Purpose

The purpose of this document is to define the conversion approach to create Maintenance Plan and Item in S/4 HANA.

Legacy Maintenance Plan and Item is using a diverse range of formats across the different systems. There are instances where the same Maintenance Plan and Item is duplicated within and across sources, with informal words. This results in data inconsistency. As per SyWay design, EAM Maintenance Plan and Item will be standardized.



Conversion Scope

The scope of this document covers the approach for converting active Maintenance Plan and Item from Legacy Source Systems into S/4HANA following the Maintenance Plan and Item Master Data Design Standard.

Maintenance Plan from legacy system is relevant if:

  1. have at least 1 valid maintenance Item

Maintenance Plan from legacy system is not relevant if:

  1. Maintenance plan marked for deletion

Maintenance Item within each maintenance plan is considered relevant if:

  1. It has at least 1 relevant material, FL or Equipment in ref object or item in object list based on material, FL and Equipment relevancy
  2. At least 1 valid task list based on task list relevancy

Object list within each relevant maintenance item will only include FL and Equipment that is relevant based on FL and Equipment Relevancy.


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Maintenance Plan:

An initial extract will be provided to business to evaluate.

Additional data/records may be required and these will be constructed via DCT.

Enrichment of in-scope data may be required and will be added via transformation rules (business/technical).

70,000

S/4HANA 

70,000

PF2, WP2

Maintenance Items:

An initial extract will be provided to business to evaluate.

Additional data/records may be required and these will be constructed via DCT.

Enrichment of in-scope data may be required and will be added via transformation rules (business/technical).

74,000

S/4HANA 

74,000

Additional Information

Multi-language Requirement

Multi language is supported for Maintenance plan and item. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Maintenance plan and item.

Document Management

Long text and DIR are not covered in this document as they are defined as another data object.

Legal Requirement

Not Applicable

Special Requirements

Not Applicable




Target Design

The technical design of the target for this conversion approach.

