Dynasys KPIExplanations
Current SHSStock Holding Strategy from SAP
Proposed SHSStock Holding Strategy proposed by Dynasys on the decision tree
ReasonReason of the proposed SHS
Future Demand

Future demand on the next 12 months =

Future demand = Grosse requirement = Independent (External + Internal) + Dependent requirements (from validated during the last S&OP Validation for Novecare)


The dependent requirement is based on the BOM in DIP-PP (from SAP for Novecare / Manual update for TS for the moment).

Future Demand (average next 3 months)

Average of the demand on the next 3 months

Demand = Gross Requirements = Independent (External + Internal) + Dependent requirements

Batch Size P&I

Batch size final.

The batch size from SAP can be override on the tab "Batch Size", if it the case it will be the one take into account:

Past Demand Average

Past demand Average based on Independent demand (Internal + External) + Actual consumption

On the last 12 months.

Batch size / AWD= Batch Size P&I / Past Demand Average
Safety stock proposed

Safety Stock calculated based on the SHS proposed

Cycle Stock proposed

Cycle Stock calculated based on the SHS proposed

Target stock proposed

Target Stock calculated based on the SHS proposed

Corridor Max StockMax Stock = Safety Stock + 2 * Cycle Stock (based on the current SHS)
Intransit ETA from SAPIntransit on the future from SAP
Baseline

Actual Planning Inventory for a given month (the user can choose by using the shortcut the baseline month) =

End of Month quality inventory

+ End of Month unrestricted customer inventory

+ End of Month unrestricted inventory

+ End of Month unrestricted vendor inventory

Baseline valueBaseline converted to value (€)
Last 3 months average stock

Average of the last 3 months inventories:

End of Month quality inventory

+ End of Month unrestricted customer inventory

+ End of Month unrestricted inventory

+ End of Month unrestricted vendor inventory

Last 3 months average stock valueAverage Inventories last 3 months converted to value (€)
Average Inventories last 3 monthsAverage of the last 3 months of the End of Month unrestricted inventory
WC impact value

WC impact value (€) =

Average next 3 months value (€) - Baseline value (€)

SHS RLTReplenishment Lead Time calculated by Dynasys according to the BOMs
Mono Level RLT 
  • If the SKU is purchased, Mono Level RLT =

Procurement processing LT from SAP (but can be override)

+ Procurement LT from SAP (but can be override)

+ Quality LT from SAP (but can be override)


  • If the SKU is produced, Mono Level RLT = 

Production LT from SAP (but can be override)

+ Quality LT from SAP (but can be override)

CLT Agreed 
Status

User input, you can choose on the list according to your review:

  • Batch Size review (MOQ)
  • Batch Size review (Plant)
  • Challenge Target Stock
  • Complete
  • Lead time review
  • Not yet reviewed
Validate SHSThe user can tick this box if he wants to use the Proposed SHS calculated by Dynasys
SHS validated

If the box Validate is:

  • ticked then SHS validated = Proposed SHS
  • unticked than SHS validated = Current SHS
Safety Stock validated Safety Stock based on the validated SHS
Cycle Stock validatedCycle Stock based on the validated SHS
Target Stock validatedTarget Stock based on the validated SHS
DIOH Calculation Target validated

DIOH calculated based on the target validated


DIOH Min Target validated 

DIOH Min based on the safety stock validated


DIOH calculation baseline

DIOH Calculation based on the baseline =

(Baseline Inventory volume) * 365 / (Total Future Demand Volume of Next 3 months end*4)

DIOH calculation inventory M-1

DIOH Calculation based on the inventory of M-1 =

(M-1 Inventory volume) * 365 / (Total Future Demand Volume of Next 3 months end*4)

SMOG

The best way to get IT support is to use the new Service One Platform.