The purpose of this document is to define the conversion approach to create 2005 - Material Master - Work Scheduling View
in S/4 HANA.
In SAP PP-PI, the Work Scheduling view in the Material Master is a plant-specific view that contains essential data for producing a material in-house, allowing you to create and schedule production orders for it. Key fields within this view include the Production Scheduling Profile, which automates key tasks for production orders, and the Production Scheduler, who manages the material's capacity requirements. Maintaining this view is necessary for managing production processes and enabling the system to calculate production and operation start and end dates.
Purpose of the Work Scheduling View
Enables Production Orders:
You must maintain the Work Scheduling view for a material to allow the system to create production or process orders for it.
Plant-Level Data:
This view contains data specific to a particular plant, as production processes are managed at the plant level.
Key Fields and Their Functions
Production Scheduler:
A person or role responsible for managing the material's production in a specific plant. They determine how capacity requirements are calculated during a scheduling run.
Production Scheduling Profile (PSP):
A crucial tool for standardizing and automating production processes. It can dictate actions like automatically releasing and scheduling orders, triggering goods receipts, or managing batch creation.
While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design. Due to the new plant mapping and the Material / plant mapping, an extensive cleansing, transformation to do for this object
The data from legacy system may include:
The data from legacy system excludes:
The scope of this document covers the approach for converting active Material Master - Work Scheduling view from Legacy Source Systems into S/4HANA following the Material Master - Work Scheduling view Master Data Design Standard.
The data from legacy system includes:
For Open Inventory use the following tables:
MARD
MKOL (Consignment stock)
MSKA (Sales Order stock)
MSLB (Special stock)
MSPR (Project stock)
The data from legacy system excludes:
| Source | Scope | Source Approx. No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | SAP ECC PF2 records for approximately 60 manufacturing plants divided in the 2 source systems | 8,000 | S4 HANA | 6,000 |
| WP2 | SAP ECC PF2 records for approximately 60 manufacturing plants divided in the 2 source systems | 25,000 | S4 HANA | 20,000 |
System Pre-defined Languages
N/A
N/A
N/A
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach. The target is on the transformation rules. This list includes what type of field, length and others.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| MARC | AUSME | AUSME | Unit of issue | UNIT | 3 | C |
| MARC | FRTME | FRTME | Production unit | UNIT | 3 | C |
| MARC | MMSTA | MMSTA | Material Status | CHAR | 2 | R |
| MARC | MMSTD | MMSTD | Valid From | DATS | 8 | R : If MARC-MMSTA is filled this field is required |
| MARC | FEVOR | FEVOR | Prodn Supervisor | CHAR | 3 | R |
| MARC | LGPRO | LGPRO | Storage Location | CHAR | 4 | R |
| MARC | SFCPF | CO_PRODPRF | Prod. Sched. Profile | CHAR | 6 | R : Mapping with As Is values and to be values to be provided |
| MARC | MATGR | MATNRGROUP | Mat. Grouping | CHAR | 20 | NU |
| MARC | SERNP | SERAIL | Serial Number Profile | CHAR | 4 | NU |
| MARA | SERLV | SERLV | SerLevel | CHAR | 1 | NU |
| MARC | OCMPF | OCM_GPROFILE | Overall profile | CHAR | 6 | NU |
| MARC | KZKRI | KZKRI | Indicator: Critical part | CHAR | 1 | NU |
| MARC | KZECH | KZECH | Batch entry | CHAR | 1 | R : Empty is a valid value |
| MARA | XCHPF | XCHPF | Batch Management Requirement Indicator | CHAR | 1 | R : Empty is a valid value |
| MARC | INSMK | INSMK | Post to Inspection Stock | CHAR | 1 | R : Empty is a valid value |
| MARA | XGCHP | XGCHP | Approved Batch Record Required | CHAR | 1 | NU |
| MARC | XCHPF | XCHPF | Batch Management Requirement Indicator for Plant | CHAR | 1 | R : Empty is a valid value |
| MARC | UNETO | UNETO | Underdel. Tol. | DEC | 3 | NU |
| MARC | UEETO | UEETO | Overdeliv. Tol. | DEC | 3 | NU |
| MARC | UEETK | UEETK | Indicator: Unlimited Overdelivery Allowed | CHAR | 1 | NU |
| MARC | RUEZT | RUEZT | Setup time | DEC | 5 | NU |
| MARC | TRANZ | TRANZ | Interoperation | DEC | 5 | NU |
| MARC | DZEIT | DZEIT | In-house production time | DEC | 3 | NU |
| MARC | BEARZ | BEARZ | Processing time | DEC | 5 | NU |
| MARC | BASMG | BASMG | Base quantity | QUAN | 13 | NU |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 01 | CNV-01 | Material is not an "E" Procurement type | Materials with "E" Procurement needs to have Work Scheduling View | Materials with no "E" procurement are out of scope | PF2/WP2 |
| 02 | CNV-02 | Production Scheduling Profile is missing | Materials with WS View in Material Master must have Production Scheduling Profile | Materials with no Prod. Sched Profile needs to be updated by the business | PF2/WP2 |
| 03 | CNV-03 | Production Supervisor is Missing | Materials with WS view and No Prod Supervisor filled, needs to be checked by the Business | Prod Supervisor has been updated for all relevant materials | PF2/WP2 |
| 04 | CNV-04 | Production Storage Location is missing | Materials with WS view need to have Production Storage location defined | Material without Prod Storage Location needs to be updated for all relevant materials | PF2/WP2 |
