The purpose of this document is to define the conversion approach to create 1056 - Resources in S/4 HANA.
Resources are used to identify the production lines, equipment and all the machines related to the production execution process. Resources are the main data to be used to design the Master Recipes for all the Syensqo plants.
The scope of this document covers the approach for converting active 1056- Resources from Legacy Source Systems into S/4HANA following the Resource Master Data Design Standard.
Stand alone rules
The data from legacy system includes:
The data from legacy system excludes:
Relevancy rule
Material Plant Active with three years Process order History
defines Active BOMS by Plant
defines Active Master Recipe by Plant
Defines the Resource by Plant.
Plant Merging
Plants will be defined accordingly as some plants will be merged into one plant. Plants will be defined as NEW plant codes and be transformed via a transformation table, which will be contained in Syniti.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2, WP2 | Resources will be extracted from PF2 and WP2 | PF2 - 6096 WP2 - 9077 | S/4 HANA | PF2 - 6096 WP2 - 9077 |
| DCT | Resources for Plant / Resources combination which do not have data existing from PF2 and WP2 | S/4 HANA |
English , French, Chinese, Spanish
Summarize Document Management requirement, if any
N/A
N/a
N/a
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement | MDS Field Mapping in Scope | Field Value in MDS | |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CRHD | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | In Scope | |
| 2 | CRHD | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 3 | CRHD | ARBPL | ARBPL | Work Center | CHAR | 8 | R | TBD | |
| 4 | CRHD | WERKS | WERKS_D | Plant | CHAR | 4 | R | TBD | |
| 5 | CRHD | VERWE | AP_VERWE | Work Center Category | CHAR | 4 | R | 0008 Processing Unit | |
| 6 | CRHD | PLANV | AP_PLANV | Key for task list usage | CHAR | 3 | R | 0008 Master Recipe + Process Order | |
| 7 | CRHD | STAND | AP_STAND | Work center location | CHAR | 10 | C | MFG Execution Config Register | |
| 8 | CRHD | VERAN | AP_VERAN | Person Responsible for the Work Center | CHAR | 3 | C | MFG Execution Config Register | |
| 9 | CRHD | VGWTS | VORGSCHL | Standard Value Key | CHAR | 4 | R | TBD | |
| 10 | CRHD | VGM01 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 11 | CRHD | VGM02 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 12 | CRHD | VGM03 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 13 | CRHD | VGM04 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | In Scope | |
| 14 | CRHD | VGM05 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 15 | CRHD | VGM06 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 16 | CRHD | ZGR01 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 17 | CRHD | ZGR02 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 18 | CRHD | ZGR03 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 19 | CRHD | ZGR04 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 20 | CRHD | ZGR05 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 21 | CRHD | ZGR06 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 22 | CRHD | PRVBE | PRVBE | Production Supply Area | CHAR | 10 | C | ||
| 23 | CRHD | RGEKZ | RGEKZAP | Indicator: Backflushing | CHAR | 1 | C | ||
| 24 | CRHD | STEUS | STEUS | Control Key | CHAR | 4 | R | ||
| 25 | CRHD | VGE01 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 26 | CRHD | VGE02 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 27 | CRHD | VGE03 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 28 | CRHD | VGE04 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 29 | CRHD | VGE05 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 30 | CRHD | VGE06 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 31 | CRHD | KAPAR | KAPART | Capacity category | CHAR | 3 | R | ||
| 32 | CRHD | KAPNAME | KAPNAME | Capacity name | CHAR | 8 | R | ||
| 33 | CRHD | FORT1 | AP_FORM_T1 | Formula for setup time | CHAR | 6 | NU | TBD | |