  1. Maintenance Header
    TableFieldData ElementField DescriptionData TypeLengthRequirement
    MPLAWARPLWARPLMaintenance PlanCHAR12System
    MPLAMPTYPMPTYPMaintenance plan categoryCHAR2Mandatory
    MPLASTRATSTRATMaintenance strategyCHAR6Mandatory
    MPLAWPTXTWPTXTMaintenance Plan TextCHAR40Mandatory
    MPLAVSPOSVERSCHPLUS
    NUMC3Conditional
    MPLATOPOSTOLERPLUSTolerance for Late Completion (%)NUMC3Conditional
    MPLATONEGTOLERNEGTolerance for Early Completion (%)NUMC3Conditional
    MPLAVSNEGVERSCHNEGShift Factor for Early CompletionNUMC3Conditional
    MPLASFAKTSFAKTCycle modification factorDEC3(2)Conditional
    MPLAFABKLFABKLFactory calendar keyCHAR2Conditional
    MPLAHORIZHORIZONTCall horizon for maintenance plan callsNUMC3Mandatory
    MPLAHORIZ_QUALIFIEREAM_CC_CALLHORIZON_QUALIFIERCalculation Type of Call HorizonCHAR1Mandatory
    MPLAABRHOABRHOScheduling PeriodNUMC3Mandatory
    MPLAHUNITHUNITUnit for Scheduling PeriodUNIT3Conditional
    MPLACALL_CONFIRMCALL_CONFIRMOnly Create New Call Object After Completing PredecessorCHAR1Conditional
    MPLASTADTSTADTStart dateDATS8Conditional
    RMIPMZEITTIME_KNZIndicator for selection of time-based maintenanceCHAR1Conditional
    MPLASTICHTERMKNZScheduling indicatorCHAR1Conditional
    MPLAPLAN_SORTPLAN_SORTSort field for maintenance plansCHAR20Mandatory
    MPLABEGRUIAUTGTechnical object authorization groupCHAR4Not Used
    RMIPMSTTAGMP_STTAGKey DateDATS8Conditional
    MPLAENDDT_FOR_SCHEDEAM_ENDDT_FOR_SCHEDEnd Date for SchedulingDATS8Conditional
    MPLATPLNRTPLNRFunctional LocationCHAR30Mandatory
    MPLAEQUNREQUNREquipment NumberCHAR18Conditional
    RMIPMGEWERKGEWRKMain work Centre for maintenance tasksCHAR8System
    RMIPMWERGWWERGWPlant associated with Main Work Centre CHAR4System
    RMIPMOFFS1WOFFS1Maintenance package offsetCHAR22Not Used
    RMIPMMEHRFACH_ZMEHRFACH_ZMultiple counter planCHAR1Not Used
    RMIPMWSETWSETCycle set for multiple counter planCHAR6Not Used
    MITEM_OBJLIST_DEQUIPMENTEQUNREquipment NumberCHAR18Conditional
    MITEM_OBJLIST_DFUNCTIONALLOCATIONTPLNR_UNCONVERTEDFunctional locationCHAR30Conditional
    KLAHCLASSKLASSE_DClass numberCHAR18Mandatory
  2. Maintenance Item
    TableFieldData ElementField DescriptionData TypeLengthRequirement
    MPLAWARPLWARPLMaintenance PlanCHAR12System
    MPOSWAPOSWAPOSMaintenance itemCHAR16System
    MPOSPSTXTPOSTXTItem Short TextCHAR40Mandatory
    MPOSBAUTLBAUTLAssemblyCHAR40Not Used
    MPOSIWERKIWERKMaintenance Planning PlantCHAR4System
    MPOSAUARTAUFARTOrder TypeCHAR4Mandatory
    MPOSPRIOKPRIOKPriorityCHAR1Mandatory
    MPOSGSBERGSBERBusiness AreaCHAR4Not Used
    MPOSPLNTYPLNTYTask List TypeCHAR1Mandatory
    MPOSPLNNRPLNNRKey for Task List GroupCHAR8Mandatory
    MPOSPLNALPLNALGroup CounterCHAR2Mandatory
    MPOSWPGRPINGRPPlanner Group for Customer Service and Plant MaintenanceCHAR3Conditional
    MPOSAPFKTAPFKTExecution factor for whole task listDEC3(0)Conditional
    MPOSANLZUANLZUSystem ConditionCHAR1Conditional
    MPOSSERIALNRGERNRSerial NumberCHAR18Not Used
    MPOSSERMATMATNRMaterial NumberCHAR40Not Used
  3. Cycle definitions and Measing Points for Maintenance Plan
    TableFieldData ElementField DescriptionData TypeLengthRequirement
    MPLAWARPLWARPLMaintenance PlanCHAR12System
    MMPTPAK_TEXTTXZYKLUSText for maintenance package/cycle (time/performance)CHAR30System
    MMPTPOINTIMRC_POINTMeasuring PointCHAR12Conditional
    MMPTZYKL1DZYK_ZEITMaintenance package cycle/offsetFLTP16(16)System
    MMPTZEIEHDZEIEHUnit for the performance of maintenance tasksUNIT3System
    Maintenance Plan and Item Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Maintenance Strategy information follows the Master Data Standard document that is located here.


Data Cleansing

Work Order Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Class information follows the Master Data Standard document that is located here <include hyperlink>.

IDCriticalityError Message/Report DescriptionRuleOutputSource System

1016-001

C1 

Maintenance Plan-Maintenance Item: Invalid, Inactive or no maintenance item

Maintenance Plan as per Relevancy Criteria assigned with inactive or no Maintenance Items attached. 

Maintenance Item 

PF2, WP2

1016-002

C1

Maintenance Plan-Description: Missing Description

Maintenance Plan Description is blank

Maintenance Plan Description 

PF2, WP2

1016-003

C2

Maintenance Plan-Description: Descriptions with Informal Words 

Maintenance Plan which contain Informal Words in the Maintenance Plan Description 

Maintenance Plan Description 

PF2, WP2

1016-004

C1

Maintenance Plan-Task List: Invalid, Inactive or no Task List allocated to Maintenance Plan 

Maintenance Plan as per Relevancy Criteria assigned with a Task List which does not belong below:
1. Task List as per Relevancy Criteria 

Task List 

PF2, WP2

1016-005

C1 

Maintenance Plan-Work Centre: Invalid, Inactive or no Work Centre assigned

Maintenance Item assigned with invalid or inactive Work Centre 

Work Centre 

PF2, WP2

1016-006

C1 

Maintenance Plan-Maintenance Strategy: Invalid, Inactive or no Maintenance Strategy assigned

Maintenance Plan as per Relevancy Criteria assigned with a Maintenance Strategy which does not belong below:
1. Maintenance Strategy as per Relevancy Criteria 

Maintenance Strategy 

PF2, WP2

1016-007

C1Maintenance Plan-Unit of Measure: UOM Missing / incorrect.Maintenance Plan and Item as per Relevancy Criteria with no UoM Assigned or Invalid UoM (T006)Unit of MeasurePF2, WP2

