1/ Definition
The number of PSS and their impact permit to :
- Check that the feedback and the continuous improvement loop is well done
- Check if the feedback and the continuous improvement loop has a utility
- Verify the impact of the actions taken after the PSS
2/ Objective / Target
The goal is to have actions which have an impact on the problems detected thanks to the PSS
An action without impact on an identified problem after a PSS analysis should be record in order to improve the PSS sessions.
3/ Formula
See 5/ Calculation example
4/ Frequency
Monthly
5/ Calculation example
This indicator is calculated manually thanks to the excel file below (figure 1).
As a example, Rheinberg decided to create its own calculation rules (see figure 2) which permit to fill the excel file.
Then it's displayed in MECANO (see figure 3).
Figure 1
Figure 2
Figure 3
The best way to get IT support is to use the new
Service One Platform.