1/ Definition
This Metric is composed by 3 figures: each week, the snapshot calculates 3 figures around the Maintenance Plans managed in SAP
% Respect of Maintenance Plan completed the Last week
Number of Maintenance Plan to be completed during the Current week
Rate of Delay on Maintenance Plans (1-30 days, 31 to 90 days, > 90days)
2/ Objective / Target
To be defined by site
3/ Formula
∑ Work Orders issued from a Preventive Maintenance Plan Completed* in Time / ∑ Works issued from a Preventive Maintenance Plan Planned* for the last week
∑ Call, Notifications or Work Orders issued from a Maintenance Plan with the Planned Date in the current week.
∑ Maint. Plans with Due Date (Planned Date or Required end date) < Snapshot extraction date*The Delay is spread over 4 categories :
Further Explanations
|
|---|
4/ Frequency
Weekly
5/ SAP extraction and Detailed calculation
For every Work issued from a Maintenance Plan completed the last week, the system compares the earliest date found on a Closing status* on the Work Order (GS45 or GS50 or GS55 or 6CMP or CNF or Reference date of the TECO), against the Required End date of the Notification OR against the Planned Date of the Call if there is no Notification.
*NB: This rule is the same used in the 2.12 Respect of Notification date, for Work order NOT issued from a Maintenance Plan
Field name | From | To | I/E | ||
WO "Closing" Status: GS45 or GS50 or GS55 or 6CMP or CNF or Reference date of the TECO of the WO | Monday (W-1) | Sunday(W-1) | I | ||
Only Work Orders from Maintenance Plan | I | ||||
6/ Examples in QV and BW
% Respect of Maintenance Plans for the last week and & Number of Maintenance Plans for the current week
in BW Analytical Reporting
The BW Analytical report can be displayed from an aggregated level to a very detailed level, by Work orders. For example, you can extract the list of Maintenance plans with the detailed Work Orders and/or Notifications that were completed or not during the selected week (Column "Planned Activity Executed" = "1" if Executed or blank if NOT executed)
Case 1 : Maintenance Plan is executed the week it was planned
example with a Due Date of the Maintenance Plan = Required End Date of the notification
Case 2 : Maintenance Plan is NOT executed the week it was planned
example with a Due Date of the Maintenance Plan = Planned Date (as the Required End Date of the notification is blank)
Rate of Delay
QlikView layout
Viewing data in # of calls
Viewing data in Actual Hours Executed