| 05 | CNV-05 | Production Version is missing | Materials with WS view needs to have a PV | Report to show Proc Type E, WS view, w/o PV flag | PF2/WP2 |
| 06 | CNV-06 | Work Scheduling View is missing | Materials with MARC-BESK = E but <> "A" as MARC status | No Procurement type E has no Work Scheduling View | PF2/WP2 |
The high-level process is represented by the diagram below:

Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract from MARC all Material/Plant relevant as Procurement Type E, and be updated as "A" means that the Work Scheduling view is updated | Sinity / Data Team |
2 | Extract data from source system based on relevancy rule | SyWay Data Team |
3 | Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
| 4 | Sinity will extract data and convert it into SQL data base ad share with the team | Sinity team |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| N/A | NO DCT required |
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Data Profiling. MARC table Data Profiling needs to happen before the extraction of data. | Sinity |
| 2 | Data Cleansing Reports need to be created | Sinity |
| 3 | Data cleansing already done by the Business | Business / Data Team |
| 4 | Data has to be validated from the Business to get ready to extract from the source | Business / Data Team |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | <Add steps from Syniti Migrate here> | SyWay S2P Data Team |
2 | Review and Validate Error and Preload Reports | SyWay S2P Data Team |
3 | Generate Load Files | SyWay S2P Data Team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WQ2 | MARC | WERKS | PLANT | S/4 HANA | MARC | WERKS | PLANT | Follow the transformation rules of CNV-2010 |
| 1 | PF2/WQ2 | S_MARA | MATNR | Material Number | S/4HANA | S_MARA | MATNR | Material Number | Follow the rule as per Material Master Basic Views about creation for new Material Numbers CNV-2018 CNV-2010 Materials - General Plant Data / S.Loc Data |
| 2 | PF2/WQ2 | MARC | AUSME | Unit of issue | S/4HANA | MARC | AUSME | Unit of issue | Based from MARA UOM |
| 3 | PF2/WQ2 | MARC | FRTME | Production unit | S/4HANA | MARC | FRTME | Production unit | Value Mapping (Unit of issue for material /plant) |
| 4 | PF2/WQ2 | MARC | MMSTA | Material Status | S/4HANA | MARC | MMSTA | Material Status | Depending on the Configuration Workbook, But Only Active Materials Status can be updated /populated |
| 5 | PF2/WQ2 | MARC | MMSTD | Valid From | S/4HANA | MARC | MMSTD | Valid From | If MMSTA is filled, use the load date |
| 6 | PF2/WQ2 | MARC | LGPRO | Production Storage Location | S/4HANA | MARC | LGPRO | Production Storage Location | Value Mapping for Storage Location for Production |
| 7 | PF2/WQ2 | MARC | KZECH | Batch Entry | S/4HANA | MARC | KZECH | Batch Entry | Copy |
| 8 | PF2/WQ2 | MARC | XCHPF | Batch Management | S/4HANA | MARC | XCHPF | Batch Management | Copy |
| 9 | PF2/WQ2 | MARC | INSMK | Post to Inspection Stock | S/4HANA | MARC | INSMK | Post to Inspection Stock | Copy |
| 10 | PF2/WQ2 | MARC | FEVOR | Prodn Supervisor | S/4HANA | MARC | FEVOR | Prodn Supervisor | Value Mapping for Plant/Material / Prod Supervisor |
| 11 | PF2/WQ2 | MARC | SCHPF | Prod Sch Profile | S/4HANA | MARC | SCHPF | Prod Sch Profile | Values Mapping for Plant/Material/Prod Sch Profile |
| Mapping Table Name | Mapping Table Description |
|---|---|
Material Type | Mapping of legacy Material Types to target system value |
Material Group | Mapping of legacy Material Groups to target system value |
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Data cleansing must be finished and validated | SyWay MFG Data Team |
2 | Data Transformation load files need to be validated by the business at Plant Level | SyWay MFG Data Team |
| 3 | All Value Mapping files must be finished and aligned with the CS | SyWay MFG Data Team |
| 4 | All Data dependencies has to be finished. Any delay can bring delays on this |
| Task | Action |
|---|---|
Verify Record Count | SyWay MFG Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
Conversion Accuracy | SyWay MFG Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
| Task | Action |
|---|---|
| To check Data Accuracy checking count of records to load and loaded | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
| Task | Action |
|---|---|
| Data owners to grant that the records in the load files are okay and according with the rules and mappings | To check and validate the load files with all the transformation and mapping rules, to be signed off. |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Go to load file and pick 5 data registers, load manually without any tool. See what happens. If all okay, proceed with the next step. | SyWay MFG Data Team |
2 | Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay. | SyWay MFG Data Team |
3 | Proceed with the full load if steps one and two were succeed. | SyWay MFG Data Team |
4 | Validate few records loaded by accessing standard transactions from S/4HNA eg. MM03 | SyWay MFG Data Team |
5 | Generate post load report if step 5 is validated | SyWay MFG Data Team |
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| 001 | Production Scheduling Profile |
| 002 | Production Supervisor |
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
Verify Count | SyWay P2F MFG Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
| Task | Action |
|---|---|
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Material data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.