| 34 | CRHD | FORT2 | AP_FORM_T2 | Formula for the duration of processing time | CHAR | 6 | NU | TBD | |
| 35 | CRHD | FORT3 | AP_FORM_T3 | Formula for teardown time | CHAR | 6 | NU | TBD | |
| 36 | CRHD | FORTN | AP_FORM_TN | Formula for the duration of other types of int. processing | CHAR | 6 | NU | TBD | |
| 37 | CRTX | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 38 | CRTX | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 39 | CRTX | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 40 | CRTX | KTEXT | CR_KTEXT | Short description | CHAR | 40 | R | ||
| 41 | CRCA | OBJTY | CR_OBJTY | Object Type | CHAR | 2 | S | ||
| 42 | CRCA | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 43 | CRCA | CANUM | CR_CAPNUM | Capacity allocation number | CHAR | 6 | S | TBD | |
| 44 | CRCA | FORK1 | AP_FORM_K1 | Formula for Setup Capacity Requirements | CHAR | 6 | NU | ||
| 45 | CRCA | FORK2 | AP_FORM_K2 | Formula for Processing Capacity Requirements | CHAR | 6 | NU | ||
| 46 | CRCA | FORK3 | AP_FORM_K3 | Formula for Teardown Capacity Requirements | CHAR | 6 | NU | ||
| 47 | CRCA | FORKN | AP_FORM_KN | Formula for Other Capacity Requirements | CHAR | 6 | NU | ||
| 48 | CRCA | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 49 | KAKT | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 50 | KAKT | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 51 | KAKT | KTEXT | CR_KTEXT | Capacity Text | CHAR | 40 | R | ||
| 52 | CRCO | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 53 | CRCO | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 54 | CRCO | LASET | #N/A | Activity Type Set | CHAR | 6 | S | ||
| 55 | CRCO | ENDDA | ENDDATUM | End Date | DATS | 8 | R | 31/12/9999 | |
| 56 | CRCO | BEGDA | BEGDATUM | Start Date | DATS | 8 | R | ||
| 57 | CRCO | KOKRS | KOKRS | CO Area | CHAR | 4 | R | ||
| 58 | CRCO | KOSTL | KOSTL | Cost Center | CHAR | 10 | R | ||
| 59 | CRCO | LSTAR1 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 60 | CRCO | LEINH1 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 61 | CRCO | FORML1 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 62 | CRCO | LSTAR2 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 63 | CRCO | LEINH2 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 64 | CRCO | FORML2 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 65 | CRCO | LSTAR3 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 66 | CRCO | LEINH3 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 67 | CRCO | FORML3 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 68 | CRCO | LSTAR4 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 69 | CRCO | LEINH4 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 70 | CRCO | FORML4 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 71 | CRCO | LSTAR5 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 72 | CRCO | LEINH5 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 73 | CRCO | FORML5 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 74 | CRCO | LSTAR6 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 75 | CRCO | LEINH6 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 76 | CRCO | FORML6 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 77 | KAKO | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 78 | KAKO | AZMAX | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | NU | ||
| 79 | KAKO | AZNOR | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | R | ||
| 80 | KAKO | BASNE | KAPBASNEN | Denominator base cap | DEC | 5 | S | ||
| 81 | KAKO | BASZL | KAPBASZHL | Numerator base cap. | DEC | 5 | S | ||
| 82 | KAKO | BEGZT | KAPBEGZT | Start Time | INT4 | 10 | R | ||
| 83 | KAKO | ENDZT | KAPENDZT | End Time | INT4 | 10 | R | ||
| 84 | KAKO | KALID | CR_WFCID | Factory Calendar | CHAR | 2 | C | ||
| 85 | KAKO | KAPAR | KAPART | Capacity category | CHAR | 3 | R | ||
| 86 | KAKO | MEINS | KAPBASIS | Capacity Base Unit | UNIT | 3 | R | ||
| 87 | KAKO | MOSID | SCHGRUP | Shift Grouping | CHAR | 2 | C | ||
| 88 | KAKO | NAME | KAPNAME | Capacity | CHAR | 8 | NU | ||
