I validate the result of the calculation of the ML 


Scope

WW
PF2
Frequency

  Monthly
References

Attachments

N/A

 << I validate the result of the calculation of the ML >> 



  Guideline  

 After the Post Closing of Material Ledger, a report should be retrieved from the log of Single Level Pr. Determination and Multilevel Pr. Determination to be sent to controllers.

For each one of this two steps, click on  in column Log:

Double click in the red line related to the log

Click in the Warning Messages

The log is displayed

Extract the information to an excell file and send it to the Controller.