The purpose of this document is to define the conversion approach for Quota Arrangements to be uploaded into SAP S/4HANA as part of the Procurement Data Migration. Quota Arrangements are used to determine the distribution of procurement quantities across multiple sources of supply, providing control over vendor sourcing allocations.
---CHECKLIST---
--- Additional topics to check---
This conversion approach covers active and relevant Quota Arrangements maintained at the material, plant, and source (vendor or source list) level. Records from legacy ECC systems (e.g., PF2, WP2) will be extracted, validated, transformed, and loaded into the S/4HANA system.
Only quota entries linked to valid material and vendor combinations and with an active allocation percentage will be considered in scope. Obsolete, deleted, or inactive quota records will be excluded. The harmonization process will align multiple legacy records into a consistent target format.
The data from legacy system includes:
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | Only open/valid documents will be migrated | 8 | S4/Hana | 4 |
| WP2 | Only open/valid documents will be migrated | 205 | S4/Hana | 42 |
Descriptions are not applicable for Quota Arrangement, but Plant and Purchasing Organization descriptions may be presented in English and logon language if available.
N/A
N/A
Processing Type ETL:
The extraction and transformation will be done by Syniti, while the loading will be executed by a Standard tool of SAP Migration Cockpit.
Quota Arrangement will be loaded into SAP S/4HANA using standard structures:
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| EQUK | MANDT | MANDT | Client | CLNT | 3 | Required Key Field - Automatically updated |
| EQUK | MATNR | MATNR | Material Number | CHAR | 18‑40* | Required Key Field - Automatically updated |
| EQUK | WERKS | WERKS_D | Plant | CHAR | 4 | Required Key Field - Automatically updated |
| EQUK | BDATU | QUOBI | Quota arrangement period valid until | DATS | 8 | Required Key Field - Automatically updated |
| EQUK | VDATU | QUOAB | Quota arrangement period valid from | DATS | 8 | Required |
| EQUK | QUNUM | QUNUM | Number of quota arrangement | CHAR | 10 | Automatic |
| EQUK | ERDAT | ERDAT | Date on which record was created | DATS | 8 | Automatic |
| EQUK | ERNAM | ERNAM | Name of person who created the object | CHAR | 12 | Automatic |
| EQUK | SCMNG | SCMNG | Minimum quantity for splitting quota | QUAN | 15.3 | Conditional. Syensqo user need to specify the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run.
|
| EQUK | CHANGEDON | TIMESTAMPL | UTC timestamp when record was changed | DEC | 21 | Opcional |
| EQUP | MANDT | MANDT | Client | CLNT | 3 | Required Key Field - Automatically updated |
| EQUP | QUNUM | QUNUM | Number of quota arrangement | CHAR | 10 | Required Key Field - Automatically updated |
| EQUP | QUPOS | QUPOS | Quota arrangement item number | NUMC | 3 | Required Key Field - Automatically updated |
| EQUP | BESKZ | QBESK | Procurement type | CHAR | 1 | Required. Allowed procurement type will be based on material master data set-up. So if material master is set-up as External procurement, then user can only choose External procurement during quota arrangement creation. |
| EQUP | SOBES | SOBES | Special procurement type | CHAR | 1 | Conditional. If any special procurement such as consignment or subcontracting exist for a supplier, then choose relevant type in this field. |
| EQUP | LIFNR | ELIFN | Vendor account number | CHAR | 10 | Required |
| EQUP | BEWRK | BEWRK | Plant from which material is procured | CHAR | 4 | Not Required. Syensqo will not need quota arrangement for materials provided within internal production plants |
| EQUP | QUOTE | QUOTE | Quota | DEC | 3 | Required in case of multiple suppliers exist for particular material. Quota will be used to identify portion of quantity to be procured from particular supplier. |
| EQUP | QUBMG | QUBAS | Base quantity of quota arrangement item | QUAN | 15.3 | Conditional. Set quota base quantity if to avoid changes in the quantity to be allocated in case new source is added. If quota base quantity is not specified, then system will automatically allocate quantity to supplier(s). |
| EQUP | QUMNG | QUMNG | Allocated quantity of quota arrangement item | QUAN | 15.3 | Opcional |
| EQUP | MAXMG | QUMAX | Maximum quantity of quota arrangement item | QUAN | 15.3 | Opcional |
| EQUP | VERID | VERID | Production version | CHAR | 4 | Opcional |