| 89 | KAKO | NGRAD | NUTZGRAD | Capacity Utilization | NUMC | 3 | R | ||
| 90 | KAKO | PAUSE | KAPPAUSE | Break Duration | INT4 | 10 | R | ||
| 91 | KAKO | PLANR | KAPPLANER | Capacity Responsible Planner | CHAR | 3 | R | ||
| 92 | KAKO | POOLK | KAP_KZPOOL | Pooled Capacity Indicator | CHAR | 1 | C | ||
| 93 | KAKO | REFAN | KAPREFANZN | Number (ref. cap.) | INT1 | 3 | C | ||
| 94 | KAKO | REFAZ | KAPREFANZZ | Number (capacity) | INT1 | 3 | C | ||
| 95 | KAKO | REFID | KAPID | Capacity ID | NUMC | 8 | C | ||
| 96 | KAKO | SUPPK | KAP_SUPPLY | Avail. cap. limits | CHAR | 1 | C (if not entered, 100% will be the default) | ||
| 97 | KAKO | VERSA | KAPVERSAKT | Active Version | NUMC | 2 | R | ||
| 98 | KAKO | WERKS | WERKS_D | Plant | CHAR | 4 | NU | ||
| 99 | KAKO | KAPIE | KAPID | Capacity ID | NUMC | 8 | NU | ||
| 100 | KAKO | KAPTER | KAP_KZTER | Relevant to Finite Scheduling | CHAR | 1 | C | ||
| 101 | KAKO | KAPAVO | KAP_KZAVO | Can be used by several operations | CHAR | 1 | C | ||
| 102 | KAKO | UEBERLAST | UEBERLAST | Overload (%) | NUMC | 3 | C | ||
| 103 | KAKO | KAPLPL | KAP_KZLPL | No Long-Term Planning | CHAR | 1 | C | ||
| 104 | KAKO | KAPEH | CR_KAPEH | Capacity Unit | UNIT | 3 | C (if PP/DS is used) | ||
| 105 | KAKO | MEHR | KAP_MEHR | Has Individual Capacities | CHAR | 1 | C (if PP/DS is used) | ||
| 106 | KAKO | ANG_UNIT | KAPAZIT_VM_UNIT | Av. cap. unit | UNIT | 3 | C (if PP/DS is used) | ||
| 107 | KAKO | ANG_MIN | KAPAZIT_VM_MIN | Minimum capacity | QUAN | 13 | C (if PP/DS is used) | ||
| 108 | KAKO | ANG_MAX | KAPAZIT_VM_MAX | Max. capacity | QUAN | 13 | C (if PP/DS is used) |
Business will perform data cleansing in the current ECC system. This means ECC will serve as the single source of truth for Manufacturing Data prior to the migration to S/4HANA.
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 1056-1 | C1 | Resource is not used for the last 3 years | All Resources not used for the last 3 years, won't be migrated | Active Resources during the last 3 years | PF2 /WP2 |
| 1056-2 | C1 | Resource is flagged for deletion | All Resources flagged for deletion won't be migrated | Resources with NO flag for deletion | PF2/WP2 |
| 1056-3 | C1 | Resources in Plants that are Out of Scope | Resources created in Plants Out of Scope won't be migrated | Resources valid in Active plants (To Be mapping) | PF2/WP2 |
| 1056-4 | C1 | Resources with No formulas for capacity, scheduling or costing | Resources with missing capacity, Scheduling and costing formulas won't be migrated | Only Resources with all formulas will be migrated | PF2/WP2 |
The high-level process is represented by the diagram below:

Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
| 2 | Google Sheet/ MS Excel/ SQL report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
| 3 | Sinity will extract data and convert it into SQL data base ad share with the team | Sinity team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
Field Name | Field description | Rule |
Not required all data Will be from the source system |
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Source System Availability
| Syensqo IT |
| 2 | Data Structure
| Syniti |
| 3 | Referential Integrity
| Syniti |
| 4 | Extraction Methodology
| Syniti |
| 5 | Performance and Scalability Considerations
| Syniti |
| 6 | Security and Compliance
| Syniti |
| 7 | Data cleansing of legacy Resource - If standardization within the DCT begins using relevant data from PF2 and WP2 before the cleansing is finalized, it is understood that the business will take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT. | Business |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay Data Team |
| 2 | <Add steps from Syniti Migrate here> | SyWay Data Team |
| 3 | Review and Validate Error and Preload Reports | SyWay Data Team |
| 4 | Generate Load Files | SyWay Data Team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WP2 | CRHD | OBJTY | Object type | S4 HANA | CRHD | OBJTY | Object type | System Generated Field |
| 2 | PF2/WP2 | CRHD | OBJID | Object ID | S4 HANA | CRHD | OBJID | Object ID | System Generated Field |
