Purpose

The purpose of this document is to define the conversion approach to load Maintenance Plan Start object in order to Start the Maintenance Plans in S/4 HANA.

The purpose of the Maintenance Plan Start is to initiate the creation of Work Orders based on the criteria specified in the Maintenance Plans.

Maintenance Plans for Syensqo are defined with the purpose of:

  • Preventive Plans - Used for Time Based and Condition based Preventive Maintenance with a defined Strategy
  • Shutdown Plans - Shutdown Plans with a Defined Strategy

Conversion Scope

The conversion scope covers the approach for loading Maintenance Plan Start object in S/4 HANA system.

The data from legacy system includes:

  1. All relevant Maintenance Plans (MPLA.WARPL)

The data from legacy system excludes:

  1. Inactive Maintenance Plans ((System Status TJ02T-TXT04 = INAC)
  2. Maintenance Plans (MPLA.WARPL) to be Excluded (Exclusion List Mapping: EXC-Maintenance Plan Start) from getting started 


List of source systems and approximate number of records

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Relevant Maintenance Plan for Maintenance Plan Start will be extracted from PF2 and WP2, excluding the records which require business decision, which include the following scenarios (not exhaustive):

  • Legacy Strategy Plans > S/4 Strategy Plans (with no further enrichment in the items and packages)
  • Legacy Single Cycle Plans > S/4 Strategy Plans (with only 1 package assigned)
70,000S/4 HANA70,000
DCT

Maintenance Plan for Maintenance Plan Start for plants which do not have data existing from PF2 and WP2

TBDS/4HANA TBD
DCT

Relevant Maintenance Plan for Maintenance Plan Start will be extracted from PF2 and WP2 which require business decision, which may fall under the following example scenarios (not exhaustive):

  • Maintenance Plans in legacy without scheduled calls all the way to the Business Continuity Cutoff Date
  • Legacy Single Cycle Plans > S/4 Strategy Plans  (with more than 1 package assigned)
  • Legacy Strategy Plans > S/4 Strategy Plans (with enrichment in the items and packages)
TBDS/4HANA TBD

Additional Information

Multi-language Requirement

Not Applicable

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable

Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
MHISWARPLWARPLMaintenance Plan IdentifierCHAR12Mandatory
MHISLRMDTLRMDTDate of Last Completion in Maintenance PlanDATS8Conditional
MHISOFFZEOFFZEOffset with Start in CycleFLTP16Conditional
MHISADUNITDZEIEHUnit for the Performance of Maintenance TasksCHAR3Conditional
MHISRZAEHRZAEHCompletion Counter ReadingFLTP16Conditional
-KEEP-Keep Calls on Hold (KEEP=X) or Delete Calls on Hold (KEEP=' ') Default ValueCHECKBOX1Conditional


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System
9001-001C1

Relevant and Active Maintenance Plan not scheduled until Business Continuity Cutoff Date.

Set the Maintenance Plan to Inactive if not required to be started.

Business Continuity Cutoff Date is defined by parameter (MHIS-NPLDA).

Based on all the relevant and active Maintenance Plans in MHIS table, identify what is the latest Plan Date (MHIS-NPLDA). If the date is before the Business Continuity Date parameter, this is an error.

Maintenance Plan, Latest Plan Date

PF2, WP2

Note: List of Cleansing is maintained here: Conversion Specs Register (DCT & Cleansing Report)




Conversion Process

The high-level process is represented by the diagram below:

Data Privacy and Sensitivity


Extraction

  1. Syniti Migrate connects to the sources.
  2. An initial extract of the relevant Maintenance Plan Start data will be loaded into a google sheet report to assist business with any standardization.

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleSyWay Data Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team

Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description

Exclusion List of Maintenance Plans to be Started 







Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction
Verify Record CountSyWay A2D Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

Business

Completeness

TaskAction
Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Verify that the EAM Maintenance Plant Start data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the EAM Maintenance Plant Start data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Maintenance Plant Start is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 28) Apr 13, 2026 08:30 PUN-ext, Eddy CR0438 - Active (JEST-INAC <> 'X')
v. 101 Apr 13, 2026 08:03 PUN-ext, Eddy
v. 100 Apr 07, 2026 10:20 PUN-ext, Eddy
v. 99 Apr 07, 2026 10:18 PUN-ext, Eddy
v. 98 Mar 03, 2026 12:18 ERGUIZA-ext, Pinky Love
v. 97 Feb 19, 2026 11:00 PUN-ext, Eddy
v. 96 Feb 19, 2026 10:57 PUN-ext, Eddy
v. 95 Feb 19, 2026 10:55 PUN-ext, Eddy
v. 94 Feb 19, 2026 10:50 PUN-ext, Eddy
v. 93 Jan 28, 2026 15:13 PUN-ext, Eddy

Go to Page History

  • No labels