respective relevancy rules applied before measurement document data can be extracted referencing to the relevant measuring point. | Data Team |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| Mapping Table Name | Mapping Table Description |
|---|---|
| Item # | Step Description | Team Responsible |
|---|---|---|
1. | Measuring point XREF table should be available after measuring point loaded. | Data Team |
| Task | Action |
|---|---|
Verify Record Count | Data team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | Data team to verify that all fields below meet pass the checks: 1. Mandatory Fields 2. Field and Value Mapping Correctness 3. Null Checks 4. Text Length Checks |
Review error reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
| Task | Action |
|---|---|
Verify Record Count | Business team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | Business to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off data) |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| N/A | |
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1012 | Measuring Point |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
Invalid Data | Invalid Measuring point | Expedite whether the master data is available in the system |
| Task | Action |
|---|---|
Verify Count | Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.). |
| Task | Action |
|---|---|
Conversion Accuracy | Data team to verify that the Measuring Point data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Measuring Point data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.