| 3 | PF2/WP2 | CRHD | ARBPL | Resource ID | S4 HANA | CRHD | ARBPL | Resource ID | Look at the file Resources equivalent for Plant - Resource Name as Existing Plant-New Plant mapping Check Resource name. |
| 4 | PF2/WP2 | CRHD | WERKS | Plant | S4 HANA | CRHD | WERKS | Plant | Map from Old Plants to New Plants |
| 5 | PF2/WP2 | CRHD | VERWE | Work Center Category | S4 HANA | CHRD | VERWE | Work Center Category | VALUE 0008 |
| 6 | PF2/WP2 | CRHD | PLANV | Key for task list usage | S4 HANA | CHRD | PLANV | Key for task list usage | Value Direct from the current system |
| 7 | PF2/WP2 | CRHD | STAND | Work center location | S4 HANA | CHRD | STAND | Work center location | Value set based upon MFG Execution Config Register C : Business Rule |
| 8 | PF2/WP2 | CRHD | VERAN | Person Responsible for the Work Center | S4 HANA | CHRD | VERAN | Person Responsible for the Work Center | Value set based upon MFG Execution Config Register C : Business Rule |
| 9 | PF2/WP2 | CRHD | VGWTS | Standard Value Key | S4 HANA | CHRD | VGWTS | Standard Value Key | TBD - STD Value Key maybe part of transformation and mapping |
| 10 | PF2/WP2 | CRHD | VGM01 | Rule for standard value maintenance | S4 HANA | CHRD | VGM01 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 11 | PF2/WP2 | CRHD | VGM02 | Rule for standard value maintenance | S4 HANA | CHRD | VGM02 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 12 | PF2/WP2 | CRHD | VGM03 | Rule for standard value maintenance | S4 HANA | CHRD | VGM03 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 13 | PF2/WP2 | CRHD | VGM04 | Rule for standard value maintenance | S4 HANA | CHRD | VGM04 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 14 | PF2/WP2 | CRHD | VGM05 | Rule for standard value maintenance | S4 HANA | CHRD | VGM05 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 15 | PF2/WP2 | CRHD | VGM06 | Rule for standard value maintenance | S4 HANA | CHRD | VGM06 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 16 | PF2/WP2 | CRHD | PRVBE | Production Supply Area | S4 HANA | CHRD | PRVBE | Production Supply Area | Business Rule If the WC always gets its raw materials staged to a fixed area / integration with WM to determine destination bin |
| 17 | PF2/WP2 | CRHD | RGEKZ | Indicator: Backflushing | S4 HANA | CHRD | RGEKZ | Indicator: Backflushing | Business Rule If all components used at a machine/line should be automatically issued at confirmation |
| 18 | PF2/WP2 | CRHD | STEUS | Control Key | S4 HANA | CHRD | STEUS | Control Key | Mandatory Direct from the current system |
| 19 | PF2/WP2 | CRHD | VGE01 | Unit of measure for the standard value | S4 HANA | CHRD | VGE01 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 20 | PF2/WP2 | CRHD | VGE02 | Unit of measure for the standard value | S4 HANA | CHRD | VGE02 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 21 | PF2/WP2 | CRHD | VGE03 | Unit of measure for the standard value | S4 HANA | CHRD | VGE03 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 22 | PF2/WP2 | CRHD | VGE04 | Unit of measure for the standard value | S4 HANA | CHRD | VGE04 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 23 | PF2/WP2 | CRHD | VGE05 | Unit of measure for the standard value | S4 HANA | CHRD | VGE05 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 24 | PF2/WP2 | CRHD | VGE06 | Unit of measure for the standard value | S4 HANA | CHRD | VGE06 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 25 | PF2/WP2 | CRHD | KAPART | Capacity category | S4 HANA | CHRD | KAPART | Capacity category | Value Direct from the current system |
| 26 | PF2/WP2 | CRHD | KAPNAME | Capacity name | S4 HANA | CHRD | KAPNAME | Capacity name | Value Direct from the current system |
| 27 | PF2/WP2 | CRHD | FORT1 | Formula for setup time | S4 HANA | CHRD | FORT1 | Formula for setup time | Registered as Not used, but this is to be decided, current SAP has values |
| 28 | PF2/WP2 | CRHD | FORT2 | Formula for the duration of processing time | S4 HANA | CHRD | FORT2 | Formula for the duration of processing time | Registered as Not used, but this is to be decided, current SAP has values |
