| Status | |
|---|---|
| Owner | |
| Stakeholders | The business stakeholders involved in making, reviewing, and endorsing this decision. Type @ to mention people by name |
The purpose of this document is to define the conversion approach to upload Purchasing Categories into S/4 HANA as part of the Procurement Data Migration.
In S/4HANA, Purchasing Categories are a new concept used to classify the goods and services a company procures from its suppliers. One or more Material Groups can be assigned to a single Purchasing Category (the relationship between material group and Purchasing Category is n:1, not n:n). Suppliers may also be linked to multiple Purchasing Categories.
For example, a Purchasing Category such as “IT Services” may include Material Groups like "Software Licenses" and "Consulting Services". A supplier providing both software and consulting could therefore be connected to this Purchasing Category.
Supplier Segmentation and Preferred Supplier are captured per Purchasing Category, therefore they will be assigned in the purchasing category.
Supplier Segmentation, also referred to as supplier tiering, is the process of grouping suppliers into distinct categories. These categories are determined using a balanced assessment of how critical the supplier is to the organization, how much risk the relationship entails, and how the supplier has performed historically.
Creating and maintaining Purchasing Categories in S/4 HANA will be via the FIORI app "Manage Purchasing categories".
Link to MDS: DD-FUN- 050 Master Data Standard_1096-Category Strategies
Summarise how the data is currently utilized and set up in the legacy system/s and how object is intended to be represented in S/4, and any other relevant information
The scope of this document covers the approach for capturing data from Legacy Source Systems into S/4HANA following the Master Data Design Standard.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| DCT | All suppliers will be considered for inclusion | NN Purchasing Categories | S4H | NN Purchasing Categories |
The Purchasing Categories will be created in English, but multiple languages are supported. The following languages are allowed:
Not applicable.
Not applicable.
Not applicable.
With Functional input, document the technical design of the target fields that are in the scope of this document.
The technical design of the target for this conversion approach.
| Table | Field | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|
| General Screen Tab | |||||
| /SRMSMC/D_PUC_RT | NAME | Purchasing Category Description | CHAR | 60 | Required |
| /SRMSMC/D_PUC_PY | USERID | Purchaser Responsible | CHAR | 12 | Required |
| /SRMSMC/D_PUC_RT | INACTIVE | Inactive Status | CHAR | 1 | Conditional |
| /SRMSMC/D_PUC_RT | PURCATEG_VALID_TO | Purchasing category: Valid To | CHAR | 8 | Required |
| /SRMSMC/D_PUC_RT | PURCATEG_VALID_FROM | Purchasing category: Valid From | CHAR | 8 | Required |
| /SRMSMC/D_PUC_RT | CREA_UNAME | Created By | CHAR | 12 | Required |
| /SRMSMC/D_PUC_RT | CREA_DATE_TIME | Created On | DEC | 21 (Decimals 7) | Required |
| Suppliers Screen Tab | |||||
| /SRMSMC/D_PUC_PY | BUSINESSPARTNER | Business Partner | CHAR | 10 | Required |
| /SRMSMC/D_PUC_PY | SUPPLIERNAME | Name of Supplier | CHAR | 80 | System |
| /SRMSMC/D_PUC_PY | FORMATTEDADDRESS | Address | CHAR | 200 | System |
| /SRMSMC/D_PUC_PY | DOC_EMAIL | CHAR | 241 | System | |
