| Status | |
|---|---|
| Owner | |
| Stakeholders | The business stakeholders involved in making, reviewing, and endorsing this decision. Type @ to mention people by name |
The purpose of this document is to define the conversion approach to create Maintenance Strategy in S/4 HANA.
Legacy Plant Maintenance Maintenance Strategy is using a diverse range of formats across the different systems. There are instances where the same Maintenance Strategy is duplicated within and across sources, with informal words. This results in data inconsistency. As per SyWay design, Maintenance Strategy will be standardized.
The complete information of the key fields that hold the Task List information follows DD-FUN-050 Master Data Standard_1017-Maintenance Strategy.xlsx
The scope of this document covers the approach for converting active Maintenance Strategy from Legacy Source Systems into S/4HANA following the Maintenance Strategy Master Data Design Standard.
A Maintenance Strategy in SAP defines how and when maintenance tasks should be performed. It’s a core concept in SAP Plant Maintenance (PM) that helps organizations plan preventive maintenance activities efficiently.
No data from legacy system will be migrated and all new strategies will be constructed using DCT.
Types of strategy (defined by the first 2 characters of the strategy):
01 - Time-Based Strategy
-Description:
Used for assets that require preventive maintenance at fixed time intervals.
-Application:
Maintenance cycles defined in days, weeks, months, or years.
-Example:
Lubrication every 3 months, inspection every 12 months.
02 - Performance-Based Strategy
-Description:
Used for assets that require preventive maintenance based on operational usage or performance.
-Application:
Maintenance cycles defined in measured units such as operating hours, kilometres, or production counts.
-Example:
Preventive maintenance every 2,000 operating hours.
03 - Corrective Strategy
-Description:
Used to manage corrective or run-to-failure maintenance and to differentiate task lists created for repeated corrective activities.
-Application:
This strategy contains a dummy package (not assigned in task lists) and acts as a placeholder to enable reuse of corrective task lists.
-Example:
Standard repair procedures applied upon failure.
04 - Turnaround/Shutdown Strategy
-Description:
Used for assets undergoing maintenance during planned turnarounds or shutdowns.
-Application:
Defines repetitive and pre-planned maintenance work that occurs during turnaround/shutdown periods.
-Example:
Boiler overhaul during annual plant shutdown.
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
DCT | All Maintenance Strategy will be constructed using DCT | 400 | S/4HANA | 400 |
Maintenance Strategy description will be made available in English.
Multi language is supported for Maintenance Strategy. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Maintenance Strategy.
Not Applicable
Not Applicable
Not Applicable
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| T351 | STRAT | STRAT | Maintenance Strategy | CHAR | 6 | Mandatory |
| T351T | KTEXT | TXWSTRA | Description of maintenance strategy | CHAR | 30 | Mandatory |
| T351 | ZEIEH | DZEIEH | Unit for the performance of maintenance tasks | UNIT | 3 | Mandatory |
| T351 | TOLE1 | TOLERPLUS | Tolerance for Late Completion (%) | NUMC | 3 | Conditional |
| T351 | TOLE2 | TOLERNEG | Tolerance for Early Completion (%) | NUMC | 3 | Conditional |
| T351 | VERS1 | VERSCHPLUS | Shift Factor for Late Completion | NUMC | 3 | Conditional |
| T351 | VERS2 | VERSCHNEG | Shift Factor for Early Completion | NUMC | 3 | Conditional |
| T351 | TERMK | TERMKNZ | Scheduling indicator | CHAR | 1 | Mandatory |
| T351 | HORIZ | HORIZONT | Call horizon for maintenance plan calls | NUMC | 3 | Conditional |
| T351 | HORIZ_QUALIFIER | EAM_CC_CALLHORIZON_QUALIFIER | Calculation Type of Call Horizon | CHAR | 1 | Conditional |
| T351 | FABKL | FABKL | Factory calendar key | CHAR | 2 | NU |
| T351 | AUTHGR | EAM_AUTH_GROUP | Authorization Group | CHAR | 4 | NU |
| T351P | ZAEHL | PAKETZAEHL | Maintenance Package Number | NUMC | 2 | Mandatory |
| T351P | ZEIEH | DZEIEH | Unit for the performance of maintenance tasks | UNIT | 3 | Mandatory |
| T351P | OFFZT | DZYK_OFFZT | Start offset of a time-based maintenance package | FLTP | 16(16) | Conditional |
| T351P | OFFLS | DZYK_OFFLS | Start offset of a performance-based maintenance package | FLTP | 16(16) | NU |
| T351X | PUFFP | PUFF_VORL | Lead Float in Days | NUMC | 3 | NU |
| T351X | PUFFN | PUFF_NACHL | Follow-up float in days | NUMC | 3 | NU |
| T351X | KTEX1 | TXZYKLUS | Text for maintenance package/cycle (time/performance) | CHAR | 30 | Mandatory |
| T351X | KZYK1 | KTEXTZYK | Short text for the maintenance cycle (time/performance) | CHAR | 2 | Mandatory |
| T351X | KTXHI | KTEXTHIER | Short text of the maintenance package hierarchy | CHAR | 2 | Mandatory |
All data will be constructed using DCT. No cleansing activity is necessary.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
Informal Words ** (to be removed?? Waiting for functional to confirm - MDS review point sent)
Group 1 | Group 2 | Group 3 | Group 4 | Group 5 |
|---|---|---|---|---|
*DNU | Delete | donot | Formerly | Old # |
.. | Deletion | DONT USE | From | Old[ ] |
/ | DELISTED | DON'T USE | Incorrect | PLEASE USE |
? | Discontinued | Dup Use | Invalid | Pls Use |
@ | Disposable | DUPLICATE | New | Previously |
^ | DNU | -DUPLICATE | NOT ACTIVE | Replace |
+ | Do Not | DUPLICATION | not in use | Replaced |
++ | Do Not Re | Duplicidad | Not Used | RESERVED |
£ | Do Not Sell | Duplikat | NOT VALID | Retired |
Defective | Do Not Use | Former | Obsolete | ZZDEL |
All data will be constructed for Maintenance Strategy using DCT.
