Purpose

The purpose of this document is to define the conversion approach to create Equipment in S/4 HANA.

In SAP Plant Maintenance (SAP S4/HANA EAM), a piece of equipment is an individual object that is to be maintained independently. Each piece of equipment is managed independently in the system, so that you can: 

  • Manage individual data from a maintenance perspective for the object

  • Perform individual maintenance tasks for the object

  • Keep a record of the maintenance tasks performed for the object

  • Collect and evaluate data over a long period of time for the object

As per Syensqo's design, all maintainable asset will be represented by Equipment, with the exception where the asset is maintained by Syensqo but not owned, in which case the asset will be migrated as a Functional Location. As per SyWay design, EAM Equipment will be standardized.


Conversion Scope

The scope of this document covers the approach for converting relevant Equipment from Legacy Source Systems into S/4HANA following the Equipment Master Data Design Standard.

In Syensqo’s SAP S/4HANA landscape, Equipment is used to define an individual asset or a sub-component of an asset. Each Equipment record represents a maintainable unit, serving as a critical master data for executing maintenance and work management processes. An Equipment is defined based on its construction and a defined Maintenance strategy is followed by to ensure its Reliability and sustainability.

An Equipment is only created when there is a defined Maintenance Strategy defined for it and a criticality derived from Risk Assessment process.

Depending on its installation context, Equipment is categorized by a user status to define its current state in its lifecycle from Planning to Retire. Every piece of Equipment that is Inservice is installed at a relevant superior Functional Location, ensuring its position within the asset hierarchy is clearly defined.

This structured approach supports efficient maintenance planning, traceability, and lifecycle management of assets across Syensqo’s operations.

Syensqo to-be asset structure comprises of the Asset Levels shown below. This conversion specification shall cover conversion for only the Equipment Asset Level Technical Objects. 

Level

Technical Object

Function/ Meaning

Asset Level 1Functional LocationDefines the Asset (AFLOC1)
Asset Level 2Functional LocationDefines Sub Asset (AFLOC2)
Equipment Level 1EquipmentMaintainable Item / Class (Primary maintainable unit)
Equipment Level 2EquipmentMaintainable Item / Component (sub-equipment)

Note: Please refer CNV-1003 Function Location for details on the Functional Location Asset Level conversion. 


The data from legacy system includes:

  • Equipment (EQUI-EQUNR) having Maintenance Plant (EQUI-WERKS) in scope (Value Mapping : Plant, where Maintenance Plant = 'Yes')
  • Functional Locations (IFLOT-TPLNR) to be migrated as Equipment as part of mapping (Functional Location, where New Technical Object = 'EQ')

The data from legacy system excludes:

  • Equipment (EQUI-EQUNR) with System Status (JEST-STAT) = Inactive 'INAC'
  • Equipment (EQUI-EQUNR) with System Status (JEST-STAT) = Deletion Flag 'DLFL'
  • Equipment (EQUI-EQUNR) with System Status (JEST-STAT) = In the warehouse 'ESTO'
  • Equipment (EQUI-EQUNR) with System Status (JEST-STAT) = Available 'AVLB'
  • Equipment (EQUI-EQUNR) with System Status (JEST-STAT) <> Installed 'INST'
  • Equipment (EQUI-EQUNR) with Serial Number (EQUI-SERNR) <> '' (BLANK)

List of Tables to extract for this object is maintained here: Extract Table Register.


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Relevant Equipment will be extracted from PF2 and WP2

60,347S/4HANA60,347

DCT

1. Additional Functional Location to be created as Equipment
2. Any other Equipment in the site not created as equipment

TBD

S/4HANA

TBD

Additional Information

Multi-language Requirement

Equipment description will be made available in English.

Multi language is supported for Equipment. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Equipment.

Document Management

Refer to the KDD085 - Document Management in the SyWay Solution

Note: Documents attached to Equipment will be migrated as part of 9104-EAM Attachments.

Legal Requirement

Not Applicable

Special Requirements

Not Applicable


Target Design

The technical design of the target for this conversion approach.