1016-008

C1

Maintenance Plan-Authorization Group: Technical object authorization group incorrect.Maintenance Plan and Item as per Relevancy Criteria with Invalid Authorization Group (T370F)Authorization Group

PF2, WP2

1016-009

C1

Maintenance Plan-Sort field: Blank or invalid Sort fieldMaintenance Plan and Item as per Relevancy Criteria with Invalid Sort Field (T399G)Sort Field

PF2, WP2

1016-010

C1

Maintenance Plan-Characteristic: Invalid, Inactive or no Characteristic allocated

Maintenance Plan as per Relevancy Criteria assigned with a Characteristic which does not belong below:
1. Characteristic as per Relevancy Criteria 

Characteristic 

PF2, WP2

1016-011

C1 

Maintenance Plan-Class: Invalid, Inactive or no Class allocated

Maintenance Plan as per Relevancy Criteria assigned with a Class which does not belong below:
1. Class as per Relevancy Criteria 

Class 

PF2, WP2

1016-012

C1 

Maintenance Plan: Invalid, Inactive or no Equipment or Functional Location allocated

Maintenance Plan as per Relevancy Criteria assigned with an Equipment or Functional Location which does not belong below:
1. Equipment as per Relevancy Criteria
2. Functional Location as per Relevancy Criteria 

Equipment, Functional Location 

PF2, WP2

1016-013

C1

Maintenance Item-Planning Plant: Planning Plant incorrect

Maintenance Plan and Item as per Relevancy Criteria with Invalid Plant (T001W) 

Planning Plant 

PF2, WP2

1016-014

C1

Maintenance Plan-Measuring Point : Invalid or inactive Measuring Point linked to  

Maintenance Plan assigned with invalid or inactive Measuring Point

Measuring Point 

PF2, WP2

1016-015

C3

Maintenance Item: Duplicate Maintenance Plan Items by Technical Object, Task List, Strategy, Description 

Maintenance Plan Items as per Relevancy Criteria where there is more than one Technical Object + Task List + Strategy + Description Combination. 

Technical Object, Task List, Strategy, Description 

PF2, WP2

1016-016

C1 

Maintenance Item-Maintenance Plan: Invalid, inactive or no Maintenance Plans linked

Maintenance Item as per Relevancy Criteria assigned with blank or inactive Maintenance Plan attached. 

Maintenance Plan 

PF2, WP2

1016-017

C1Maintenance Item-Planner Group: Invalid or no Planner GroupMaintenance Plan and Item as per Relevancy Criteria with no Planner Group Assigned or Invalid Planner Group (T024I)Planner GroupPF2, WP2

1016-018

C2

Maintenance Item-Planning Plant: Planning Plant and Maintenance Plant are not the sameMaintenance Item as per Relevancy Criteria with Planning Plant <> Maintenance PlantMaintenance Plant, Planning Plant

PF2, WP2

1016-019

C1

Maintenance Item-Characteristic: Invalid, Inactive or no Characteristic allocated

Maintenance Plan as per Relevancy Criteria assigned with a Characteristic which does not belong below:
1. Characteristic as per Relevancy Criteria 

Characteristic 

PF2, WP2

1016-020

C1 

Maintenance Item-Class: Invalid, Inactive or no Class allocated

Maintenance Plan as per Relevancy Criteria assigned with a Class which does not belong below:
1. Class as per Relevancy Criteria 

Class 

PF2, WP2

Informal Words **

Group 1

Group 2

Group 3

Group 4

Group 5

;

 

 

 

 

:

 

 

 

 

::

 

 

 

 

?





/

 

 

 

 

@

 

 

 

 

&

 

 

 

 

=

 

 

 

 

+

 

 

 

 

$

 

 

 

 

%



|



[



]



"




Conversion Process

The high-level process is represented by the diagram below:

For sites that are not on SAP-PF2 and WP2 systems, collection will be done manually in the data collection template.

The high-level process for DCT is represented by the diagram below:

Data Privacy and Sensitivity

Not Applicable


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state).  The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1

Extract data from source system based on relevancy rule

SyWay Data Team

2

Google Sheet report pre-populated with WP2 and WP2 information to be generated based on relevancy criteria.

SyWay Data Team


Selection Screen

If applicable, this section will give the details on any selection screen parameters, including the parameter type, that are required to be entered to ensure consistent data extracts.
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable




Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Maintenance Plan and Item data with exception of some fields which require transformation as mentioned in the transformation rule.

