- Created by Alexandra Lepercq, last modified by ROLLIER, Charlotte on May 09, 2016
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 12 Next »
IAC Internal controls
Inventory and Costing (IAC) internal controls are addressing risk related to physical inventory, inventory valuation and manufacturing fixed and variable cost of sales.
![]()
FRA
Finance Responsible Assigned
GCCO
Global Costing Control Owner
RCOM
Regional Costing Manager
![]()
-
Page:Costing Model - FRA preparation — Costing Model - FRA preparation
-
Page:OP.106 — IAC 01.02. Variance analysis
-
Page:OP.107 — IAC.03.07. Critical inventory movements
-
Page:OP.109 — IAC.02.06. Slow turn inventory reserve
-
Page:OP.112 — IAC.02.03. Physical inventory
-
Page:OP.114 — IAC.02.07. Inventory reserve
-
Page:IAC 01.01. Costing model validation — IAC 01.01. Costing model validation
![]()
-
Page:Costing Model - FRA preparation — Costing Model - FRA preparation
-
Page:OP.106 — IAC 01.02. Variance analysis
-
Page:OP.107 — IAC.03.07. Critical inventory movements
None
None
There is no content with the specified labels
None
None
There is no content with the specified labels
None
None
There is no content with the specified labels
None
None
There is no content with the specified labels
None
None
None
None
None
None
None
None
There is no content with the specified labels
None
None
-
Page:IAC 01.01. Costing model validation — IAC 01.01. Costing model validation
- No labels