1. Equipment Master

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUIEQUNREQUNREquipment NumberCHAR18

System

Key Field

EQUIEQTYPEQTYPEquipment CategoryCHAR

1

Mandatory
EQUIEQARTEQARTTechnical Object TypeCHAR10Mandatory
EQUIBRGEWBRGEWWeightQUAN13Conditional
EQUIGEWEIGEWEIUnit of WeightUNIT3Conditional
EQUIINVNRINVNRInventory NoCHAR25Conditional
EQUIINBDTINBDTStart-up dateDATS8Conditional
EQUIANSWTANSWTAcquisition ValueNUMC13Conditional
EQUIWAERSWAERSCurrencyCUKY5Conditional
EQUIHERSTHERSTManufacturerCHAR30Conditional
EQUITYPBZTYPBZModel NumberCHAR20Conditional
EQUISERGESERGEManufacturer Serial NumberCHAR30Conditional
EQUIHERLDHERLDCountry/Region of ManufactureCHAR3Conditional
EQUIBAUJJBAUJJYear of constructionCHAR4Conditional
EQUIBAUMMBAUMMMonth of ManufactureCHAR2Conditional
EQUZDATABDATABValid-From DateDATS8Mandatory
EQUZIWERKIWERKMaintenance Planning PlantCHAR4Mandatory
EQUZINGRPINGRPPlanner Group CHAR3Conditional
EQUZGEWRKGEWRKMain work centerCHAR8Conditional
EQUZWERGWWERGW

Plant associated with main work center

CHAR4Conditional
EQUZHEQUIHEQUISuperordinate EquipmentCHAR18Conditional
EQUZSUBMTSUBMTConstruction typeCHAR40Mandatory
ILOAABCKZABCKZABC IndicatorCHAR1Mandatory
ILOATPLNRTPLNRFunctional LocationCHAR30Conditional
ILOASWERKSWERKMaintenance PlantCHAR4Mandatory
ILOABEBERBEBERPlant SectionCHAR3Mandatory
ILOAEQFNREQFNRSort FieldCHAR30Mandatory
ILOABUKRSBUKRSCompany CodeCHAR4Mandatory
ILOAKOSTLKOSTLCost CenterCHAR10Mandatory
ILOAKOKRSKOKRSControlling AreaCHAR4Mandatory
ADRCNAME1NAME1Name 1CHAR40Conditional
ADRCNAME2NAME2Name 2CHAR40Conditional
ADRCNAME3NAME3Name 3CHAR40Conditional
ADRCNAME4NAME4Name 4CHAR40Conditional
ADRCCOUNTRYCOUNTRYCountry/Region KeyCHAR3Conditional


2. Equipment Short Text

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQKTSPRASSPRASLanguage KeyLANG1Mandatory
EQKTEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

EQKTPLTXTPLTXTDescription of EquipmentCHAR40Mandatory

Note: Each Equipment must have 1 entry for English language and 1 entry for the language(s) of the country in which each Maintenance Plant assigned is located (French, Italian, Mandarin, Brazilian Portuguese, German or Spanish). 


3. Equipment Classification (Header)

TableFieldData ElementField DescriptionData TypeLengthRequirement
KSSKKLARTKLARTClass TypeCHAR20Mandatory
KSSKOBTABOBTABName of Database Table for ObjectCHAR30Mandatory
KSSKCLASSNUMCLASSNUMClass NameCHAR30Mandatory
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

KSSKSTATUSTATUClassification StatusCHAR80Mandatory


 4. Equipment Classification (Characteristics Value Allocation)

TableFieldData ElementField DescriptionData TypeLengthRequirement
CABN

ATNAM

ATNAM

Characteristic NameCHAR30Mandatory
AUSPPOSNRPOSNR Item NumberCHAR3Mandatory
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

