The costing should be marked and the release scheduled after validation of the FRA on D-1 - 12pm
Guideline
The FRA must send by D-1 - 12pm its validation
Check Point
After completing the first 4 steps, the plant controller should analyze if the standard prices are correct and correct eventual errors. The next steps “Marking” and “Release” are only performed after plant controller approval. Before the marking, the first 4 steps can always be executed as much times as needed and must be repeated after controllers corrections to confirm that the errors were solved.
You can go to the step "Marking" when you receive the approval of the FRA
All error & warning messages are cleared (in some cases it is not possible to clear warning messages but at least a deep analysis must be performed)
STEP 1
Click on the icon column « Authorization » / line « Marking » to unlock the padlock.
STEP 2
All the company appear: when there is a green square, the padlock is open, if the square is red, the padlock is closed.
Click on the company code you want to open and save
There is a green square the costing in the company 6577 can be marked & released
Go back by clicking
STEP 3
The padlock is open
The cycle can continue with the marking. Click on the icon of column Parameter on the line Marking.
STEP 4
Uncheck the test mode.
Uncheck "Background Processing"
Save and go back by clicking
STEP 5
Click onin the column Execute / line Marking
Check Start Immediately
Click on
The screen "Background Print Parameters" appear, click on
STEP 6
After the Marking step is finished, all the materials should be valuated.
We should not have materials "still open".
Still Open" Materials?
1. Go to CK40N (Edit mode), of the respective Costing run 5835SCE & Date
2. Enter the =CKSU in T-CODE command bar
3. Press enter.
Then, this message will appear and the error will be resolved.
NOTE:
If you have errors, you must identify them by checking the "Log".
The errors should be checked and rectified if possible in the current month. To avoid the same to happen on the next costing run.
STEP 1
The cycle continues with the validation. Click on the icon in the column Parameter / line Release
STEP 2
Uncheck "Test run"
Check "With list output"
Uncheck "Parallel Processing"
Check "Background Processing"
Save and go back by clicking
STEP 3
Click onin the column "Execute" / line "Release"
Enter the starting date and time
The costing is planned to be released the 1st day of the month during the night. The time depends on the company code.
STEP 4
Check at D1 if the job run:
In SM37;
And inside of CK40N in Log.
On D1, the first thing to do is to check that the costing was released during the night
STEP 1
Open the costing run using the message in the CK40N
Click on in the column « Log » / line « Release »
STEP 2
Check that all cost estimates were updated successfully.