The document describes the landscape and high-level transport process for R2 applications.
The transport process for the following applications will be covered in this document.
| Application | Type |
|---|---|
Ariba Sourcing | Brownfield system managed by Syensqo IT |
Ariba Cloud Integration Gateway | Brownfield system managed by Syensqo IT |
ICertis Contract Intelligence | Greenfield system managed by SyWay |
DocuSign | Brownfield system managed by Syensqo IT |
Integration Suite | Brownfield system managed by Syensqo IT |
Syniti | Greenfield system managed by SyWay |
ECC & PRS | Brownfield system managed by Syensqo IT |
Cloud Identity Services | Greenfield system managed by SyWay |
Out of Scope
As part of release 2, no changes is expected in the following systems and are considered out of scope for this document.
Detailed technical steps on how transports will be performed is also considered out of scope as the steps can be found in product documentations.
The following sections will cover the following the the applications in scope.
There are 3 Ariba Sourcing tenants for Release 2.
| Tenant | Description |
|---|---|
| Supplemental |
|
| Test |
|
| Production | Existing Syensqo Production tenant. |
Supplemental Realm will be repurposed release 4 after integration test (24-Nov). Hence there will be 2 transport paths for Ariba Sourcing

The following describes the transport process for Ariba Sourcing:
Ariba Sourcing and CIG tenants are provisioned together and integrated by SAP. Hence the landscape and transport path for Ariba CIG is the same as Ariba Sourcing.
The following describes the transport process for Ariba CIG:
ICertis landscape consists of 2 tiers.
| Tenant | Description |
|---|---|
| Non-PRD | Used for all R2 project activities (E.g., Development, Integration Test, UAT) |
| Production | During project phase, Production instance will be used to practice loading Production contract data loads. Before Go-live, data in Production will be cleared in preparation for Go-Live. |
Configurations and changes will be performed in non-PRD and transported to Production instance during project phase (to support data load) and ACO.
Promote Configurations (P2P) Tool will be used to transport changes from non-PRD to Production.
DocuSign landscape consists of 2 tiers.
| Tenant | Description |
|---|---|
| Non-PRD |
|
| Production |
|
Configurations and changes will be performed in non-PRD and transported to Production instance during ACO.
The following describes the transport process for DocuSign:
Since the new R2 interfaces deployed in integration suite will be integrating with ECC, Syensqo's Integration Suite will be leveraged and consists of 3 tier landscape.
| Tenant | Description |
|---|---|
| Development |
|
| Test |
|
| PRD |
|
Existing transport design will be leveraged for R2: DEV → QAS → PRD.
Syensqo currently uses BMC Helix and SAP Solution Manager (ChaRM) to manage integration suite transports. For integration suite, the existing urgent change request will be used for R2.
For more details, please refer to Syensqo Transport Process.
Chnages will be transported from DEV to QAS and PRD by Syensqo IT and will be done using a manual approach (export/import and manual configuration in each tenant).
There will be one instance for Syniti and it will be used for all project activities.
The following diagram describes how one Syniti instance will be integrated with multiple systems.

Changes will be made in Development job and tested before similar changes are made in Test job and tested. During cut-over, PRD job will be created.
Each Syniti jobs will be configured manually. Hence the data team will need to replicate changes manually.
The following sections are applicable for both WP2 and PF2 ECC landscapes.
Syensqo has a 4 tier ECC landscape.
| Tenant | Description |
|---|---|
| Development | Used for R2 integration build and unit test |
| QAS | Used for R2 integration test and UAT. |
| Pre-PRD | Not used for R2 |
| PRD | R2 Changes will be deployed during ACO. |
Syensqo currently uses BMC Helix and SAP Solution Manager (ChaRM) to manage ECC transports. For R2, a normal change request process will be used.
For more details, please refer to Syensqo Transport Process.
ECC transports are automated by SAP ChaRM.