AUSPATFLVATFLVNumerical Value - From NUMC16Conditional
AUSPATFLBATFLBNumerical Value - ToNUMC16Conditional
AUSPATCODATCODCode for Value DependencyCHAR1Conditional
AUSPDATE_FROMDATE_FROMLower Boundary for Date - IntervalDATS8Conditional
AUSPDATE_TODATE_TOUpper Boundary for Date - IntervalDATS8Conditional
AUSPTIME_FROMTIME_FROMLower Boundary for Time - IntervalTIMS6Conditional
AUSPTIME_TOTIME_TOUpper Boundary for Time - IntervalTIMS6Conditional
AUSPATFLVATFLVCurrency Value - From (Floating Point)NUMC16Conditional
AUSPATFLBATFLBCurrency Value - To (Floating Point)NUMC16Conditional
AUSPCURRENCYCURRENCYCurrency KeyCUKY5Conditional
AUSPATWRTATWRTCharacteristic ValueCHAR30Conditional
KSSKKLARTKLARTClass TypeCHAR20Mandatory
KSSKCLASSCLASSClass NameCHAR30Mandatory


5. Equipment Partner

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

IHPAOBTYPOBTYPObject TypeCHAR3Mandatory
IHPAPARVWPARVWPartner FunctionCHAR2Mandatory
IHPAPARNRPARNRPartnerCHAR12Mandatory


6. Equipment User Status

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

JSTOSTSMASTSMAStatus profile of the functional locationCHAR8Mandatory

JEST

STAT

STATStatus Number in User Status ListCHAR5Mandatory


7. Equipment Long Text Header

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

STXHTDOBJECTTDOBJECTTexts: application objectCHAR10Mandatory
STXHTDNAMETDOBNAMENameCHAR70Mandatory
STXHTDIDTDIDText IDCHAR4Mandatory
STXHTDSPRASSPRASLanguage KeyLANG1Mandatory


8. Equipment Long Text Line

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUIEQUNREQUNREquipment NumberCHAR18

Mandatory

(Key to link to Equipment)

STXLTDOBJECTTDOBJECTTexts: application objectCHAR10Mandatory
STXLTDNAMETDOBNAMENameCHAR70Mandatory
STXLTDIDTDIDText IDCHAR4Mandatory
STXLTDSPRASSPRASLanguage KeyLANG1Mandatory
STXLTDFORMATTDFORMATTag columnCHAR1Mandatory
STXLTDLINETDLINEText LineCHAR72Mandatory

Note:

  1. Long Text is not mandatory, only load when there is data
  2. One Long Text Header must have at least 1 Long Text Line

Equipment Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Equipment information follows the Master Data Standard document that is located here.


Data Cleansing

All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.

If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.

