BOM (Bill of Material), is a cost-focused recipe of everything required to build a material, including energy and logistic related costs.
This data is available in the Data Ocean as of Q4 2024.
BOM related data, composed of both actuals and forecasts, are extracted through SAP BW queries(COPC04 and COPA06) where costs are available as monthly versions called “run periods”.
Each version (i.e. run period) is composed of one actual month and 18 forecast months:
Manufacturing Variable Costs
QV_BW_QRY_CPCOPC04_0001
Forecasts of variable costs for manufacturing each material, detailing all component costs. Such forecasts are consolidated as monthly versions.
Manufacturing Costs (can be called IVC -Integrated variable cost as well)
QVSBS_BW_QRY_MVCOPA06_0001
Historical (variable or fixed) costs for manufacturing each material. It only provides overall costs for variable costs, logistic and fixed costs.
BOM data in the Data Lake is composed of below tables/views:
Project Space: gcp-sqo-data-pricing-d
See how this entity relates to the others in the pricing data model here.
Loading process:
Data will be refreshed from SAP-BW into data ocean on a daily basis
Will extract forecast data from CPCOPC04 data latest month of transactions on a daily basis and refresh into data ocean. This will include next 24 months of data
https://docs.google.com/drawings/d/1sC8p4J9RtrwRuKXOvgM3a-r4R4Bj5Hs0IJIVqEI9eYY/edit
https://docs.google.com/drawings/d/1y1-_4IROiqBsFIJ_SMRCW-1pgoiREAZC--ceOIZojwU/edit
Refer below data flow diagram for low level data flow design:
View ID: gcp-sqo-data-pricing-d.DataOcean.V_FACT_bom_raw
View ID: gcp-sqo-data-pricing-d.DataOcean.V_FACT_bom_flc_raw
View ID: gcp-sqo-data-pricing-d.DataOcean.V_FACT_bom_enriched