| /SRMSMC/D_PUC_PY | SUPPLIER_SEGMENTATION | Supplier Segmentation | CHAR | 4 | Required |
| /SRMSMC/D_PUC_PY | PREFERRED_SUPPL | Preferred Supplier | CHAR | 1 | Required |
| /SRMSMC/D_PUC_PY | PARTY_ROLE_CODE | Role | CHAR | 3 | System |
| Team Screen Tab | |||||
| /SRMSMC/D_PUC_PY | PARTY_ID | ID | CHAR | 32 | Required |
| /SRMSMC/D_PUC_PY | FULLNAME | Name | CHAR | 80 | System |
| /SRMSMC/D_PUC_PY | DEPARTMENT | Department | CHAR | 40 | System |
| /SRMSMC/D_PUC_PY | PARTY_TYPE | Role | CHAR | 3 | Required |
| /SRMSMC/D_PUC_PD | TEXT | Role Description | CHAR | 60 | Conditional |
| Planned Spend Screen Tab | |||||
| /SRMSMC/D_PUCPSP | VALID_FROM | Planned Spend: Valid From | DATE | 8 | Conditional |
| /SRMSMC/D_PUCPSP | VALID_TO | Planned Spend: Valid To | DATE | 8 | Conditional |
| /SRMSMC/D_PUCPSP | AMOUNT | Planned Spend: Amount | CURR | 13 (Decimals 2) | Conditional |
| /SRMSMC/D_PUCPSP | CURRENCY | Currency | CUKY | 5 | Conditional |
| Attachments Screen Tab | |||||
| /BOBF/D_ATF_DO | NAME | File Name | CHAR | 255 | Conditional |
| /BOBF/D_ATF_DO | DESCRIPTION | File Description | CHAR | 64 | Conditional |
| /BOBF/D_ATF_DO | MIMECODE | File Type | CHAR | 128 | System |
| /BOBF/D_ATF_DO | DATETIME_CR | Uploaded On/At | DEC | 15 | System |
| Language Screen Tab | |||||
| /SRMSMC/D_PUCTRL | LANGUAGE_CODE | Language | LANG | 1 | Required |
| /SRMSMC/D_PUCTRL | TRANS_STATUS | Status of Translation | CHAR | 2 | Required |
| /SRMSMC/D_PUCNAM | NAME | Translated Description | CHAR | 60 | Required |
| Material Groups Screen Tab | |||||
| /SRMSMC/D_PUCMG | MATKL | Material Group | CHAR | 9 | Required |
| /SRMSMC/D_PUCMG | MATERIALGROUPNAME | Description | CHAR | 20 | System |
| /SRMSMC/D_PUCMG | MATERIALGROUPTEXT | Long Description | CHAR | 60 | System |
All data cleansing should take place in the data source system as defined in this document, unless system limitations prevent it.
If data cleansing is managed outside of the source system (e.g. Syniti Migrate, 3rd Party Vendor, DCT), the necessary documentation must be produced and appended to this deliverable for sign-off.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System | Syniti Report Required |
|---|---|---|---|---|---|---|
| 1 | High | Purchasing Category Does Not Have All Required Screen Tabs | A Purchasing Category must have at least 1 record in the following Screen Tabs: Supplier, Team, Planned Spend, Material Groups. A row will only be on the report if a Purchasing Group has 1 or more of the Screen Tabs with 0 records. | Purchasing Category Description (NAME), Count of Supplier, Count of Team, Count of Planned Spend, Count of Material Groups | DCT | Yes |
| 2 | High | Material Group Assigned to multiple Purchasing Categories | A Material Group can only be assigned to 1 Purchasing Category. A row will only be on the report of a Material Group is assigned to 2 or more Purchasing Category. | Material Group (MATKL), Description (MATERIALGROUPNAME), List of Purchasing Category Description (NAME) | DCT | Yes |
| 3 | Planned Spend Periods Overlap on Purchasing Category | Planned Spend Periods of A Purchasing Category Overlap. A row will only be on the report if: | Purchasing Category Description (NAME), VALID_FROM & VALID_TO of record A, VALID_FROM & VALID_TO of record B | DCT | Yes | |
The high-level process is represented by the diagram below:

The data does not exist as a complete set. It will be manually collected by the business directly in Syniti Migrate using DCT.