IDCriticalityError Message/Report DescriptionRuleOutputSource System
1002-001C1Invalid, Inactive or no Cost Centres linked to EquipmentEquipment as per Relevancy Criteria assigned with a Cost Centre which does not belong below:
1. Cost Centre (FI) as per Relevancy Criteria
Cost CentrePF2, WP2
1002-002C1Invalid or Inactive Business Partner (Customer) linked to EquipmentEquipment as per Relevancy Criteria assigned with a Business Partner / Customer (Partner) which does not belong below:
1. Business Partner FLCU01 (SD) as per Relevancy Criteria
Business Partner (Customer)PF2, WP2
1002-003C1Invalid or Inactive Business Partner (Vendor) linked to EquipmentEquipment as per Relevancy Criteria assigned with a Business Partner / Customer (Partner) which does not belong below:
1. Business Partner / Vendor (S2P) as per Relevancy Criteria
Business Partner (Vendor)PF2, WP2
1002-004C1Invalid, Inactive or no Characteristic linked to EquipmentEquipment as per Relevancy Criteria assigned with a Characteristic which does not belong below:
1. Characteristic as per Relevancy Criteria
CharacteristicPF2, WP2
1002-005C1Invalid, Inactive or no Class linked to EquipmentEquipment as per Relevancy Criteria assigned with a Class which does not belong below:
1. Class as per Relevancy Criteria
ClassPF2, WP2
1002-006C1Invalid, Inactive or no Construction Type linked to EquipmentEquipment as per Relevancy Criteria assigned with a Construction Type which does not belong below:
1. Construction Type as per Relevancy Criteria
Construction TypePF2, WP2
1002-007C1Invalid or Inactive Document Info Record linked to EquipmentEquipment as per Relevancy Criteria assigned with a Document Info Record which does not belong below:
1. Document Info Record as per Relevancy Criteria
Document Info RecordPF2, WP2
1002-008C1Invalid, Inactive or no Fixed Asset linked to EquipmentEquipment as per Relevancy Criteria assigned with a Fixed Asset which does not belong below:
1. Fixed Asset (FI) as per Relevancy Criteria
Fixed AssetPF2, WP2
1002-009C1Invalid, Inactive or no Work Centre linked to EquipmentEquipment as per Relevancy Criteria assigned with a Work Centre which does not belong below:
1. Work Centre as per Relevancy Criteria
Work CentrePF2, WP2
1002-010C1Invalid, Inactive or no WBS linked to EquipmentEquipment as per Relevancy Criteria assigned with a WBS which does not belong below:
1. Work Breakdown Structure (PS) as per Relevancy Criteria
Work Breakdown StructurePF2, WP2
1002-011C1Invalid, Inactive or no Functional Location linked to EquipmentEquipment as per Relevancy Criteria assigned with a Functional Location which does not belong below:
1. Functional Location as per Relevancy Criteria
Functional LocationPF2, WP2
1002-012C1Invalid, Inactive or no Maintenance Plans linked to EquipmentEquipment as per Relevancy Criteria with no Maintenance Plan Linked or with a Maintenance Plan which does not belong below:
1. Maintenance Plan as per Relevancy Criteria
Maintenance PlanPF2, WP2
1002-013C1Invalid or no Planner Group linked to EquipmentEquipment as per Relevancy Criteria with no Planner Group Assigned or Invalid Planner Group (T024I)Planner GroupPF2, WP2
1002-014C1Invalid or no Technical Object Type linked to EquipmentEquipment as per Relevancy Criteria with no Technical Object Type Assigned or Invalid Technical Object Type (T370K)Technical Object TypePF2, WP2
1002-015C2Maintaiable physical assets not created in the SAP systems
EquipmentPF2, WP2
1002-016C1Review all Functional Location / Equipment sitting under 'DLFL' or 'DLT'
If these data set is not used / not needed, the system status should be set to INAC.

System StatusPF2, WP2
1002-017C3Duplicate Equipment by Manufacturer, Model, Serial NumberEquipment as per Relevancy Criteria where there is more than one Manufacturer + Model + Serial Number Combination.Manufacturer, Model, Serial NumberPF2, WP2
1002-018C1Invalid, Inactive or no Material linked to EquipmentEquipment as per Relevancy Criteria assigned with a Material which does not belong below:
1. Material Master (S2P) as per Relevancy Criteria
MaterialPF2, WP2
1002-019C2Material Types of Construction Types are non-Maintenance AssemblyEquipment as per Relevancy Criteria where the Construction Type Assigned has a non-Maintenance Assembly Material Type*
QF2: ZZ90-Maintenance Assembly
WQ2: ZIBA-Maintenance Assembly
Construction TypePF2, WP2
1002-020C1Missing Equipment DescriptionsEquipment as per Relevancy Criteria where there are blank Equipment Descriptions.Equipment DescriptionPF2, WP2
1002-021C2Equipment Descriptions with Informal WordsEquipment as per Relevancy Criteria which contain [Informal Words] in the Equipment DescriptionEquipment DescriptionPF2, WP2
1002-022C1ABC Indicator missing on EquipmentEquipment as per Relevancy Criteria where ABC Indicator is blankABC IndicatorPF2, WP2
1002-023C1Equipment Company Code incorrect.Equipment as per Relevancy Criteria with Invalid Company Code (T001)Company CodePF2, WP2
1002-024C1Equipment Technical object authorization group incorrect.Equipment as per Relevancy Criteria with Invalid Authorization Group (T370F)Authorization GroupPF2, WP2
1002-025C2Equipment Planning Plant and Maintenance Plant are not the same.Equipment as per Relevancy Criteria with Planning Plant <> Maintenance PlantMaintenance Plant, Planning PlantPF2, WP2
1002-026C1ABC Indicator missing on EquipmentEquipment as per Relevancy Criteria where ABC Indicator is blankABC Indicator

PF2, WP2

100-XXXC3Info Report : Relevant Equipment Long Text for CleansingEquipment as per Relevancy Criteria where Long Text Exist flag is assigned (EQKT-KZLTX) = 'X'. This is for manual review.Plant, Equipment No., Equipment Description, Long TextPF2, WP2



Conversion Process

Conversion will involve both Source System Extraction as well as using DCT (Data Collection Template) - 

The high-level process for Source System Extraction is represented by the diagram below:

image-2025-6-9_14-37-29.png


For sites that are not on SAP-PF2 and WP2 systems, collection will be done manually in the data collection template.