The high-level process for DCT is represented by the diagram below:

No extraction of legacy data will be done as all data will be constructed.
| Req # | Requirement Description | Team Responsible |
|---|---|---|
Not Applicable |
Selection Screen
If applicable, this section will give the details on any selection screen parameters, including the parameter type, that are required to be entered to ensure consistent data extracts.| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Not Applicable |
Maintenance Strategy DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Maintenance Strategies shall follow the below Mask
XXX = Sequential Number starting 001 |
| KTEXT | Description | Must not be blank |
| ZEIEH | Unit for the performance of maintenance tasks | Must not be blank Must reference active Units of Measurement in config (T006) |
| TOLE1 | Tolerance for Late Completion (%) | Default to 0 unless provided by business |
| TOLE2 | Tolerance for Early Completion (%) | Default to 0 unless provided by business |
| VERS1 | Shift Factor for Late Completion | Default to 0 unless provided by business |
| VERS2 | Shift Factor for Early Completion | Default to 0 unless provided by business |
| TERMK | Scheduling indicator | Must not be blank (MDS review point sent) |
| HORIZ | Call horizon for maintenance plan calls | Default to 100 unless provided by business |
| HORIZ_QUALIFIER | Calculation Type of Call Horizon | Default to "%" |
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Must reference STRAT from Maintenance Strategy |
| ZAEHL | Maintenance Package Number | Must not be blank. Numeric values only. Sequential ascending values only. |
| ZEIEH | Unit for the performance of maintenance tasks | Must not be blank. Must reference active Units of Measurement in config (T006) |
| OFFZT | Start offset of a time-based maintenance package | |
| KTEX1 | Text for maintenance package/cycle (time/performance) | Must not be blank (MDS review point sent) |
| KZYK1 | Short text for the maintenance cycle (time/performance) | Must not be blank (MDS review point sent) |
| KTXHI | Short text of the maintenance package hierarchy | Must not be blank (MDS review point sent) |
No extraction of legacy data will be done as all data will be constructed.
| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
All data will be constructed with the target values. No transformation is required.
The data is maintained in Syniti Data Construction page.
| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
Transformation Rules
All data will be constructed with the target values. No transformation is required.
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| Not Applicable |
List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.
| Mapping Table Name | Mapping Table Description |
|---|---|
| Not Applicable |
| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
| Task | Action |
|---|---|
Verify Record Count | SyWay A2D Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | SyWay A2D Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay A2D Data Team |
| 2 | Syniti will provide load file | Syniti |
| 3 | Go to <Load Tool> | SyWay A2D Data Team/Syniti |
| 4 | Load 3 records for Maintenance Strategy for function (IP11) to validate if data is loaded successfully without errors | SyWay A2D Data Team/Syniti |
| 5 | Proceed with full load if step 4 is validated | SyWay A2D Data Team/Syniti |
| 6 | Validate few records loaded by accessing standard transactions from S/4HNA E.g. IP12 | SyWay A2D Data Team/Syniti |
| 7 | Generate post load report if step 6 is validated | SyWay A2D Data Team/Syniti |
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| 1 | Unit of Measure |
| Object # | Preceding Object Conversion Approach |
|---|---|
| Not Applicable |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
Configuration | Invalid Unit of Measure | Engage Functional team to expedite and fix the error in the system |
Invalid Data | Maintenance Package: Invalid Maintenance Strategy | Check whether the Maintenance Strategy exist in Maintenance Strategy table |
| Task | Action |
|---|---|
Verify Count | SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
| Task | Action |
|---|---|
Conversion Accuracy | SyWay A2D Data Team to verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.