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from the DCTs. | Syniti |
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not applicable |
DCT Rules for the General Screen Tab: DCT-General
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| NAME | Purchasing Category Description | Mandatory | This field is the description of the purchasing category. For the Raw Materials category, it corresponds to the name of the Material Group Cluster (MGC). For all other categories it corresponds to the segment name. | ||
| USERID | Purchaser Responsible | Mandatory | This field is populated with the SAP user ID of the user responsible for the current purchasing category. | ||
| INACTIVE | Inactive Status | Default to Blank | This field is ticked when a purchasing category is inactive. | ||
| PURCATEG_VALID_FROM | Purchasing category: Valid From | Mandatory. Default to 0001.01.01 | Indicates the start of the validity period for the purchasing category. | ||
| PURCATEG_VALID_TO | Purchasing category: Valid To | Mandatory. Default to 9999.12.31 | Indicates the end of the validity period for the purchasing category. | ||
| CREA_UNAME | Created By | Mandatory. | This field contains the SAP user ID of the purchasing category creator from the legacy system (Convergence). | ||
| CREA_DATE_TIME | Created On | Mandatory. | This field contains the creation date of the purchasing category from the legacy system (Convergence). |
DCT Rules for the General Screen Tab: DCT-Suppliers
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the suppliers to the purchasing category. | ||
| BUSINESSPARTNER | Business Partner | Mandatory. Use Check Table BUT00 | This field is populated with the suppliers that are assigned to this purchasing category. | ||
| SUPPLIER_SEGMENTATION | Supplier Segmentation | Mandatory. Dropdown containing: 0001-Critical Supplier 0002-Regular Supplier 0003-Tail-End Supplier | Indicates the supplier tiering. | ||
| PREFERRED_SUPPL | Preferred Supplier | Mandatory. Dropdown containing: X-Yes <Blank>-No | Indicates if the Supplier is a preferred supplier for the current purchasing category. | ||
| PARTY_ROLE_CODE | Role | Default to 2-Supplier |
DCT Rules for the General Screen Tab: DCT-Team
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the team to the purchasing category. One or many team members must be assigned to a purchasing category. A team member can belong to multiple purchasing category. | ||
| PARTY_ID | ID | Mandatory | This field contains the SAP user ID of the team member. | ||
| PARTY_TYPE | Role | Mandatory. Dropdown containing: 190-Member 100-Internal Stakeholder | Contain either the value "Member" or "Internal Stakeholder". | ||
| TEXT | Role Description | Enter a description or any other comments that may be useful regarding the team member entered. |
DCT Rules for the General Screen Tab: DCT-PlannedSpend
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the planned spend to the purchasing category. One or many planned spends must be assigned to a purchasing category, split by period. | ||
| VALID_FROM | Planned Spend: Valid From | The start date of the period during which the planned spend is valid. | |||
| VALID_TO | Planned Spend: Valid To | The end date of the period during which the planned spend is valid. | |||
| AMOUNT | Planned Spend: Amount | The planned amount to be spent during the defined validity period. | |||
| CURRENCY | Currency | Dropdown using TCURT-WAERS, TCURT-LTEXT for SPRAS = E | The currency of planned amount to be spent. |
DCT Rules for the General Screen Tab: DCT-Attachments
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the PDF documents to the purchasing category. Zero or many PDF documents can be attached to a purchasing category. | ||
| NAME | File Name | C | The file name of the uploaded PDF document. | ||
| DESCRIPTION | File Description | C | The description of the uploaded PDF document. | ||
| ? FILE_LINK ? | ? Uploaded File Link ? | ?? | ? The link to document attached to the purchasing category. ? | ||
| MIMECODE | File Type | Read only. Default to PDF | Set to PDF because only PDF documents are allowed. | ||
