This document is a complement to Standard Operating Procedure "Article Creation and Management", adapting the process to North America. |
Requests can be performed by the Stockroom Coordinator or the Buyer, in this case, the request is auto-approved, as the Buyer is responsible for reviewing and approving the requests.
All requests are sent to Master Data via e-mail or Webform
E-mail: general.3s-codif@solvay.com
WebForm: https://sites.google.com/a/solvay.com/solvay-buyer-portal/
The PtP Portal User´s guide can found at: https://docs.google.com/a/solvay.com/presentation/d/1rln_Sp3OadG6nZUJLrd7VTJjYBUvCa1lsiPfYh7BNNk/edit#slide=id.p
The referral material mentioned in this procedure, such as ZHS Material Code List and Languages List are contained in the Main Master Data file.
This document´s objective is to provide a guide to managing Material Master Data.
Under Master Data´s scope, is the management of Industrial Supplies for NAM region.
| Requester | Prior to submitting a new request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the ZERS form must be filled and submitted for the Buyer´s review and approval. Once the authorization is obtained, the form and approval must be sent to Master Data team. |
|---|---|
| Master Data | Requests are received by the team, who will check if the form was filled correctly and if the required approval was obtained. A second search in the system is performed by the team, to ensure no duplicates are created. After the material and views are created, the request is forwarded to the site´s Controller, who will create the Accounting View and finish the material creation process. |
| Description | Requests for material creation can be performed by the Stockroom Coordinator or the Buyer, in this case, the request is auto-approved, as the Buyer is responsible for reviewing and approving the requests. |
|---|---|
| ZERS Form | |
| Material Creation Workflow |
|
The PIR is a method for managing the purchase price. An alternate management method is a contract. When a contract exists, then the PIR should not be used for the same material.
A new PIR is created when a purchase from a new material/supplier combination is needed. Within the PIR there is another unique combination named Purchasing Org. Data, formed by the combination of the Purchasing Org., Info Category and Plant Code. If one of those elements is changed, this results in a new record within the PIR.
In the PIR´s General View the WW fields are available. These fields determine the information common to all plants using the material/supplier combination.
The PIR´s maintenance is the buyer´s and LPR´s responsibility. Any information missing in the ZERS form (previously approved by the buyer) and necessary in the PIR should be completed by them.
Requests to update a material can be sent by the Storeroom administrator, Buyer or LPR.
The information that is setup in tabs Basic Data 1 and Basic Data 2 are common to all plants that use the material. To update information present in those tabs, approval from all Storeroom personal from the different plants is necessary. Purchasing views are plant specific, so no approval is required.
If a new vendor will be used to supply a material or that material is no longer in use, a request to add a deletion flag for a PIR will be received.
If the material is no longer in use, a request to add a deletion flag to it will be received. The deletion flag can be added to either the material or plant level. In the material level, all plants using the material will be affected. In this case, the approval from all plants is necessary. The plant level will affect only a specific plant, so other locations will still be able to request that particular material.
Requests to update the PIRs validity period can be received.