Status

OwnerBIDALIA-ext, Kuldeep 
StakeholdersMOREAU, Patrick
Jira Request ID

Jira Development ID

High- Level Specification

ParameterValue
Application SystemS
Business Process Reference

Functional Overview

The functional design of the enhancements describes the scenario(s) where enhancements to existing SAP programs are required.


Scope and Objectives

In a typical SAP Project, budget control serves as a foundational mechanism to ensure financial discipline across capital and operational projects. When a WBS element surpasses its assigned budget threshold, based on the configured budget tolerance limits system automatically initiates an email notification to the designated Person Responsible for that WBS element.

Since SAP e-mail is old technology and is to be replaced with a Launchpad Notification. Notifications are required to ensure the Project Manager can proactively prevent overspend of the project budget and delays by timely request for supplementary budget approval. This is especially important for capex budgets which are constrained at a GBU level.

Therefore, an enhancement is proposed to deactivate standard email notifications and redirect budget overrun alerts triggered by existing budget control events into the user's "My Inbox" SAP application for streamlined, in-system visibility.


Process Flow Diagram


Insert the flowchart and fill in the steps

Step

Description

Comment

1

Create Project

A capital project in SAP will be generated from a corresponding PPM item and automatically transitioned to released status upon creation.

2

Budget Allocation

  • Upon approval of the Funding Request, budget allocations will be automatically applied to the level-1 and level-2 WBS elements of the project.
  • If needed, the "Edit Original Budget" Fiori app can be used to distribute budget allocations further down to level-3 and level-4 WBS elements within the project structure.
  • The assigned budget profile automatically activates Availability Control (AAVC) as soon as the budget is allocated.
3

Expense Posting

  • Actual costs & commitments will be accumulated in WBS elements against assigned budget.
  • Transactions like PR/PO creation, goods receipt, financial posting, timesheet and service entry affect budget consumption.
4

Availability Control Monitoring

AVAC checks budget consumption against tolerance limits.

  • Tolerance limits of a budget profile are configured in “Define Tolerance Limits”:

Example: 80% = warning, 100% = error notification

5

Budget Threshold Breach

When costs exceed defined thresholds on a WBS element:

  • System triggers warning or error messages
6

Notification Trigger

If budget threshold is breached for a WBS element, then Inbox Notification will be routed to WBS element’s Person Responsible “My Inbox” app with error details (custom enhancement)

7

User Action

Person Responsible reviews notification in “My Inbox” app and take corrective actions.





Assumptions

Person Responsible will be maintained against all account assigned WBS elements of a capex project.

Users must have access to SAP Fiori Launchpad and My Inbox.

Dependencies

Indicate any dependencies or constraints that may impact this development, in terms of requirements from internal or external applications, other work streams, time constraints, data or system access restrictions. Also, please specify scheduling or process dependencies, e.g. interface/batch job that must run beforehand or process steps that need to be completed prior to executing this development.

Security, Integrity and Controls

To detail the security requirements for processing this enhancement, any data integrity issues associated with the object and the teams that will be responsible for processing the object, i.e. authorization/roles required to who can execute the enhancements, etc.

- Custom Tables, enhancement, transaction codes, programs, Web Dynpro Application, Code Data Services (CDS), Open Data Protocol (OData), BI reports, and Functional Modules need to have at least one authority check either standard or custom. (custom should be an exception)

- All custom tables will be maintained in a certain Authorization Group (example: ZFIN, etc.)

- In the case of transaction codes an additional check other than the object S_TCODE is required. You can use SU24 to find the related authorization objects to check.

All other WRICEFs

- If the authorization check is already performed in the calling Programs, this section can be filled as “Follow calling programs authorization check” (example : BADI to redirect DMS to OpenText, in which the calling Manage Purchase requisition Fiori App already performed authorization check)

- If the authorization check is not checked in any of the development, this section should be filled with the proposed authorization check. You can refer to SU24 to see the standard authorization objects. (example: full custom Fiori App to enable user to download/upload the project plan)


Configuration Requirements

The following configurations are pre-requisites for this enhancement:

  1. Budget profile must be configured for availability control activation.
  2. Tolerance Limit must be Configured for the budget profile.
  3. Person Responsible must have SAP User ID assigned against them.

Language Requirements

Specify the language requirements for this object. Specify the required language and type of translation, like labels, data.