| EQUP | MAXLS | MAXLS | Maximum lot size per quota item | QUAN | 13.3 | Opcional |
| EQUP | MINLS | MINLS | Minimum lot size per quota item | QUAN | 13.3 | Opcional |
| EQUP | RDPRF | RDPRF | Rounding profile | CHAR | 4 | Opcional |
| EQUP | KZEIN | KZEIM | Once‑only indicator | CHAR | 1 | Opcional |
| EQUP | ABRMG | ABRMG | Maximum release quantity per period | QUAN | 13.3 | Opcional |
| EQUP | ABPER | ABPER | Period related to release quantity | CHAR | 1 | Opcional |
| EQUP | ABANZ | ABANZ | Number of periods for release quantity | NUMC | 2 | Opcional |
| EQUP | PREIH | PREIH | Priority for determination sequence | NUMC | 2 | Opcional |
| EQUP | EMATN | EMATN | Manufacturer part number's material number | CHAR | 18 | Opcional |
| EQUP | PLIFZ | PLIFZ | Planned delivery time in days | DEC | 3 | Opcional |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 001 | Medium | Ensure RFQ types (e.g., AN, ANQ) are valid and configured in S/4HANA | - Delete or correct RFQs using types that are not configured in S/4HANA - Map to valid types if migration logic allows | ||
| 002 | Medium | Consistent numbering scheme, no duplicates | -Identify duplicates via RFQ number (e.g., EBAN-BANFN or custom RFQ ID) - Keep only one version, preferably the most recent - Renumber only if permitted by target system config | ||
| 003 | Medium | RFQ dates (creation, validity from/to) must be consistent and within allowed range | - Correct invalid dates (e.g., validity end before start) - Delete expired RFQs if beyond retention cutoff (e.g., older than 5 years) - Flag records with future-dated creation or unrealistic validity ranges for review | ||
| 004 | Medium | Material (MATNR) not in the approved Material Master scope | Delete the line item from the RFQ | ||
| 005 | Medium | Material flagged for deletion (MARA–LVORM = X or MM03 deletion flag) | Exclude the RFQ line | ||
| 006 | Medium | Material belonging to an obsolete Material Group (MATKL) | Validate with business, likely delete | ||
| 007 | Medium | Non-stock/service items without master data in S/4HANA | Exclude or replace with valid alternatives |
The high-level process is represented by the diagram below:
Summarize High-Level Process. Include diagrams, where applicable. Include information supporting details of Extract, Transform and Load specific to the Data Object


Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 001 | The material exists and is in scope | Syniti Team |
| 002 | The plant exists and is in scope | Syniti Team |
| 003 | The vendor is active and valid | Syniti Team |
| 004 | The quota is > 0 | Syniti Team |
| 005 | The record is not marked for deletion | Syniti Team |
| 006 | The record has not expired (DATBI >= current date) | Syniti Team |
| 007 | Select records where EQUK-ERDAT >= 01.01.2023 | Syniti Team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Quota Arrangements depend on the successful migration of the following objects:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 001 | Material Master | |
| 002 | Vendor Master | |
| 003 | Source List (EORD) | |
| 004 | Purchasing Info Records |
These must be loaded prior to the execution of Quota Arrangement upload.
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
Transformation will involve harmonizing supplier codes, plant IDs, and units of measure across systems. Where multiple legacy entries exist for the same material/plant, the most recent or business-prioritized record will be retained.
Quota percentage (ANZQU) will be recalculated if source values are inconsistent or incomplete. Date fields will be reformatted to YYYYMMDD and adjusted to cover valid procurement windows.
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| Mapping Table Name | Mapping Table Description |
|---|---|
| Item # | Step Description | Team Responsible |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
The load process includes:
Load will occur in mock and production phases, with logs captured and reviewed for consistency, completeness, and errors.
As part of the Loading Strategy, the data will be loaded using SAP LSMW leveraging BAPI_QUOTA_CREATE. No standard Migration Cockpit object exists for quota arrangements. The BAPI supports creation of records based on target-aligned templates. Staging will be handled by Syniti.
Load will occur in mock and production phases, with logs captured and reviewed for consistency, completeness, and errors.
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.