| 29 | PF2/WP2 | CRHD | FORT3 | Formula for teardown time | S4 HANA | CHRD | FORT3 | Formula for teardown time | Registered as Not used, but this is to be decided, current SAP has values |
| 30 | PF2/WP2 | CRHD | FORTN | Formula for the duration of other types of int. processing | S4 HANA | CHRD | FORTN | Formula for the duration of other types of int. processing | Registered as Not used, but this is to be decided, current SAP has values |
| 31 | PF2/WP2 | CRTX | OBJTY | Object type | S4 HANA | CRTX | OBJTY | Object type | System Generated Field |
| 32 | PF2/WP2 | CRTX | OBJID | Object ID | S4 HANA | CRTX | OBJID | Object ID | System Generated Field |
| 33 | PF2/WP2 | CRTX | SPRAS | Language | S4 HANA | CRTX | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Resource is maintained) |
| 34 | PF2/WP2 | CRTX | KTEXT | Short description | S4 HANA | CRTX | KTEXT | Short description | Value direct from current SAP system, free text field, brief description of the Resource SPRAS Language |
| 35 | PF2/WP2 | CRCA | OBJTY | Object Type | S4 HANA | CRCA | OBJTY | Object Type | System Generated Field |
| 36 | PF2/WP2 | CRCA | OBJID | Object ID | S4 HANA | CRCA | OBJID | Object ID | System Generated Field |
| 37 | PF2/WP2 | CRCA | CANUM | Capacity allocation number | S4 HANA | CRCA | CANUM | Capacity allocation number | System Generated Field, The data value is TBD |
| 38 | PF2/WP2 | CRCA | KAPID | Capacity ID | S4 HANA | CRCA | KAPID | Capacity ID | System Generated Field |
| 39 | PF2/WP2 | KAKT | KAPID | Capacity ID | S4 HANA | KAKT | KAPID | Capacity ID | System Generated Field |
| 40 | PF2/WP2 | KAKT | SPRAS | Language | S4 HANA | KAKT | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Capacity is maintained) |
| 41 | PF2/WP2 | KAKT | KTEXT | Capacity Text | S4 HANA | KAKT | KTEXT | Capacity Text | Value direct from current SAP system, free text field, brief description of the Capacity SPRAS Language |
| 42 | PF2/WP2 | CRCO | OBJTY | Object type | S4 HANA | CRCO | OBJTY | Object type | System Generated Field |
| 43 | PF2/WP2 | CRCO | OBJID | Object ID | S4 HANA | CRCO | OBJID | Object ID | System Generated Field |
| 44 | PF2/WP2 | CRCO | LASET | Activity Type Set | S4 HANA | CRCO | LASET | Activity Type Set | System Generated Field |
| 45 | PF2/WP2 | CRCO | ENDDA | End Date | S4 HANA | CRCO | ENDDA | End Date | End date has value set to 31/12/9999 |
| 46 | PF2/WP2 | CRCO | BEGDA | Start Date | S4 HANA | CRCO | BEGDA | Start Date | Date value setting DD.MM.YYYY |
| 47 | PF2/WP2 | CRCO | KOKRS | CO Area | S4 HANA | CRCO | KOKRS | CO Area | Mandatory Value direct from current SAP system |
| 48 | PF2/WP2 | CRCO | KOSTL | Cost Center | S4 HANA | CRCO | KOSTL | Cost Center | Mandatory Value direct from current SAP system |
| 49 | PF2/WP2 | CRCO | LSTAR1 | Activity Type | S4 HANA | CRCO | LSTAR1 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 50 | PF2/WP2 | CRCO | LEINH1 | Activity Unit | S4 HANA | CRCO | LEINH1 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 51 | PF2/WP2 | CRCO | FORML1 | Formula key for costing | S4 HANA | CRCO | FORML1 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 52 | PF2/WP2 | CRCO | LSTAR2 | Activity Type | S4 HANA | CRCO | LSTAR2 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 53 | PF2/WP2 | CRCO | LEINH2 | Activity Unit | S4 HANA | CRCO | LEINH2 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 54 | PF2/WP2 | CRCO | FORML2 | Formula key for costing | S4 HANA | CRCO | FORML2 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 55 | PF2/WP2 | CRCO | LSTAR3 | Activity Type | S4 HANA | CRCO | LSTAR3 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 56 | PF2/WP2 | CRCO | LEINH3 | Activity Unit | S4 HANA | CRCO | LEINH3 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 57 | PF2/WP2 | CRCO | FORML3 | Formula key for costing | S4 HANA | CRCO | FORML3 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 58 | PF2/WP2 | CRCO | LSTAR4 | Activity