In a typical SAP Project, budget control serves as a foundational mechanism to ensure financial discipline across capital and operational projects. When a WBS element surpasses its assigned budget threshold, based on the configured budget tolerance limits system automatically initiates an email notification to the designated Person Responsible for that WBS element.
Since SAP e-mail is old technology and is to be replaced with a Launchpad Notification. Notifications are required to ensure the Project Manager can proactively prevent overspend of the project budget and delays by timely request for supplementary budget approval. This is especially important for capex budgets which are constrained at a GBU level.
Scope and Objectives
Scope: This enhancement aims to proactively notify users of budget overruns by identifying WBS elements with insufficient budget and delivering alerts directly to their SAP "My Inbox" application. This enhancement will be applicable to all budget-controlled projects i.e. projects with project profile ZPS0001.
Objective: The key objectives of implementing this enhancement are:
Enhanced Visibility: Notifications appear directly in the Fiori Launchpad (bell icon), where users already perform daily tasks. It reduces reliance on external email systems and avoids missed alerts.
Real-Time Action: Speeds up response time to budget breaches, improving governance and control.
Scalability & Futureproofing: Easier to extend with push notifications to mobile devices.
N/A
Insert the flowchart and fill in the steps
Step | Description | Comment |
|---|---|---|
| 1 | Create Project | A capital project in SAP will be generated from a corresponding PPM item and automatically transitioned to released status upon creation. |
| 2 | Budget Allocation |
|
| 3 | Expense Posting |
|
| 4 | Availability Control Monitoring | AVAC checks budget consumption against tolerance limits.
Example: 90% = warning, 110% = error notification |
| 5 | Budget Threshold Breach | When costs exceed defined thresholds on a WBS element:
|
| 6 | Notification Trigger | When a WBS element exceeds its budget threshold and attains the system status ISBD (Insufficient Budget). For active WBS elements with status ISBD a batch job triggers custom notification routed to the “My Inbox” application of the user maintained in Person Responsible Position ID, detailing the budget overrun. |
| 7 | User Action | Person Responsible reviews notification in “My Inbox” app and take corrective actions. |
Assumptions
It is assumed that CAPEX project will be budgeted, and availability control status will be active.
The WBS element must possess appropriate system status and user statuses to enable financial postings.
Monitoring and tracking of all budget overrun events should enable notification status checks (success or failure) and the ability to resend notifications if needed.
Person Responsible will be maintained against all account assigned WBS elements of a capex project.
Users must have access to SAP Fiori Launchpad and My Inbox.
Effective monitoring and traceability of SAP Fiori budget notifications must be ensured for compliance standards and facilitate audit preparedness.
Configuration Requirements
The following configurations are pre-requisites for this enhancement:
N/A
N/A
In capital projects managed via SAP PS, budget overruns currently trigger email notifications to the Person Responsible based on tolerance limit settings. To streamline communication and align with SAP Fiori-based notifications, there is requirement of an enhancement that:
Message No. BP603 – “Item & budget exceeded” is triggered in when a transaction attempts to post costs or commitments that exceed the available budget for a specific WBS element. Enhancement can be triggered by identifying the budget threshold exceed event to trigger a launchpad notification.
Scenarios that can trigger error BP603-
Typically, an enhancement will be based on an existing SAP BADI / user exit. If this is the case, please provide the proposed details of the BADI / user exit.
Include an overview of the source
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
Include an overview of the data validation requirement
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
If any custom configuration tables are required, which will be read by the enhancement logic, then specify them here.
<Title Custom Table 1>
<Include an overview of the table and what it’s used for>
| Field | Description | Data Type/Length | Validation rule/ Value Help |
|---|---|---|---|
Title Configuration Table 1
Include an overview of the table and what it’s used for
| Field | Description | Data Type/Length | Validation rule/ Value Help |
|---|---|---|---|
This section will give the details on the selection screen parameters, parameter type and whether it’s obligatory or not. This section can be used to define the Import Export parameters for Function Module or User Exit or Screens.
| Field Name | Description | Select: Option or Parameter Check box or Radio button Import or Export | Data Type/Length | Default Value/ Validation rule/ Value Help | Selection Logic |
|---|---|---|---|---|---|
This section defines the detailed step-by-step logic implemented within the BAdI/User Exit to process the data received from the standard SAP program and database retrieval. It explains the operations performed on the data, the expected outcomes in different scenarios and how the system should behave in response to specific conditions.
Provide volumetrics details: Initial load volumes, Number of Records, Expected Frequency, Expected Long term Growth)
N/A
Detail how errors will be handled: Notification, Restart/ Recovery and Re-Processing Procedures
To validate this enhancement, a project will be initialized in Released status, comprising several level-3 WBS elements, each account-assigned and allocated a budget of 1 Euro. Person Responsible must be assigned on each level 3 WBS elements, ensure that the Person Responsible is assigned an SAP Office user ID via transaction code OPS6, ideally using the tester’s own user ID. Availability Control will be activated to monitor budget consumption and trigger system responses accordingly.
Proceed with the following test conditions, ensuring that each WBS element is used for a distinct type of posting.
Test Conditions and Expected Results
| ID | Condition | Expected Result |
|---|---|---|
| 1 | Capital project budget exceeded due to Goods Receipt posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 2 | Capital project budget exceeded due to Invoice Variation posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 3 | Capital project budget exceeded due to Goods issue posting (P2F- plant to project issue) | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 4 | Capital project budget exceeded due to Service entry sheet posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 5 | Capital project budget exceeded due to financial journal posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 6 | Capital project budget exceeded due to WO settlement | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 7 | Capital project budget exceeded due to timesheet posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 8 | Capital project budget exceeded due to timesheet posting | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 9 | Capital project Commitment values (purchase requisition) exceeded budget | System issues error notification to Person Responsible in “My Inbox” depending on tolerance limits, not via email |
| 10 | Projects without budget, actual cost posting on WBS element | No notification in “My Inbox” and email should be triggered to Person Responsible WBS element |
Test Considerations/Dependencies
For testing purposes, define few Person Responsible entries by assigning the tester’s own SAP user ID in the SAP Office User ID field using transaction code OPS6. This ensures that system-generated notifications for budget overrun are correctly routed to the tester during execution and validation.
| Package Name | Parent Package |
|---|---|
| Enhancement Type | Standard Definition Name | Custom Implementation Name | Design Rationale Reference |
|---|---|---|---|
| Object Type | Object Name | Purpose/High Level Logic | Design Rationale Reference |
|---|---|---|---|
This table is based on the Syensqo development standards document. It provides the naming conventions for authorization groups to associated with custom reports and tables to comply with security requirements.
ABAP | ZFI | ZMM | ZPS | ZCO | ZSD | ZBC | ZFI | ZCA |
|---|---|---|---|---|---|---|---|---|
| TABLES | ZFIT | ZMMT | ZPST | ZCOT | ZSDT | ZBCT | ZFIT | ZCAT |
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.