| Status | Approved |
|---|---|
| Owner | |
| Stakeholders |
Purpose
The purpose of this document is to define the conversion approach to load Maintenance Plan Start in order to Start the Maintenance Plans in S/4 HANA.
The purpose of the Maintenance Plan Start is to initiate the creation of Work Orders based on the criteria specified in the Maintenance Plans.
Maintenance Plans for Syensqo are defined with the purpose of:
- Preventive Plans - Used for Time Based and Condition based Preventive Maintenance with a defined Strategy
- Shutdown Plans - Shutdown Plans with a Defined Strategy
Conversion Scope
The conversion scope covers the approach for loading Maintenance Plan Start in S/4 HANA system.
The data from legacy system includes:
- All relevant Maintenance Plans (MPLA.WARPL)
The data from legacy system excludes:
- Inactive Maintenance Plans ((System Status TJ02T-TXT04 = INAC)
- Maintenance Plans (MPLA.WARPL) to be Excluded (Exclusion List Mapping: EXC-Maintenance Plan Start) from getting Started
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2, WP2 | Relevant Maintenance Plan for Maintenance Plan Start will be extracted from PF2 and WP2. Enrichment of in-scope data may be required and will be added via transformation rules. | 70,000 | S/4 HANA | 70,000 |
| DCT | Maintenance Plan for Maintenance Plan Start for plants which do not have data existing from PF2 and WP2 | TBD | S/4HANA | TBD |
Additional Information
Multi-language Requirement
Not Applicable
Document Management
Not Applicable
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| MPLA | WARPL | WARPL | Maintenance Plan Identifier | CHAR | 12 | Mandatory |
| MPLA | STADT | STADT | Start Date for Scheduling | DATS | 8 | |
| MPLA | STIME | Start Time for Scheduling | TIMS | 6 | ||
| MPLA | SZAEH | SZAEHC | Start counter reading | CHAR | 22 | |
| MPLA | LRMDT | Date of Last Completion in Maintenance Plan | ||||
| MPLA | CONF_TIME | Completion Time of Call | ||||
| MPLA | ZYKLOFFSET | Offset with Start in Cycle | Mandatory | |||
| MPLA | ZYKLUNIT | Unit for the Performance of Maintenance Tasks | ||||
| MPLA | RZAEH | Completion Counter Reading | ||||
| MPLA | CYCLESEQIND | Cycle Set Sequence | ||||
| MPLA | SETREPEATIND | Repeat Factor for Cycle Set Sequence | ||||
| MPLA | KEEP | Keep Calls on Hold (KEEP=X) or Delete Calls on Hold (KEEP=' ') Default Value |
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
PF2, WP2 |
Note: List of Cleansing is maintained here: Conversion Specs Register (DCT & Cleansing Report)
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
- Syniti Migrate connects to the sources.
- An initial extract of the relevant Maintenance Plan Start data will be loaded into a google sheet report to assist business with any standardization.
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
| 2 | Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Exclusion List of Maintenance Plans to be Started | |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
| Verify Record Count | SyWay A2D Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | SyWay A2D Data Team to verify that all fields below meet pass the checks:
|
| Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the EAM Maintenance Plant Start data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Business
Completeness
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the EAM Maintenance Plant Start data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Maintenance Plant Start is in scope based on data design and any exception requested by business.