| Status | |
|---|---|
| Owner | TATARU-ext, Eugenia |
| Stakeholders | CASTELEIRA, Patricia @Massimo Lietaert |
| Jira Request ID | ERP-496 |
| Jira Development ID | ERP-716 |
| Parameter | Value |
|---|---|
| Application System (Source) | Descartes FTP Website |
| Application System ( Target) | SAP GTS E4H |
| Business Process Reference | 12.02.01.01. Manage Classification Codes |
Syensqo uses Descartes which is the market-leading global trade content for GTS to provide the most current regulatory data for Compliance Classification Codes Export Control on EARUS. This data provider is a 3rd party system for SAP GTS. New classification codes are provided by Descartes regularly within XML files.
The purpose of this interface is to automatize the process, by pulling & uploading the list of EARUS compliance classification codes published by the Government into SAP GTS. The update should occur when a file is provided by Data provider Descartes. Updates can be received on a weekly basis, hence the set up of the program will be marked as weekly.
Whenever an error occurs via the automatic interface, IT GTS users will get a notification within Fiori Launchpad in order to troubleshoot the problem (manual intervention).
While GTS is the leading system for classification codes and product assignment, this step is the prerequisite before classifying any product and before any export can happen in the system.
The emails that Descartes is sending to GTS IT team with the new classification codes will be replaced by this new automatization which follows one straight objective: to reduce the workload of man/hour which involves emails, dependency on an user action/availability or knowledge transfer within the team.
With the 3 different instances of GTS system for US, China and Rest of World, the EARUS file must be available in all systems for the product-classification codes to happen.
Detail the functional scope and objectives of the Interface. Please also describe the gap that will be addressed by this interface (Compared to SAP Standard)

Insert the flowchart and fill in the steps
Step | Description | Comment |
|---|---|---|
1 | EARUS XML codes published by Descartes | |
2 | File interface program to fetch the EARUS XML file and place it in the application server | |
3 | Upload to GTS system using the standard transaction /n/SAPSLL/LLNS_UPL002 | |
4 | Notification is send to the GTS IT users if successful/failed | |
5 | If upload fails, log the details of the upload and GTS IT users to troubleshoot the error |
Describe any assumptions that have been made in the process of completing this design. What functionality is expected of configuration or other developments that pass information to this development and/ or retrieve the information processed by it (performance, triggers, exceptions, etc.)
Descartes must published the XML for EARUS.
Indicate any dependencies or constraints that may impact development, in terms of requirements from internal or external applications or teams, limited access to legacy systems, time constraints or data restrictions. Also, please specify schedule dependencies e.g. interface or batch jobs that must run prior to execution.
Security Considerations for the Integration are:
To detail the security requirements for processing this object, any data integrity issues associated with the object and the teams that will be responsible for processing the object, i.e. authorization/roles required to who can execute the interface, encryption requirement, etc.
You have made the following settings in Customizing for the GTS system:
You have defined numbering schemes in Customizing for the general settings. The numbering scheme contains the underlying structure for the numbers.
You have defined and configured the necessary legal regulations in Customizing and activated them for the application areas.
You have set up system communication.
You transferred products from your feeder system to the GTS system.
Specify the configuration requirements for this object. Like in case of substitution/ routine specify the configuration needed
Overwriting should be possible. Whenever there is an emergency and cannot wait for the interface program to run, the GTS IT user can login to the FTP server, download the XML file and then upload the file to GTS manually.. However, at the next run of the program this should overwrite the entries stated by the GTS IT user.
Specify any special requirements or considerations that may impact the interface based on specific locations, regulatory compliance or system limitations. Clearly outline requirements e.g. localization rules for countries like China
If the interface interacts with third-party systems such as Icertis, describe any additional integration, security or authentication considerations that must be taken into account.
This template section may be used to specify an integration flow design between two systems.
| Field | Description |
|---|---|
The following fields will be used to provide the required information for this interface:
| Field | Description |
|---|---|
Populate the table below to list the target / source data field mapping between the Source system and Target system
| Source Table | API or Portlet Name | Source Field | Required (Y/N) | Description | Target Field | API or Portlet Name | Target Field | Required (Y/N) | Description | Rule Type | Rule Instruction |
|---|---|---|---|---|---|---|---|---|---|---|---|
Describe the processing requirement from Source System
Describe the processing requirement within Middleware Layer
Describe the processing requirement from Target System
Please describe any dependency to other interfaces, e.g. messages of interface x need to be processed before message processing of interface y can start.
Please describe any limitations on source and targets. i.e. target system can only accept maximum 100mb files, first-in-first-out, etc.
Please describe delivery requirements driven by business. i.e. real time, batch, scheduled, synchronous, triggering requirement, push or pull, etc.
Please describe change tracking requirements, i.e. transferring only delta, or always full load
Please describe any alert & monitoring requirement for business users and support organization
Please describe any reporting requirement that is expected to be provided in support of this interface
Specify multi language requirements
Capture the requirements for the user interface (UI) associated with the interface. It should provide a clear description of how users will interact with the interface and how information will be presented to ensure usability and accuracy.
Provide volumetrics details: Initial load volumes, Number of Records, Expected Frequency, Expected Long term Growth)
Specify if there are any specific performance factors that need to be taken into consideration during development i.e. interface must be able to handle 100 posting per-hour, etc.
Detail how errors will be handled: Notification, Restart/ Recovery and Re-Processing Procedures
Please provide some guidance and/or test data to help the developer unit test the interface. Please include both positive and negative testing (to validate error situations handling)
The developer will need to test repeatedly, so where appropriate provide instructions to reverse the actions performed so the test may be run again, or explain how to create new input data to the test. In particular, the developer will need logons for test users representing the various roles within the approval process.
| ID | Condition | Expected Results |
|---|---|---|
List any considerations essential for application test planning (e.g., test this before ABC along with DEF separate from GHI). If the development encompasses a user interface, explain how to test it. List any insights as to how this component could be tested the most efficiently.
| Package Name | Parent Package |
|---|---|
Other Development Objects
| Object Type | Object Name | Purpose/High Level Logic | Design Rationale Reference |
|---|---|---|---|
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.
