The purpose of this document is to define the conversion approach to upload Materials - PO Text View into S/4 HANA as part of the Material Data Migration.
Summarise how the data is currently utilized and set up in the legacy system/s and how object is intended to be represented in S/4, and any other relevant information
The scope of this document covers the approach for converting active PO Text data on Materials and Services from Legacy Source Systems into S/4HANA following the Master Data Design Standard.
This object is migrated after Material Basic Data, therefore only materials in the Target MARA table can be included in the scope. For completeness, the scope for Material Basic Data is given below.
The data from legacy system includes:
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2,WP2 | Scope is Material and Service Master records that have been identified as part of Basic Data. | 500,000 | S4H | 500,000 |
Material Master - Basic View (2019) → Materials - Additional data (2021) → Materials Purchasing View (2020) → Materials – PO Text View.
Multi language is supported for Materials - PO Text. Login via a different language will show the description displayed in the logon language if the language key is maintained.
Not Applicable
Not Applicable
Not Applicable
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
STXL | TDOBJECT | Texts: application object | CHAR | 10 | Required | |
STXL | TDNAME | Name | CHAR | 70 | Required | |
STXL | TDID | Text ID | CHAR | 4 | Required | |
STXL | TDSPRAS | SPRAS | Language Key | LANG | 1 | Required |
STXL | CLUSTD | SAPscript: LONG RAW field for table STXL | LRAW | 7902 | Required |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
1 | High | TDSPARS Not In Allowed List | The following language are acceptable as being either core, or additional or the language of the supplier: BG, DE, EN, ES, FI, FR, IT, JA, KO, NL, PL, PT, RU, TH, ZF, ZH. | MATNR and Text messages that are not in the allowed list | PF2 & WP2 |
2 | High | TDSPRAS = Z9 (There is 1 record with this. Country is TW-Taiwan.) | Change Z9 to ZH. | TDSPRAS = ZH | PF2 & WP2 |
3 | Medium | Text Message Rules |
| MATNR and Text messages that don’t follow this | PF2 & WP2 |
The high-level process is represented by the diagram below:

Field Governance Rules | |||||
These governance rules apply to the individual fields within the data record. | |||||
Rule # | Field Label | Rule Description | Validation Method | Conditional Logic | Cleansing Rule (Also see Data Cleansing section above) |
1 | MARA-MATNR | Material number governance rules will be defined in Basic data as these are copied over from Basic data to PO text view automatically & are not specific to this view. | Upfront Automated | ||
2 | Language | The following language are acceptable as being either core, or additional or the language of the supplier: BG, DE, EN, ES, FI, FR, IT, JA, KO, NL, PL, PT, RU, TH, ZF, ZH. | Upfront Automated |
| |
3 | LongText | 1. No special characters. 2. Use line breaks. 3. Capitalise first letter of sentence & major words capitalised. | Text Message Rules | ||
Target Materials will come from both the Material Master and Service Master.
Text data in the table STXL is not readable and the Function Module “READ_TEXT” is used for this, using the following STXL fields: TDOBJECT, TDNAME, TDID and TDSPRAS.
TDOBJECT & TDID are used in the following combinations to get the data:
TDNAME: this will contain MARA-MATNR or ASMD-ASNUM.
| Req # | Requirement Description | Team Responsible |
|---|---|---|
1 | Extract data from PF2 and WP2 using Function Module “READ_TEXT” | Syniti Team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not Applicable |
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Loading Material Master Basic Data is required before Text data is loaded | Cutover |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Verify that data is extracted and merged. | Syniti/S2P |
2 | Transformation jobs are ready for execution. | Syniti |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
1 | PF2 & WP2 | STXL | TDOBJECT | S4H | STXL | TDOBJECT | Default to MATERIAL | ||
| 2 | PF2 & WP2 | STXL | TDNAME | S4H | STXL | TDNAME | Map from Old MARA-MATNR or Old ASMD-ASNUM to New MARA-MATRN | ||
| 3 | PF2 & WP2 | STXL | TDID | S4H | STXL | TDID | Default to BEST | ||
| 4 | PF2 & WP2 | STXL | TDSPRAS | S4H | STXL | TDSPRAS | Copy As-Is | ||
| 5 | PF2 & WP2 | Long Text | S4H | Long Text | Copy As-Is |
| Mapping Table Name | Mapping Table Description |
|---|---|
| Material | XREF |
| Item # | Step Description | Team Responsible |
|---|---|---|
| Not Applicable |
| Task | Action |
|---|---|
Verify Record Count | SyWay S2P Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | SyWay S2P Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Go to <Load Tool> | SyWay S2P Data Team |
2 | Load 3 records for < > to validate if data is loaded successfully without errors | SyWay S2P Data Team |
3 | Load 3 records for < > to validate if data is loaded successfully without errors | SyWay S2P Data Team |
4 | Proceed with full load if steps 2 and 3 are validated | SyWay S2P Data Team |
5 | Validate few records loaded by accessing standard transactions from S/4HNA eg. MM03 | SyWay S2P Data Team |
6 | Generate post load report if step 5 is validated | SyWay S2P Data Team |
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
Verify Count | SyWay S2P Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
| Task | Action |
|---|---|
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Material data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.