Maintenance Plan and Item DCT Rules

  1. Maintenance Plan Header - MPLA
    Field NameField DescriptionRule
    WARPLMaintenance Plan

    Running number NNNNNNNN to NNNNNNNN for Maintenance Plan Category = XXX. 

    MPTYPMaintenance Plan categoryMust reference to active Maintenance Plan category in S4/HANA (T399W)
    WPTXTMaintenance Plan text40 Char text

    STRAT

    Maintenance strategy

    Must reference to active strategy.
    Must be the same strategy as the task list strategy

    Naming Convention as follows: XX_XXX E.g - 01_001

    HORIZ_QUALIFIER 

    Calculation Type of Call Horizon

    Default to "% " if blank

    ABRHO

    Scheduling Period

    Default to "3" if blank

    HUNIT

    Unit in scheduling interval

    Default to "YR" if if blank and ABRHO is blank

    PLAN_SORT

    Sort field for maintenance plans

    Must reference to active Sort field in S4/HANA (T399G)

    Groups Maintenance Plans based on below design principal:
    Frequency + Maintenance Activity

    Each group (Sort Field) gets its own deadline monitoring variant.

    - Example: 
    6M_INSP: Monthly Inspection

    All Maintenance Plans of Inspection for 6M Inspection will be grouped with this Sort field.

    TPLNR

    Functional Location

    Must reference to active Functional Location in S4/HANA (IFLO)

    EQUNREquipment Number

    Must reference to active Equipment Number in S4/HANA (EQUI)

    Can be Blank only if FLOC is updated.
    Valid Entry if CT of the Equipment = Task List CT

    CLASSClass numberDefault to "9999"
  2. Maintenance Plan Items
    Field NameField DescriptionRule
    WARPLMaintenance Plan

    Must reference to active Maintenance Plan (MPLA).

    WAPOSMaintenance item 

    PSTXT

    Item Short Text

    Description shall be defined as Frequency + TOT + Asset Tag.

    PRIOKPriority

    Must reference to active Priority in S4/HANA (T356).

    PLNTYTask List Type

    Must reference to active Task List Type Task List Type in S4/HANA (TCA01).

    PLNNRKey for Task List Group

    Must reference to active Key for Task List Group in S4/HANA (PLKO).

    PLNALGroup Counter

    Group - Group Counter CT shall be equal to the Technical Object CT.

    AUFARTOrder Type

    Must reference to active Order Type in S4/HANA (T003O).

    Default to "YA02".

    WPGRPPlanner Group for Customer Service and Plant Maintenance

    Must reference to active Maintenance Planner Group in S4/HANA (T024I).

    Default to the value derived from the technical object.

    Update the value if provided by business (Takes Precedence).

    APFKTExecution factor for whole task list
    ANLZUSystem Condition

    POINT

    Measuring Point

    Must reference to active Measuring Point in S4/HANA (IMPTT).

    Must not be blank if the first 2 Chars of the Strategy = 02.

  3. Cycle definitions and Measing Points for Maintenance Plan
    Field NameField DescriptionRule
    WARPLMaintenance Plan

    Must reference to active Maintenance Plan in S4/HANA (MPLA).

    NUMMERCounter in control tables 
    POINTMeasuring Point
    ZEIEHUnit for the performance of maintenance tasksMust reference to active Unit of Measure (T006).
    ZYKL1Maintenance package cycle/offset
    PAK_TEXTText for maintenance package/cycle (time/performance)System
    LANGUPrimary language for object texts
    OFFSETStart offset of a time-based maintenance package
    CYCLESEQINDCycle Set Sequence
    SETREPEATINDRepeat Factor for Cycle Set Sequence

Extraction Dependencies

List the steps that need to occur before extraction can commence

Item #Step DescriptionTeam Responsible
1

Ensure Syniti has the necessary connection and access to legacy servers 

SyWay A2D Data Team

2

Ensure that the necessary cleansing activities in legacy sources are complete 

SyWay A2D Data Team / Business 

3

Ensure that create, change and deletion of master data is freeze in legacy Production system 

Legacy IT 

4Relevancy Criteria for Characteristics

 SyWay A2D Data Team

5Relevancy Criteria for ClassSyWay A2D Data Team
6Relevancy Criteria for Construction TypeSyWay A2D Data Team
7Relevancy Criteria for EquipmentSyWay A2D Data Team
8Relevancy Criteria for Functional LocationSyWay A2D Data Team
9Relevancy Criteria for Maintenance StrategySyWay A2D Data Team
10Relevancy Criteria for Measuring PointSyWay A2D Data Team
11Relevancy Criteria for Task ListSyWay A2D Data Team
12Relevancy Criteria for Work CentreSyWay A2D Data Team
13Relevancy Criteria for Material MasterSyWay A2D Data Team