The high-level process for DCT is represented by the diagram below:

image-2025-6-11_16-37-32.png

Data Privacy and Sensitivity

<To add more info later if applicable>


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleSyWay Data Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team


Selection Screen

If applicable, this section will give the details on any selection screen parameters, including the parameter type, that are required to be entered to ensure consistent data extracts.
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable



















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Data Object data with exception of some fields which require transformation as mentioned in the transformation rule.

<Object> DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

List the steps that need to occur before extraction can commence

Item #Step DescriptionTeam Responsible

1

Ensure Syniti has the necessary connection and access to legacy servers 

Data

2

Ensure that the necessary cleansing activities in legacy sources are complete 

Data / Business 

3

Ensure that create, change and deletion of master data is freeze in legacy Production system 

Legacy IT





Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

SyWay A2D Data Team

2

<Add steps from Syniti Migrate here>

SyWay A2D Data Team

3

Review and Validate Error and Preload Reports

SyWay A2D Data Team

4

Generate Load Files

SyWay A2D Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Use the exact name and reference this section in the “Transformation rules” above
Mapping Table NameMapping Table Description
EXC-Functional Location_IDFunctional Locations (Lowest Level) to be created as Equipment. To be compiled based on manual Review (Initial List Low-Level Functional Location). This will be an inclusion for Equipment.






Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure DCT tables completenessSyWay A2D Data Team
2Value Mappings are according to the latest design - <List of Value Mappings>SyWay A2D Data Team







Pre-Load Validation

Project Team

The following pre-load validations will be performed by the Project Team.

Completeness

TaskAction
Verify Record CountSyWay A2D Data Team to verify that the total number of relevant records from the Source Extract and DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

Business

The following pre-load validations will be performed by the business.

Completeness

TaskAction
Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the Source Extract and DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off Source Extract & DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence

Configuration

List the Configurations required before loading can commence

Item #Configuration Item
1

Equipment Category

2

Technical Object Type

3

Weight Unit

4

Currency

5

Country of manufacturer

6

Maintenance Plant and Planning Plant

7

Plant Section

8

Planner Group

9

ABC indicator

10

Catalog Profile 

Conversion Objects

Object #Preceding Object Conversion Approach
1003Functional Location

Error Handling

The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken

Configuration

Equipment cat missing

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Object Type

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Weight Unit

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Currency

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Country of Manufacturer

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Maintenance Plant

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Plant Section

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid ABC indicator

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Planning Plant

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid Planner Group

Engage Functional team to expedite and fix the error in the system

Configuration

Invalid catalog profile

Engage Functional team to expedite and fix the error in the system

Invalid Data

Invalid Cost Centre 

Expedite whether the master data is changed in the system

Invalid Data

Invalid Class

Expedite whether the master data is changed in the system

Invalid Data

Invalid Production Work Centre

Expedite whether the master data is changed in the system

Invalid Data

Invalid Maintenance Work Centre

Expedite whether the master data is changed in the system

Invalid Data

Invalid Assembly

Expedite whether the master data is changed in the system


Post-Load Validation

Project Team

The following post-load validations will be performed by the Project Team.

Completeness

TaskAction

Verify Count

Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.).




Accuracy

TaskAction

Conversion Accuracy

Data team to verify that the Measuring Point data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. 






Business

The following post-load validations will be performed by the business.

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.






Accuracy

TaskAction



Conversion Accuracy

Verify that the Measuring Point data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.




Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Equipment is in scope based on data design and any exception requested by business.
  • All data cleansing and preparation has been completed.

Any additional key assumptions.


See also

Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.