Special Requirements

Specify any special requirements or considerations that may impact the enhancement based on specific locations, regulatory compliance or system limitations. Clearly outline requirements e.g. localization rules for countries like China

If the enhancement interacts with third-party systems such as Icertis, describe any additional integration, security or authentication considerations that must be taken into account.


Design Rationale

Functional Requirements

In capital projects managed via SAP PS, budget overruns currently trigger email notifications to the Person Responsible based on tolerance limit settings. To streamline communication and align with SAP Fiori-based notifications, there is requirement of an enhancement that:

  • Suppress or bypass standard email notifications
  • Routes budget overrun alerts to the SAP My Inbox application
  • Leverages existing budget control events without altering core AVAC logic

Proposed Technology to Use

Typically, an enhancement will be based on an existing SAP BADI / user exit. If this is the case, please provide the proposed details of the BADI / user exit.

Data Source Considerations

Include an overview of the source

TableField NameComments/Calculation/Field Manipulation











Data Validation Considerations

Include an overview of the data validation requirement

TableField NameComments/Calculation/Field Manipulation













Custom Tables

If any custom configuration tables are required, which will be read by the enhancement logic, then specify them here.

Master Data

<Title Custom Table 1>

<Include an overview of the table and what it’s used for>

FieldDescriptionData Type/LengthValidation rule/ Value Help









Configuration Table

Title Configuration Table 1

Include an overview of the table and what it’s used for

FieldDescriptionData Type/LengthValidation rule/ Value Help








Selection Screen Enhancement

This section will give the details on the selection screen parameters, parameter type and whether it’s obligatory or not. This section can be used to define the Import Export parameters for Function Module or User Exit or Screens.

Field NameDescription

Select:

Option or Parameter

Check box or Radio button

Import or Export

Data Type/LengthDefault Value/ Validation rule/ Value HelpSelection Logic













Processing Logic

This section defines the detailed step-by-step logic implemented within the BAdI/User Exit to process the data received from the standard SAP program and database retrieval. It explains the operations performed on the data, the expected outcomes in different scenarios and how the system should behave in response to specific conditions.



Volumetrics

Provide volumetrics details: Initial load volumes, Number of Records, Expected Frequency, Expected Long term Growth)


Performance Considerations

Specify if there are any specific performance factors that need to be taken into consideration during development i.e. enhancement must be able to be executed by 10 users at the same time, etc.



Error Handling

Detail how errors will be handled: Notification, Restart/ Recovery and Re-Processing Procedures


Testing

How to Test

Please provide some guidance and/or test data to help the developer unit test the enhancement. Please include both positive and negative testing (to validate error situations handling). The developer will need to test repeatedly, so where appropriate provide instructions to reverse the actions performed so the test may be run again or explain how to create new input data to the test. The developer will need logons for test users representing the various roles within the approval process.

Test Conditions and Expected Results

IDConditionExpected Result
1

Capital project budget exceeded due to Goods Receipt posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

2

Capital project budget exceeded due to Invoice Variation posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

3

Capital project budget exceeded due to Goods issue posting (P2F- plant to project issue)

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

4

Capital project budget exceeded due to Service entry sheet posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

5

Capital project budget exceeded due to financial journal posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

6

Capital project budget exceeded due to WO settlement

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

7

Capital project budget exceeded due to timesheet posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

8

Capital project budget exceeded due to timesheet posting

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

9

Capital project Commitment values (purchase requisition) exceeded budget

System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email

10

Projects without budget, actual cost posting on WBS element

No notification in “My Inbox” and email should be triggered to Person Responsible WBS element


Test Considerations/Dependencies

List any considerations essential for application test planning (e.g., test this before ABC along with DEF separate from GHI). If the development encompasses a user interface, explain how to test it. List any insights as to how this component could be tested the most efficiently.


Other Information


Development Details

Package

Package NameParent Package




Enhancement Implementation

Enhancement TypeStandard Definition NameCustom Implementation NameDesign Rationale Reference









Other Development Objects

Object TypeObject NamePurpose/High Level LogicDesign Rationale Reference








Appendix

Custom Authorization Group Naming Convention

This table is based on the Syensqo development standards document. It provides the naming conventions for authorization groups to associated with custom reports and tables to comply with security requirements.

ABAP

ZFIZMMZPSZCOZSDZBCZFIZCA
TABLESZFITZMMTZPSTZCOTZSDTZBCTZFITZCAT

See also

Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.


Change log