| DATETIME_CR | Uploaded On/At | Mandatory | The date and time of uploading the file. |
DCT Rules for the General Screen Tab: DCT-Languages
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the Descriptions in other languages to the purchasing category. Zero or many Descriptions in other languages can be assigned to a purchasing category. | ||
| LANGUAGE_CODE | Language | Mandatory. Dropdown using (T002-LAISO) and (T002T-SPTXT where SPRAS = E) | The language into which the original purchasing category description is translated into. | ||
| TRANS_STATUS | Status of Translation | Mandatory. Dropdown containing: 01-To Be Translated 03-Translated Default to 03-Translated. | The status of the translation for the purchasing category description in the specified language. | ||
| NAME | Translated Description | Mandatory | The purchasing category description translated into the language specified in the field Language. Each defined language requires its own translated description. |
DCT Rules for the General Screen Tab: DCT-MaterialGroups
| Field Name | Field Description | Rule | Tool Tip | zComment | zDelete |
|---|---|---|---|---|---|
| DCT-General - NAME | Purchasing Category Description | Mandatory | Linking the Material Groups to the purchasing category. One or many Material Groups must be assigned to a purchasing category. | ||
| MATKL | Material Group | Mandatory. Dropdown using T023. | The Material Group Code (MGC) assigned to the purchasing category. A MGC belongs to only one purchasing category. | ||
List the steps that need to occur before extraction can commence
| Item # | Step Description | Team Responsible |
|---|---|---|
| Not applicable |
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Verify that the Suppliers XREF has been updated | Syniti |
| 2 | Verify that the Material Groups XREF has been updated | Syniti |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-General | NAME | Purchasing Category Description | S4 | /SRMSMC/D_PUC_RT | NAME | Purchasing Category Description | Copy As-Is |
| 2 | DCT | DCT-General | USERID | Purchaser Responsible | S4 | /SRMSMC/D_PUC_PY | USERID | Purchaser Responsible | Copy As-Is |
| 3 | DCT | DCT-General | INACTIVE | Inactive Status | S4 | /SRMSMC/D_PUC_RT | INACTIVE | Inactive Status | Copy As-Is |
| 4 | DCT | DCT-General | PURCATEG_VALID_TO | Purchasing category: Valid From | S4 | /SRMSMC/D_PUC_RT | PURCATEG_VALID_TO | Purchasing category: Valid From | Copy As-Is |
| 5 | DCT | DCT-General | PURCATEG_VALID_FROM | Purchasing category: Valid To | S4 | /SRMSMC/D_PUC_RT | PURCATEG_VALID_FROM | Purchasing category: Valid To | Copy As-Is |
| 6 | DCT | DCT-General | CREA_UNAME | Created By | S4 | /SRMSMC/D_PUC_RT | CREA_UNAME | Created By | Copy As-Is |
| 7 | DCT | DCT-General | CREA_DATE_TIME | Created On | S4 | /SRMSMC/D_PUC_RT | CREA_DATE_TIME | Created On | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-Suppliers | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-Suppliers | BUSINESSPARTNER | Business Partner | S4 | /SRMSMC/D_PUC_PY | BUSINESSPARTNER | Business Partner | Copy As-Is |
| 3 | DCT | DCT-Suppliers | SUPPLIERNAME | Name of Supplier | S4 | /SRMSMC/D_PUC_PY | SUPPLIERNAME | Name of Supplier | Business Partner from table BUT00 |
| 4 | DCT | DCT-Suppliers | FORMATTEDADDRESS | Address | S4 | /SRMSMC/D_PUC_PY | FORMATTEDADDRESS | Address | Business Partner from table ADRC |
| 5 | DCT | DCT-Suppliers | DOC_EMAIL | S4 | /SRMSMC/D_PUC_PY | DOC_EMAIL | If it is maintained in the partner function CP of the Business Partner. | ||
| 6 | DCT | DCT-Suppliers | SUPPLIER_SEGMENTATION | Supplier Segmentation | S4 | /SRMSMC/D_PUC_PY | SUPPLIER_SEGMENTATION | Supplier Segmentation | Copy As-Is |
| 7 | DCT | DCT-Suppliers | PREFERRED_SUPPL | Preferred Supplier | S4 | /SRMSMC/D_PUC_PY | PREFERRED_SUPPL | Preferred Supplier | Copy As-Is |
| 8 | DCT | DCT-Suppliers | PARTY_ROLE_CODE | Role | S4 | /SRMSMC/D_PUC_PY | PARTY_ROLE_CODE | Role | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-Team | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-Team | PARTY_ID | ID | S4 | /SRMSMC/D_PUC_PY | PARTY_ID | ID | Copy As-Is |