Type | S4 HANA | CRCO | LSTAR4 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 59 | PF2/WP2 | CRCO | LEINH4 | Activity Unit | S4 HANA | CRCO | LEINH4 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 60 | PF2/WP2 | CRCO | FORML4 | Formula key for costing | S4 HANA | CRCO | FORML4 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 61 | PF2/WP2 | CRCO | LSTAR5 | Activity Type | S4 HANA | CRCO | LSTAR5 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 62 | PF2/WP2 | CRCO | LEINH5 | Activity Unit | S4 HANA | CRCO | LEINH5 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 63 | PF2/WP2 | CRCO | FORML5 | Formula key for costing | S4 HANA | CRCO | FORML5 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 64 | PF2/WP2 | CRCO | LSTAR6 | Activity Type | S4 HANA | CRCO | LSTAR6 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 65 | PF2/WP2 | CRCO | LEINH6 | Activity Unit | S4 HANA | CRCO | LEINH6 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 66 | PF2/WP2 | CRCO | FORML6 | Formula key for costing | S4 HANA | CRCO | FORML6 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 67 | PF2/WP2 | KAKO | KAPID | Capacity ID | S4 HANA | KAKO | KAPID | Capacity ID | System Generated |
| 68 | PF2/WP2 | KAKO | AZNOR | No. Ind. Capacities | S4 HANA | KAKO | AZNOR | No. Ind. Capacities | Copy From ECC |
69 | PF2/WP2 | KAKO | BASNE | Denominator base cap | S4 HANA | KAKO | BASNE | Denominator base cap | System Generated |
| 70 | PF2/WP2 | KAKO | BASZL | Numerator base cap. | S4 HANA | KAKO | BASZL | Numerator base cap. | System Generated |
| 71 | PF2/WP2 | KAKO | BEGZT | Start Time | S4 HANA | KAKO | BEGZT | Start Time | Copy From ECC |
| 72 | PF2/WP2 | KAKO | ENDZT | End Time | S4 HANA | KAKO | ENDZT | End Time | Copy From ECC |
| 73 | PF2/WP2 | KAKO | KALID | Factory Calendar | S4 HANA | KAKO | KALID | Factory Calendar | Conditional : Business Rule Assign the correct Factory Calendar to the resource. If left blank, the system will use directly the plant factory calendar by default The calendar used is the one assigned to the plant or it's a calendar defined in the same country |
| 74 | PF2/WP2 | KAKO | KAPAR | Capacity category | S4 HANA | KAKO | KAPAR | Capacity category | Copy From ECC |
| 75 | PF2/WP2 | KAKO | MEINS | Capacity Base Unit | S4 HANA | KAKO | MEINS | Capacity Base Unit | Copy From ECC |
| 76 | PF2/WP2 | KAKO | MOSID | Shift Grouping | S4 HANA | KAKO | MOSID | Shift Grouping | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 77 | PF2/WP2 | KAKO | NGRAD | Capacity Utilization | S4 HANA | KAKO | NGRAD | Capacity Utilization | Copy From ECC |
| 78 | PF2/WP2 | KAKO | PAUSE | Break Duration | S4 HANA | KAKO | PAUSE | Break Duration | Copy From ECC |
| 79 | PF2/WP2 | KAKO | PLANR | Capacity Responsible Planner | S4 HANA | KAKO | PLANR | Capacity Responsible Planner | Copy From ECC |
| 80 | PF2/WP2 | KAKO | POOLK | Pooled Capacity Indicator | S4 HANA | KAKO | POOLK | Pooled Capacity Indicator | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 81 | PF2/WP2 | KAKO | REFAN | Number (ref. cap.) | S4 HANA | KAKO | REFAN | Number (ref. cap.) | Conditional: This is used in case the user will be using a reference capacity to create a new one |
| 82 | PF2/WP2 | KAKO | REFAZ | Number (capacity) | S4 HANA | KAKO | REFAZ | Number (capacity) | Conditional: This is used in case the user will be using a reference capacity to create a new one |
| 83 | PF2/WP2 | KAKO | REFID | Capacity ID | S4 HANA | KAKO | REFID | Capacity ID | Conditional: This is used in case the user will be using a reference capacity to create a new one |
| 84 | PF2/WP2 | KAKO | SUPPK | Avail. cap. limits | S4 HANA | KAKO | SUPPK | Avail. cap. limits | Conditional: Business Rule If not entered 100% capacity will be used by default in the system |
| 85 | PF2/WP2 | KAKO | VERSA | Active Version | S4 HANA | KAKO | VERSA | Active Version | Copy From ECC |
