| Status | |
|---|---|
| Owner | |
| Stakeholders |
The purpose of this document is to define the conversion approach for Right of Use (ROU) assets Master and Transactional data in SyWay S/4 HANA. In ROU Fixed Assets migration both the master and transactional data will be migrated in one step. There will be only one SAP standard template which will be used for both the migration of the Master and Transactional data.
ROU Asset master consists of the following information:
The scope of this document covers the approach for converting active ROU Assets from Legacy Source Systems into S/4HANA following the Master Data Design Standard DD-FUN-050 Master Data Standard_1070-Fixed Assets (incl. Sub Assets)
There are 2 group go-live as below:
RE-FX Contracts will be migrated to respective group go live as described in Enterprise Structure Catalog - Google Sheets (worksheet 10. Company code).
The data from legacy system includes:
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | ROU Assets | 3,270 | S/4 HANA | Will be same as Source, unless any new Assets and/or deactivation of assets before Go-live |
| WP2 | ROU Assets | 1,044 | S/4 HANA | Will be same as Source, unless any new Assets and/or deactivation of assets before Go-live |
It was decided to apply approach below:
N/A
There are no legal requirements relevant to data migration of ROU Assets
N/A
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
ANLA | BUKRS | BUKRS | Company Code | CHAR | 4 | Mandatory |
ANLA | ANLN1 | ANLN1 | Main Asset number | CHAR | 12 | System generated number and mandatory |
ANLA | ANLN2 | ANLN2 | Asset sub-number | CHAR | 4 | System generated number and mandatory |
ANLA | ANLKL | ANLKL | Asset Class | CHAR | 8 | Mandatory |
ANLA | ZUJHR | DZUJAHR | Fiscal year in which first acquisition was posted | NUMC | 4 | Optional |
ANLA | ZUPER | DZUPER | Period in which first acquisition was posted | NUMC | 3 | Optional |
ANLA | ZUGDT | DZUGDAT | Asset value date of the first posting | DATS | 8 | Optional |
ANLA | AKTIV | AKTIVD | Asset capitalization date | DATS | 8 | Optional |
ANLA | DEAKT | DEAKT | Deactivation on | DATS | 8 | Optional |
ANLA | ORD41 | ORD41 | Evaluation group 1 | CHAR | 4 | Optional |
ANLA | ORD42 | ORD42 | Evaluation group 2 | CHAR | 4 | Optional |
ANLA | ORD43 | ORD43 | Evaluation group 3 | CHAR | 4 | Optional |
ANLA | ORD44 | ORD44 | Evaluation group 4 | CHAR | 4 | Optional |
ANLA | LIFNR | LIFNR | Account number of vendor (other key word) | CHAR | 10 | Optional |
ANLA | HERST | HERST | Manufacturer of asset | CHAR | 30 | Conditional |
ANLA | VMGLI | VMGLI | Property Classification Key | CHAR | 4 | Conditional |
ANLA | AIBN1 | AIBN1 | Original asset number or Original Group Asset number | CHAR | 12 | Mandatory |
ANLA | AIBN2 | AIBN2 | Original Sub-Asset | CHAR | 4 | Mandatory |
ANLA | AIBDT | AIBDT | Original Acquisition Date of AuC/ Transferred Asset | DATS | 8 | Optional |
ANLA | MENGE | AM_MENGE | Quantity | QUAN | 13 | Optional |
ANLA | MEINS | MEINS | Base unit of measure | UNIT | 3 | Conditional |
ANLA | INKEN | INKEN | Include asset in inventory list | CHAR | 1 | Mandatory |
ANLA | IVDAT | IVDAT_ANLA | Last Inventory on | DATS | 8 | Optional |
ANLA | INVZU | INVZU_ANLA | Inventory Note | CHAR | 15 | Optional |
ANLA | INVNR | INVNR_ANLA | Inventory Number | CHAR | 25 | Conditional |
ANLA | VBUND | RASSC | Company ID of Trading Partner | CHAR | 6 | Conditional |
ANLA | TXT50 | TXA50_ANLT | Asset description | CHAR | 50 | Mandatory |
ANLA | TXA50 | TXA50_MORE | Additional asset description | CHAR | 50 | Conditional |
ANLA | GDLGRP | GDLGRP | Evaluation group 5 | CHAR | 8 | Conditional |
ANLA | SERNR | AM_SERNR | Serial number | CHAR | 18 | Conditional |
ANLA | UMWKZ | AM_UMWKZ | Reason for Environmental Investment | CHAR | 5 | Conditional |
ANLB | AFABE | AFABE_D | Depreciation area | NUMC | 2 | Mandatory |
ANLB | AFABG | AFABG | Depreciation Start date | DATS | 8 | Optional |
ANLB | AFASL | AFASL | Depreciation Key | CHAR | 4 | Mandatory |
ANLB | NDJAR | NDJAR | Useful Life | NUMC | 3 | Optional |
ANLB | NDPER | NDPER | Useful Life (Period) | NUMC | 4 | Optional |
ANLB | SCHRW | SCHRW | Asset scrap value | CURR | 13 with 2 decimals | Conditional |
ANLB | SCHRW_PROZ | SCHRW_PROZ | Scrap value % | DEC | 14 | Conditional |
ANLB | ANLGR | ANLGR | Group asset | CHAR | 12 | Not used |
ANLZ | KOSTL | KOSTL | Cost Centre | CHAR | 10 | Mandatory |
ANLZ | PRCTR | PRCTR | Profit Centre | CHAR | 10 | System generated |
ANLZ | WERKS | WERKS_D | Plant | CHAR | 4 | Mandatory |
ANLZ | STORT | STORT | Location | CHAR | 10 | Optional |
ANLZ | RAUMN | RAUMNR | Room | CHAR | 8 | Optional |
ANLZ | KFZKZ | AM_KFZKZ | License Plate No. of Vehicle | CHAR | 15 | Optional |
ANLH | ANLHTXT | ANLHTXT | Asset main no. text | CHAR | 50 | Mandatory |
ANLZ | XSTIL | XSTIL | Asset shutdown indicator | CHAR | 1 | Optional |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
The high-level process is represented by the diagram below:
Summarize High-Level Process. Include diagrams, where applicable. Include information supporting details of Extract, Transform and Load specific to the Data Object
Extract data from a source into Syniti Migrate. There are 2 possibilities:
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
<Object> DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| Mapping Table Name | Mapping Table Description |
|---|---|
| Item # | Step Description | Team Responsible |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| Spot checks | Business should choose some ROU Assets and perform comprehensive checks of the fields in S/4 HANA. Recommended to verify sample data per company code and Asset class combination. |
| Conversion Accuracy | Verify that the ROU Assets in target S/4 HANA are loaded correctly via load program and validate post load reports using standard t.code AR01 from S/4 HANA. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.