| 3 | DCT | DCT-Team | FULLNAME | Name | S4 | /SRMSMC/D_PUC_PY | FULLNAME | Name | Concat of first and last names of User ID in PARTY_ID. |
| 4 | DCT | DCT-Team | DEPARTMENT | Department | S4 | /SRMSMC/D_PUC_PY | DEPARTMENT | Department | Based on User ID in PARTY_ID. |
| 5 | DCT | DCT-Team | PARTY_TYPE | Role | S4 | /SRMSMC/D_PUC_PY | PARTY_TYPE | Role | Copy As-Is |
| 6 | DCT | DCT-Team | TEXT | Role Description | S4 | /SRMSMC/D_PUC_PD | TEXT | Role Description | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-PlannedSpend | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-PlannedSpend | VALID_FROM | Planned Spend: Valid From | S4 | /SRMSMC/D_PUCPSP | VALID_FROM | Planned Spend: Valid From | Copy As-Is |
| 3 | DCT | DCT-PlannedSpend | VALID_TO | Planned Spend: Valid To | S4 | /SRMSMC/D_PUCPSP | VALID_TO | Planned Spend: Valid To | Copy As-Is |
| 4 | DCT | DCT-PlannedSpend | AMOUNT | Planned Spend: Amount | S4 | /SRMSMC/D_PUCPSP | AMOUNT | Planned Spend: Amount | Copy As-Is |
| 5 | DCT | DCT-PlannedSpend | CURRENCY | Currency | S4 | /SRMSMC/D_PUCPSP | CURRENCY | Currency | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-Attachments | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-Attachments | NAME | File Name | S4 | /BOBF/D_ATF_DO | NAME | File Name | Copy As-Is |
| 3 | DCT | DCT-Attachments | DESCRIPTION | File Description | S4 | /BOBF/D_ATF_DO | DESCRIPTION | File Description | Copy As-Is |
| 4 | DCT | DCT-Attachments | ? FILE_LINK ? | ? Uploaded File Link ? | S4 | ? FILE_LINK ? | ? Uploaded File Link ? | Copy As-Is | |
| 5 | DCT | DCT-Attachments | MIMECODE | File Type | S4 | /BOBF/D_ATF_DO | MIMECODE | File Type | Copy As-Is |
| 6 | DCT | DCT-Attachments | DATETIME_CR | Uploaded On/At | S4 | /BOBF/D_ATF_DO | DATETIME_CR | Uploaded On/At | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-Languages | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-Languages | LANGUAGE_CODE | Language | S4 | /SRMSMC/D_PUCTRL | LANGUAGE_CODE | Language | Copy As-Is |
| 3 | DCT | DCT-Languages | TRANS_STATUS | Status of Translation | S4 | /SRMSMC/D_PUCTRL | TRANS_STATUS | Status of Translation | Copy As-Is |
| 4 | DCT | DCT-Languages | NAME | Translated Description | S4 | /SRMSMC/D_PUCNAM | NAME | Translated Description | Copy As-Is |
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | DCT-MaterialGroups | DCT-General - NAME | Purchasing Category Description | S4 | Link to Purchasing Category | |||
| 2 | DCT | DCT-MaterialGroups | MATKL | Material Group | S4 | /SRMSMC/D_PUCMG | MATKL | Material Group | Copy As-Is |
| 3 | DCT | DCT-MaterialGroups | MATERIALGROUPNAME | Description | S4 | /SRMSMC/D_PUCMG | MATERIALGROUPNAME | Description | T023T-WGBEZ based on MATKL and SPRAS = 'E'. |
| 4 | DCT | DCT-MaterialGroups | MATERIALGROUPTEXT | Long Description | S4 | /SRMSMC/D_PUCMG | MATERIALGROUPTEXT | Long Description | T023T-WGBEZ60 based on MATKL and SPRAS = 'E'. |
| Mapping Table Name | Mapping Table Description |
|---|---|
| Material Group | AAA |
| Item # | Step Description | Team Responsible |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
The load process includes:
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Identify the phase as to “when” the load for this object will occur. <Pre-Cutover, Cutover, Post Cutover> and list the steps that need to occur before the load can commence
List the Configurations required before loading can commence
| Item # | Configuration Item |
|---|---|
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
The table below depicts some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management
| Error Type | Error Description | Action Taken |
|---|---|---|
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
| Task | Action |
|---|---|
| title | specific details of what and how the task needs to be performed e.g. which reports are being used etc. |
Any additional key assumptions.
Insert links and references to other documents which are relevant when trying to understand this decision and its implications. Other decisions are often impacted, so it's good to list them here with links. Attachments are also possible but dangerous as they are static documents and not updated by their authors.