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1

Obtain DCT Sign-off from Business

SyWay A2D Data Team

2

<Add steps from Syniti Migrate here>

Syniti

3

Review and Validate Error and Preload Reports

SyWay A2D Data Team

4

Generate Load Files

Syniti


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1PF2, WP2MPLAHORIZCall horizon for maintenance plan callsS/4HANA MPLAHORIZCall horizon for maintenance plan callsIf no legacy data provided, default to "100"
2PF2, WP2MPLAHORIZ_QUALIFIER Calculation Type of Call HorizonS/4HANA MPLAHORIZ_QUALIFIER Calculation Type of Call HorizonIf no legacy data provided, default to "%"
3PF2, WP2MPLAABRHOScheduling PeriodS/4HANA MPLAABRHOScheduling PeriodIf no legacy data provided, default to "3YR"
4PF2, WP2MPLAHUNITUnit in scheduling intervalS/4HANA MPLAHUNITUnit in scheduling intervalIf no legacy data provided, default to "Yr"
5PF2, WP2MPLATPLNRFunctional LocationS/4HANA MPLATPLNRFunctional Location

Equipment field must be blank.
Functional Location CT = Task List CT.

System Generated if Equipment is Updated

6PF2, WP2MPLAEQUNREquipment NumberS/4HANA MPLAEQUNREquipment NumberCan be Blank only if FLOC is updated.
CT of the Equipment must match Task List CT
7PF2, WP2MPOSPLNALGroup CounterS/4HANA MPOSPLNALGroup CounterGroup - Group Counter CT must be same as the Technical Object CT
8PF2, WP2MPOSWPGRP

Maintenance Planner Group

S/4HANA MPOSWPGRP

Maintenance Planner Group

Update the value if provided by business.

If no legacy data provided, default to the value derived from the technical object.

9PF2, WP2MPOSPOSTXTItem Short TextS/4HANA MPOSPOSTXTItem Short TextDescription shall be defined as Frequency + TOT + Asset Tag
10PF2, WP2MPLAMPTYPMaintenance plan categoryS/4HANA MPLAMPTYPMaintenance plan categoryDefault to "PM"
11PF2, WP2MPLAWPTXTMaintenance Plan TextS/4HANA MPLAWPTXTMaintenance Plan TextMaintenance Plan description must match Task list Description
12PF2, WP2MPOSAUFARTOrder TypeS/4HANA MPOSAUFARTOrder TypeDefault to "YA02"
13PF2, WP2MMPTPOINTMeasuring PointS/4HANA MMPTPOINTMeasuring PointUpdated if the first 2 Chars of the Strategy = 02. 
14PF2, WP2MPLAVSPOSShift Factor for Late CompletionS/4HANA MPLAVSPOSShift Factor for Late CompletionIf no legacy data provided, default to "0"
15PF2, WP2MPLATOPOSTolerance for Late Completion (%)S/4HANA MPLATOPOSTolerance for Late Completion (%)If no legacy data provided, default to "10%"
16PF2, WP2MPLAVSNEGShift Factor for Early CompletionS/4HANA MPLAVSNEGShift Factor for Early CompletionIf no legacy data provided, default to '0"
17PF2, WP2MPLATONEGTolerance for Early Completion (%)S/4HANA MPLATONEGTolerance for Early Completion (%)If no legacy data provided, default to "10%"
18PF2, WP2MPLASFAKTCycle modification factorS/4HANA MPLASFAKTCycle modification factorIf no legacy data provided, default to "1"
19PF2, WP2MPLACALL_CONFIRMOnly Create New Call Object After Completing PredecessorS/4HANA MPLACALL_CONFIRMOnly Create New Call Object After Completing PredecessorIf no legacy data provided, default to blank.
System Generated if Equipment is Updated
20PF2, WP2MPLASTADTStart dateS/4HANA MPLASTADTStart dateIf no legacy data provided, default to blank
21PF2, WP2RMIPMZEITIndicator for selection of time-based maintenanceS/4HANA RMIPMZEITIndicator for selection of time-based maintenanceIf no legacy data provided, default to "X"
22PF2, WP2KLAHCLASSClass numberS/4HANA KLAHCLASSClass numberDefault to "9999"
23PF2, WP2MPLAWARPLMaintenance PlanS/4HANA MPLAWARPLMaintenance Plan

Direct Mapping.