| 86 | PF2/WP2 | KAKO | KAPTER | Relevant to Finite Scheduling | S4 HANA | KAKO | KAPTER | Relevant to Finite Scheduling | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 87 | PF2/WP2 | KAKO | KAPAVO | Can be used by several operations | S4 HANA | KAKO | KAPAVO | Can be used by several operations | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 88 | PF2/WP2 | KAKO | UEBERLAST | Overload (%) | S4 HANA | KAKO | UEBERLAST | Overload (%) | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 89 | PF2/WP2 | KAKO | KAPLPL | No Long-Term Planning | S4 HANA | KAKO | KAPLPL | No Long-Term Planning | Conditional: Business rule TBD, this will be discussed in the deliverable review session |
| 90 | PF2/WP2 | KAKO | KAPEH | Capacity Unit | S4 HANA | KAKO | KAPEH | Capacity Unit | Conditional: Should be entered in case PP/DS is used |
| 91 | PF2/WP2 | KAKO | MEHR | Has Individual Capacities | S4 HANA | KAKO | MEHR | Has Individual Capacities | Conditional: Should be entered in case PP/DS is used |
| 92 | PF2/WP2 | KAKO | ANG_UNIT | Av. cap. unit | S4 HANA | KAKO | ANG_UNIT | Av. cap. unit | Conditional: Should be entered in case PP/DS is used |
| 93 | PF2/WP2 | KAKO | ANG_MIN | Minimum capacity | S4 HANA | KAKO | ANG_MIN | Minimum capacity | Conditional: Should be entered in case PP/DS is used |
| 94 | PF2/WP2 | KAKO | ANG_MAX | Max. capacity | S4 HANA | KAKO | ANG_MAX | Max. capacity | Conditional: Should be entered in case PP/DS is used |
| Mapping Table Name | Mapping Table Description |
|---|---|
| Work Centre | Mapping of legacy Work Center to new Work Centers to target system value |
| Plant | Mapping of legacy Plants to new Plants to target system value |
| Standard Value Key | Mapping of legacy Standard Value Key to new Standard Value Key to target system value |
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Ensure DCT tables completeness | SyWay Data Team |
2 | Value Mappings are according to the latest design - <List of Value Mappings> | SyWay Data Team |
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
| Conversion Accuracy | SyWay Data Team to verify that all fields below meet pass the checks:
|
| Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
| Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Go to <Load Tool> | SyWay Data Team |
| 2 | Load 3 records for < > to validate if data is loaded successfully without errors | SyWay Data Team |
| 3 | Proceed with full load if steps 2 and 3 are validated | SyWay Data Team |
| 4 | Validate few records loaded by accessing standard transactions from S/4HNA eg. CS04 | SyWay Data Team |
| 5 | Generate post load report if step 5 is validated | SyWay Data Team |
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| 1 | T001W-Plants/Branches |
| 2 | TC30-Work Centre Category |
| 3 | TC23-Key for use of the work center in the task lists |
| 4 | T499S-Work Centre Location |
| 5 | TC24-Person responsible for the work center |
| 6 | TC21-Standard Value Key |
| 7 | PVKT-Production Supply Area |
| 8 | T430-Control Key |
| 9 | T006-Units of Measurement |
| 10 | TC26-Capacity Category |
| 11 | TKA01-Controlling Areas |
| 12 | OP54-Formula key for costing |
| 13 | TFACD-Factory Calendar |
| 14 | TC39A-Shifting Group |
| 15 | TC27-Capacity Responsible Planner |
| 16 | TC36-Active Version |
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1071 | Activity Type |
| 1074 | Cost Centre |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| 1 | Work Centre has not been created in a Plant | Ensure the Work centre mapping is correct and or create the Work centre if it is valid |
| 2 | Mapping conversion errors with new data | Ensure the collection file includes any new data values and mapping is correct |
| Task | Action |
|---|---|
| Verify Count | SyWay S2P Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
| Task | Action |
|---|---|
| Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
| Task | Action |
|---|---|
| Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
| Task | Action |
|---|---|
| Conversion Accuracy | Verify that the Resource data in target S/4 HANA were loaded correctly via DSP Migrate post load reports or standard reports from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.