| Status | |
|---|---|
| Owner | TATARU-ext, Eugenia |
| Stakeholders | |
| Jira Request ID | |
| Jira Development ID |
| Parameter | Value |
|---|---|
| Application System (Source) | Descartes FTP Website |
| Application System ( Target) | SAP GTS |
| Business Process Reference | 12.02.01.01. Manage Classification Codes |
Syensqo uses Descartes (3rd party system) which is the market-leading global trade content for GTS that provides the most current regulatory data for Compliance Classification Codes (Export Control on EARUS). New classification codes are always provided by Descartes on a regular basis via XML files.
The purpose of this integration specification is to automatize the process by, extracting the list of EARUS compliance classification codes published by the Government from Descartes's website and upload it to GTS. The update should occur when a file is provided by Descartes. Updates can be received on a weekly basis, hence the set up of the program will be marked as weekly to do the file movement. The files will be taken from the directory path within Descartes website in a zip format. The files are supposed to the stored after successful upload to GTS system - audit purposes (the upload program to the GTS system is covered within FS: ).
In terms of errors that can occur via the automatic interface, IT GTS users will get a notification within Fiori Launchpad in order to troubleshoot the problem (manual intervention).
While GTS is the leading system for classification codes and product assignment, this step is the prerequisite before classifying any product and before any export can happen in the system.
This new automatization follows one straight objective: to reduce the workload of man/hour which involves → emails, dependency on an user action/availability or knowledge transfer within the team.
With the 3 different instances of GTS system for US, China and Rest of World, the EARUS file must be available in all systems for the product-classification codes to happen.
Detail the functional scope and objectives of the Interface. Please also describe the gap that will be addressed by this interface (Compared to SAP Standard)

Insert the flowchart and fill in the steps
Step | Description | Comment |
|---|---|---|
1 | EARUS XML codes published by Descartes data provider | weekly basis |
2 | File interface program to fetch the EARUS XML file and place it in the application server | |
3 | Upload to GTS system using the standard transaction /n/SAPSLL/LLNS_UPL002 | |
4 | Fiori Launchpad is used to send notification to the GTS IT users if successful/failed | users will be maintained under a custom table |
5 | If upload fails, log the details of the upload and GTS IT users to troubleshoot the error | |
6 | After a successful upload , the program will then archive the file from the directory. |
Describe any assumptions that have been made in the process of completing this design. What functionality is expected of configuration or other developments that pass information to this development and/ or retrieve the information processed by it (performance, triggers, exceptions, etc.)
Descartes must published first the XML content for Export Control Classification Numbers- EARUS codes.
Indicate any dependencies or constraints that may impact development, in terms of requirements from internal or external applications or teams, limited access to legacy systems, time constraints or data restrictions. Also, please specify schedule dependencies e.g. interface or batch jobs that must run prior to execution.
To detail the security requirements for processing this object, any data integrity issues associated with the object and the teams that will be responsible for processing the object, i.e. authorization/roles required to who can execute the interface, encryption requirement, etc.
N/A
Specify the configuration requirements for this object. Like in case of substitution/ routine specify the configuration needed
Overwriting should be possible. Whenever there is an emergency and cannot wait for the interface program to run, the GTS IT user can login to the FTP server, download the XML file and then upload the file to GTS manually.. However, at the next run of the program this should overwrite the entries stated by the GTS IT user.
Specify any special requirements or considerations that may impact the interface based on specific locations, regulatory compliance or system limitations. Clearly outline requirements e.g. localization rules for countries like China
If the interface interacts with third-party systems such as Icertis, describe any additional integration, security or authentication considerations that must be taken into account.
Existing process is a manual upload of ECCN EARUS XML files on a regularly basis into GTS and it needs to be replaced by this automated solution:
This template section may be used to specify an integration flow design between two systems.
N/A
Source Structure
The following fields will be used to provide the required information for this interface:
| Field | Description |
|---|---|
The following fields will be used to provide the required information for this interface:
| Field | Description |
|---|---|
N/A
Populate the table below to list the target / source data field mapping between the Source system and Target system
| Source Table | API or Portlet Name | Source Field | Required (Y/N) | Description | Target Field | API or Portlet Name | Target Field | Required (Y/N) | Description | Rule Type | Rule Instruction |
|---|---|---|---|---|---|---|---|---|---|---|---|
Develop a custom interface which will retrieve on a weekly basis the FTP XML EARUS content from Descartes (Source).
The day and time of the weekly setup to be confirmed later.
Describe the processing requirement from Source System
N/A
Describe the processing requirement within Middleware Layer
The files fetched from the data provider will be uploaded to GTS system with standard transaction /n/SAPSLL/LLNS_UPL002.
Describe the processing requirement from Target System
N/A
Please describe any dependency to other interfaces, e.g. messages of interface x need to be processed before message processing of interface y can start.
N/A
Please describe any limitations on source and targets. i.e. target system can only accept maximum 100mb files, first-in-first-out, etc.
This interface should work like a batch program which runs on the same time every week (TBD the day and time).
Please describe delivery requirements driven by business. i.e. real time, batch, scheduled, synchronous, triggering requirement, push or pull, etc.
First upload will be considered the initial upload for EARUS XML classification codes → full upload.
After that, the rest are considered delta, whenever new codes shows up or changes.
Please describe change tracking requirements, i.e. transferring only delta, or always full load
A notification via Fiori Launchpad (standard) is send to the GTS IT user if any error occurs during file upload in GTS, but also if upload was successfully executed.
Users listed under DL sco-digops-gts@syensqo.com will be added to a custom maintenance table (SM30):
| Data Element | Data Type | Length | |
|---|---|---|---|
| Client | MANDT | CLNT | 3 |
| User ID | SYUNAME | CHAR | 12 |
Please describe any alert & monitoring requirement for business users and support organization
N/A
Please describe any reporting requirement that is expected to be provided in support of this interface
English
Specify multi language requirements
N/A
Capture the requirements for the user interface (UI) associated with the interface. It should provide a clear description of how users will interact with the interface and how information will be presented to ensure usability and accuracy.
Provide volumetrics details: Initial load volumes, Number of Records, Expected Frequency, Expected Long term Growth)
For the XML size during extraction, reach out to the owner of the FS to get the details to login to Descartes website and to do the technical check.
Specify if there are any specific performance factors that need to be taken into consideration during development i.e. interface must be able to handle 100 posting per-hour, etc.
When a file has errors during upload the file is not archived from the directory. A notification is sent to the GTS IT user to check the error. Worst case, the user must upload manually the XML and do correction manually in GTS.
If no file found the customs program will stop with an error ending the program.
Log requirements (Is there a log that shows the job has run?):
Detail how errors will be handled: Notification, Restart/ Recovery and Re-Processing Procedures
Please provide some guidance and/or test data to help the developer unit test the interface. Please include both positive and negative testing (to validate error situations handling)
The developer will need to test repeatedly, so where appropriate provide instructions to reverse the actions performed so the test may be run again, or explain how to create new input data to the test. In particular, the developer will need logons for test users representing the various roles within the approval process.
| ID | Condition | Expected Results |
|---|---|---|
| 1 | Sample file from Descartes test folder to be uploaded | File should be fetched and uploaded to GTS system |
N/A
List any considerations essential for application test planning (e.g., test this before ABC along with DEF separate from GHI). If the development encompasses a user interface, explain how to test it. List any insights as to how this component could be tested the most efficiently.
| Package Name | Parent Package |
|---|---|
Other Development Objects
| Object Type | Object Name | Purpose/High Level Logic | Design Rationale Reference |
|---|---|---|---|
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.
