Page tree


Even though these alerts could be used to have a starting overview of new Sites for P&I, they are more intended for Sites who have already gone in the past though the methodology, because they are based on the "SHS" and "Catalog LT" (which are themselves output of the P&I process <=> for new sites they are still to be defined).

(Please compare to the case of Control checks #1 & #2 which are supposed to be checked Before P&I).


ScreenExplanations
Control Check #3: for MTS SKUs, ATP check shouldn't consider RLT

Alert showing the list of MTS SKUs whose ATP check considers TRLT

The ATP Code is coming from MRP View in SAP

Control Check #4: for SKUs MTO-FB, at least Min lot size or Fixed lot size should be defined in SAPAlert showing the list of MTO-FB SKU which don’t have neither Min lot size nor Fixed lot size defined in SAP.

Note:  these alerts are mostly meant for Sites which had already gone through P&I (after P&I results have been uploaded back to SAP): to double check the consistency of SAP data vs what was defined in P&I DynaSys).
However, they can still be be used at the beginning of P&I process: like a warning to highlight the cases where Catalog LT is not consistent with the current SHS (that might need more attention later).

>

The best way to get IT support is to use the new Service One Platform.