Purpose

The purpose of this document is to define the conversion approach to create TM-Transportation zones in S/4 HANA TM (Transportation Management).

The transportation zone is a geographical grouping of locations that is used for the purpose of routing. It can be the combination of country, state, postcodes, or individual locations.

 The data for transportation zones in S/4 TM would need to be constructed in data collection template (DCT). The existing legacy data would be provided in google sheet for reference.


Conversion Scope

The scope of this document covers the approach for creating Transportation zones in S/4HANA following the TM Transportation zones Master Data Design Standard. This includes:

  • Capturing and using the Transportation zone data in data collection template (DCT).
  • Applying transformation logic via Syniti to conform with the S/4 HANA data model.
  • Loading the transformed data into SAP S/4 HANA while ensuring data integrity.

The data from legacy system includes:

  1. N/A (Manual data collection)

The data from legacy system excludes:

  1. N/A (Manual data collection)


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

DCT

Creation of TM Transportation zones


An initial extract of the transportation zones will be provided in google sheet format to assist business in decision making on including any relevant data from PF2 and WP2.

TBDS/4 HANA (TM)TBD















Additional Information

Multi-language Requirement

Summarize Multi-language Requirement/s, if any

Document Management

Summarize Document Management requirement, if any

Legal Requirement

Summarize Legal Requirement/s, if any

Special Requirements

Specify any special requirements or considerations that may impact the data conversion process based on specific locations, regulatory compliance or system limitations. Clearly outline any regional or localization requirements such as country-specific data formats, legal reporting obligations or industry standards that must be adhered to (e.g., localization rules for countries like China).

If the data conversion involves third-party systems or external data sources, such as Icertis, describe any additional requirements related to data mapping, transformation logic, validation rules or security measures that must be followed.




Target Design

The complete information of the key fields that hold the default route information follows the Master Data Standard document.

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
/SCMB/ZONEID_ZONEMATNRTransportation Zone NameCHAR20Mandatory
/SCMB/ZONETDESCR
DescriptionCHAR40Mandatory
/SCMB/ZONETSPRAS

Language Key


8 languages in scope: English, French, Italian and Mandarin and Brazilian Portuguese, German, Spanish and Thai, as per KDD055

CHAR1Mandatory
/SCMB/ZONETYPE_ZONE
Zone TypeCHAR1Mandatory
/SAPAPO/LOCXPOS
Longitude coordinateCHAR15Optional
/SAPAPO/LOCYPOS
Latitude coordinateCHAR15Optional
/SAPAPO/LOCPRECISID
Precision  of a Geo locationCHAR4Optional
/SAPAPO/LOCTZONE
Time ZoneCHAR6Optional
/SAPAPO/LOCZPOS
Location AltitudeNUM9,3Optional
/SAPAPO/LOCGEO_VALIDITY_END
Validity End of Geo DataNUM (DATE)
Optional
/SAPAPO/LOCMATCH_GC
Percentage of accuracy (coordinates)NUM3Optional
/SAPAPO/LOCGC_LEVEL
Geocoding Level for a LocationNUM4Optional
/SAPAPO/LOCSTRATEGY
Strategy to determine the coordinatesCHAR10Optional
SCMB/ZONE_DID_LOC_EXT
Location CodeCHAR20Optional
SCMB/ZONE_DLOC_TYPE
Location TypeCHAR4Optional
SCMB/ZONE_P, SCMB/ZONE_R COUNTRYISO
Country KeyCHAR2Optional
SCMB/ZONE_PPCODE_FROM
Postal code_fromCHAR10Optional
SCMB/ZONE_PPCODE_TO
Postal code_toCHAR10Optional
SCMB/ZONE_RREGION
Region (State, Province, County)CHAR3Optional


Data Cleansing

Transportation zone data will be populated directly in the Data Collection Template (DCT).

If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:

Please note that the data may have to be loaded in multiple target systems (US instance, China instance and RoW).

Data Privacy and Sensitivity

Summarize Data Privacy and Sensitivity Requirements, if any


Extraction

  1. Syniti Migrate connects to the sources.
  2. An initial extract of the relevant Transportation zones will be loaded into a google sheet report to assist business with any rationalization.

If the data does not exist in legacy systems, the data will be manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate.

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleSyWay Data Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team







Selection Screen

If applicable, this section will give the details on any selection screen parameters, including the parameter type, that are required to be entered to ensure consistent data extracts.
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Transportation zone data with exception of some fields which require transformation as mentioned in the transformation rule.

  1. The extracted report will be loaded into the required structure using the DCT.
  2. Standardization activities (including deduplication, standardization and additions)  will be carried out within the DCT.

Please refer to the below Google sheet for the DCT rules (main DCT page and another page for non English descriptions).

Transportation zones DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

List the steps that need to occur before extraction can commence

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti platform to make the data Target ready:

  1. Perform value mapping and data transformation rules.

    1. Legacy values are mapped to the to-be values (this could include a default value)

    2. Values are transformed according to the rules defined in Syniti platform

  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #

Step Description

Team Responsible

1

Capture the data for Transportation zone in DCT. Review and correct any errors if bulk uploading data via downloaded excel DCT template.

Business team

2

Ensure the mapping tables which are needed during transformation have been reviewed and signed off by business.

Business team, Data Team (SCM)

3

Obtain DCT Sign-off from Business

Data Team (SCM)

4

Generate Pre-Load reports 

Data Team (Syniti)

5

Review and Validate Error and Preload Reports

Data Team (SCM)

6

Log errors as defects, if any and address resolutions. 

Data Team (SCM)

7

Re-transform and re-validate the Pre-load reports if necessary.

Data Team (SCM), Data Team (Syniti)

8

Obtain preload validation sign-off from Business

Business + Functional (SCM) + Data Team (SCM)

9

Generate Load Files

Data Team (Syniti)


Transformation Rules

Please check the attached file for the complete source-to-target field mapping, validation checks and proposed error messages. The validation checks list is not exhaustive and may change over time as the design and configuration of the system evolves.

Rule #

Source system

Source Table

Source Field

Source Description

Target System

Target Table

Target Field

Target Description

Transformation Logic










































Transformation Mapping

Use the exact name and reference this section in the “Transformation rules” above

Mapping Table Name

Mapping Table Description









Transformation Dependencies

List the steps that need to occur before transformation can commence

Item #

Step Description

Team Responsible














Pre-Load Validation

Project Team

The following pre-load validations will be performed by the Project Team.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Business

The following pre-load validations will be performed by the business.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence

Configuration

List the Configurations required before loading can commence

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

The following post-load validations will be performed by the Project Team.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Business

The following post-load validations will be performed by the business.

Completeness

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Accuracy

TaskAction
titlespecific details of what and how the task needs to be performed e.g. which reports are being used etc.





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Data Object is in scope based on data design and any exception requested by business.

Any additional key assumptions.


See also

Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.