Note: This is used to generate Global Xref (Maintenance Plan)

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.

Transformation Mapping

Use the exact name and reference this section in the “Transformation rules” above
Mapping Table NameMapping Table Description
Informal CharactersList of Informal Characters and New Translation

Maintenance Plan

Old to new Maintenance Plan

Maintenance Strategy

Old to new Maintenance Strategy

Material Number

Old to new Material Number

Task List

Old to new Task List

Assembly

Old to new Assembly

Sort field

Old to new Sort field

Functional Location

Old to new Functional Location

Equipment Number

Old to new Equipment Number

Maintenance item

Old to new Maintenance item

Priority

Old to new Priority

Task List

Old to new Task List

Order Type

Old to new Order Type

Planner Group

Old to new Planner Group

Measuring Point

Old to new Measuring Point

Unit of Measure

Old to new  Unit of Measure

Maintenance Planner Group

Old to Maintenance Planner Group

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1

Ensure DCT tables completeness

SyWay A2D Data Team

2

Value Mappings are according to the latest design -<List of Value Mappings>

SyWay A2D Data Team


Pre-Load Validation

Project Team

The following pre-load validations will be performed by the Project Team.

Completeness

TaskAction

Verify Record Count

SyWay A2D Data Team to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets.

Verify Data Integrity

SyWay A2D Data Team to verify that the total number of Operations per Work Oder header extracted from legacy systems and DCTs (if any) should be equal to the total number of operations identified in the Preload and Load Sheets


Accuracy

TaskAction

Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks

Review Error Reports

Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

The following pre-load validations will be performed by the business.

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Business Data Owner/s to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible
1

Obtain DCT Sign-off from Business

SyWay A2D Data Team

2

Syniti will provide load file

Syniti

3Go to <Load Tool>SyWay A2D Data Team
4Load 3 records for "Create Maintenance Plan" function (IP01) to validate if data is loaded successfully without errorsSyWay A2D Data Team
5Proceed with full load if step 4 is validatedSyWay A2D Data Team
6Validate few records loaded by accessing standard transactions from S/4HNA E.g. IP03SyWay A2D Data Team
7Generate post load report if step 6 is validatedSyWay A2D Data Team


Load Phase and Dependencies

Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence

Configuration

List the Configurations required before loading can commence

Item #Configuration Item
1

Maintenance Plan Category

2

Maintenance Strategy

3

Maintenance Plan Sort Field details

4

Number Ranges for Work Plan & Item 

5

System Condition

6

Priorities

7

Planning Plant

8

Order Type

9

Task List Type

10Unit of Measure
11Planner group

Conversion Objects

Object #Preceding Object Conversion Approach

1002

Equipment

1003

Functional Location

1005

Task List 

1017

Maintenance Strategy

Error Handling

The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken

Configuration

Invalid Maintenance Plan Category

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Planner Group

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Plant

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Planning Plant

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid System Condition

Engage Functional team to expedite and fix the error in the system

Configuration 

Invalid Authorization Group

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Maintenance Activity Type

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Priority

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Notification Type

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Order Type

Engage Functional team to expedite and fix the error in the system

Invalid Data

Invalid Maintenance Strategy

Expedite whether the master data is changed in the system

Invalid Data

Invalid Work Centre

Expedite whether the master data is changed in the system

Invalid Data

Invalid Task List

Expedite whether the master data is changed in the system

Invalid Data

Invalid Functional Location

Expedite whether the master data is changed in the system

Invalid Data

Invalid Equipment

Expedite whether the master data is changed in the system


Post-Load Validation

Project Team

The following post-load validations will be performed by the Project Team.

Completeness

TaskAction

Verify Count

SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Verify that the Maintenance plan data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Business

The following post-load validations will be performed by the business.

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the EAM Maintenance plan data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Maintenance Plan and Item is in scope based on data design and any exception requested by business.
  • All data cleansing and preparation has been completed.
  • Maintenance Plan collection timeline are the same as Equipment and Functional Location collection. Maintenance Plan collection needs to go hand in hand with equipment and functional location collection. Drop down for equipment and functional location in the maintenance plan DCT relies on the input in equipment and functional location DCT.
  • All Maintenance Plans and Items mapped to valid Technical Objects in S/4 HANA


See also

Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.

Change log

Workflow history